ML17331B048: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period July 93 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 | {{#Wiki_filter:N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS | ||
If Any (Net MWe) | : 1. Unit Name D. C. Cook Unit 1 | ||
: 2. Reporting Period July 93 notes | |||
25.If Shut Down At End of Report: Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation): | : 3. Licensed Thermal Power (MWt) 3250 Rev. 1 | ||
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | : 4. Name Plate Rating (Gross MWe) 1152 Corrected the Gross | ||
: 5. Design Electrical Rating (Net MWe) 1020 Generation YTD | |||
: 6. Maximum Dependable Capacity (GROSS MWe) 1056 22/Oct/93 DG Turner | |||
: 7. Maximum Dependable Capacity (Net MWe) 1000 | |||
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons | |||
: 9. Power Level To Which Restricted. | |||
: 10. Reasons For Restrictions. If Any: | |||
If Any (Net MWe) | |||
This Mo. Yr. to Date Cumm. | |||
: 11. Hours in Reporting Period 744.0 5087.0 162887.0 | |||
: 12. No. of Hrs. Reactor Was Critical 744.0 5087.0 121981.4 | |||
: 13. Reactor Reserve Shutdown Hours 0 ' 0.0 463.0 | |||
: 14. Hours Generator on Line 744.0 5087.0 119935.6 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 321 ' | |||
: 16. Gross Therm. Energy Gen. (MWH) 2408039 16317784 351760107 | |||
: 17. Gross Elect. Energy Gen. (MWH) 774020 5295110 114238470 | |||
: 18. Net Elect. Energy Gen. (MWH) 746796 5109331 109871696 | |||
: 19. Unit Service Factor 100.0 100.0 74.6 | |||
: 20. Unit Availability Factor 100.0 100.0 74 6 | |||
: 21. Unit Capacity Factor (MDC Net) 100.4 100.4 67 1 | |||
~ | |||
: 22. Unit Capacity Factor (DER Net) 98.4 98.5 65.4 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 6.2 | |||
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration): | |||
None | |||
: 25. If Shut Down At End of Report: Period, Estimated Date of Startup: | |||
: 26. Units in Test Status (Prior to Commercial Operation): | |||
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
( 9311160039 931105 PDR ADOCK 05000315 | |||
.R P,DR | |||
P ~ | |||
I L | |||
t U | |||
vf V}} | |||
Revision as of 13:04, 22 October 2019
| ML17331B048 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1993 |
| From: | Janisse J, Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17331B046 | List: |
| References | |
| NUDOCS 9311160039 | |
| Download: ML17331B048 (2) | |
Text
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1
- 2. Reporting Period July 93 notes
- 3. Licensed Thermal Power (MWt) 3250 Rev. 1
- 4. Name Plate Rating (Gross MWe) 1152 Corrected the Gross
- 5. Design Electrical Rating (Net MWe) 1020 Generation YTD
- 6. Maximum Dependable Capacity (GROSS MWe) 1056 22/Oct/93 DG Turner
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted.
- 10. Reasons For Restrictions. If Any:
If Any (Net MWe)
This Mo. Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 5087.0 162887.0
- 12. No. of Hrs. Reactor Was Critical 744.0 5087.0 121981.4
- 13. Reactor Reserve Shutdown Hours 0 ' 0.0 463.0
- 14. Hours Generator on Line 744.0 5087.0 119935.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321 '
- 16. Gross Therm. Energy Gen. (MWH) 2408039 16317784 351760107
- 17. Gross Elect. Energy Gen. (MWH) 774020 5295110 114238470
- 18. Net Elect. Energy Gen. (MWH) 746796 5109331 109871696
- 19. Unit Service Factor 100.0 100.0 74.6
- 20. Unit Availability Factor 100.0 100.0 74 6
- 21. Unit Capacity Factor (MDC Net) 100.4 100.4 67 1
~
- 22. Unit Capacity Factor (DER Net) 98.4 98.5 65.4
- 23. Unit Forced Outage Rate 0.0 0.0 6.2
- 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
None
- 25. If Shut Down At End of Report: Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
( 9311160039 931105 PDR ADOCK 05000315
.R P,DR
P ~
I L
t U
vf V