ML17331B048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period July 93 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 notes Rev.1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
{{#Wiki_filter:N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
If Any (Net MWe)10.Reasons For Restrictions.
: 1. Unit Name                     D. C. Cook Unit 1
If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.to Date 744.0 5087.0 744.0 5087.0 0'0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm.162887.0 121981.4 463.0 119935.6 321'351760107 114238470 109871696 74.6 74 6 67~1 65.4 6.2 Duration):
: 2. Reporting Period                           July 93 notes
25.If Shut Down At End of Report: Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
: 3. Licensed Thermal Power (MWt)                   3250   Rev. 1
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved (9311160039 931105 PDR ADOCK 05000315.R P,DR P~I t L U vf V}}
: 4. Name Plate Rating (Gross MWe)                 1152   Corrected the Gross
: 5. Design Electrical Rating (Net MWe)             1020   Generation YTD
: 6. Maximum Dependable Capacity (GROSS MWe) 1056           22/Oct/93 DG Turner
: 7. Maximum Dependable Capacity (Net MWe)         1000
: 8. If   Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted.
: 10. Reasons For Restrictions.      If Any:
If Any (Net MWe)
This  Mo. Yr. to Date    Cumm.
: 11. Hours   in Reporting Period                 744.0        5087.0  162887.0
: 12. No. of Hrs. Reactor   Was Critical       744.0        5087.0  121981.4
: 13. Reactor Reserve Shutdown Hours                 0 '          0.0      463.0
: 14. Hours Generator on Line                     744.0        5087.0  119935.6
: 15. Unit Reserve Shutdown Hours                     0.0          0.0      321 '
: 16. Gross Therm. Energy Gen. (MWH)           2408039      16317784  351760107
: 17. Gross Elect. Energy Gen. (MWH)             774020        5295110  114238470
: 18. Net Elect. Energy Gen. (MWH)               746796        5109331  109871696
: 19. Unit Service Factor                         100.0        100.0      74.6
: 20. Unit Availability Factor                     100.0        100.0      74 6
: 21. Unit Capacity Factor (MDC Net)               100.4        100.4      67 1
                                                                              ~
: 22. Unit Capacity Factor (DER Net)               98.4          98.5      65.4
: 23. Unit Forced Outage Rate                         0.0         0.0         6.2
: 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
None
: 25. If Shut   Down At End of Report: Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forcast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
(     9311160039 931105 PDR   ADOCK 05000315
      .R               P,DR
 
P   ~
I L
t U
vf V}}

Revision as of 13:04, 22 October 2019

Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date
ML17331B048
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1993
From: Janisse J, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160039
Download: ML17331B048 (2)


Text

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period July 93 notes
3. Licensed Thermal Power (MWt) 3250 Rev. 1
4. Name Plate Rating (Gross MWe) 1152 Corrected the Gross
5. Design Electrical Rating (Net MWe) 1020 Generation YTD
6. Maximum Dependable Capacity (GROSS MWe) 1056 22/Oct/93 DG Turner
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If Any:

If Any (Net MWe)

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 5087.0 162887.0
12. No. of Hrs. Reactor Was Critical 744.0 5087.0 121981.4
13. Reactor Reserve Shutdown Hours 0 ' 0.0 463.0
14. Hours Generator on Line 744.0 5087.0 119935.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321 '
16. Gross Therm. Energy Gen. (MWH) 2408039 16317784 351760107
17. Gross Elect. Energy Gen. (MWH) 774020 5295110 114238470
18. Net Elect. Energy Gen. (MWH) 746796 5109331 109871696
19. Unit Service Factor 100.0 100.0 74.6
20. Unit Availability Factor 100.0 100.0 74 6
21. Unit Capacity Factor (MDC Net) 100.4 100.4 67 1

~

22. Unit Capacity Factor (DER Net) 98.4 98.5 65.4
23. Unit Forced Outage Rate 0.0 0.0 6.2
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

None

25. If Shut Down At End of Report: Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

( 9311160039 931105 PDR ADOCK 05000315

.R P,DR

P ~

I L

t U

vf V