ML17320B011

From kanterella
Jump to navigation Jump to search
Proposed Emergency Tech Spec Change Re Refueling Operations
ML17320B011
Person / Time
Site: Cook 
Issue date: 04/24/1984
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320B010 List:
References
NUDOCS 8404300026
Download: ML17320B011 (3)


Text

Mr. Harold R. Dento ATTACHMENT TO AEP:NRC:0890 PROPOSED REVISION TO TECHNICAL SPECIFICATION PAGE 8404300026 84042'4 PDR ADOCK 050003ih, P

PDR

ka

~-

('

REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.

APPLICABILITY:

MODE 6.

ACTION:

With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes.*The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:

a.

A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.

A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and c.

A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.

  • During the 1984 refueling outage only, removal of the last 30 assemblies is allowed with only one source range neutron flux monitor operating.

D.

C.

COOK - UNIT 2 3/4 9-2