{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONST TION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9101220129 DOC.DATE: 90/12/31 NOTARIZED:
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONST                                     TION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFXLXATXON HALE,M.W.Carolina Power&Light Co.RICHEY,R.B.
ACCESSION NBR:9101220129               DOC.DATE:   90/12/31   NOTARIZED: NO         DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                   05000400 AUTH. NAME           AUTHOR AFFXLXATXON HALE,M.W.           Carolina Power         &   Light Co.
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFXLIATION DOCKET 05000400
RICHEY,R.B.         Carolina Power         &   Light Co.
RECIP.NAME           RECIPIENT AFFXLIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Dec 1990 for Harris Nuclear Power Plant.W/910115 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.05000400 RECXPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR DLPQ LPEB10 EG FILE 0 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA XRM TECH ADV NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept           for   Dec 1990 for Harris Nuclear Power Plant.W/910115         ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 C
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL     SIZE:
CARL Carolina Power&Light Company P.O.Box 165~New Hill, N.C.27562R.B.RICHEY Vice President Harris Nuclear Project JAN f 5 199I HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, North Carolina 27562 File Number'SHF/10-15505 Letter Number: HO-913001 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.1 DOCKET NO.50-400 LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT
TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.                                         05000400 RECXPIENT               COPIES            RECIPIENT        COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL PD2-1 LA                     3      3      PD2-1 PD              1    1 BECKER,D                     1      1 INTERNAL: ACRS                         10    10      AEOD/DOA              1    1 AEOD/DSP/TPAB                 1      1      XRM TECH ADV          2    2 NRR DLPQ LPEB10               1      1      NRR/DOEA/OEAB        1    1 EG   FILE         0         1      1      RGN2                  1    1 EXTERNAL: EG&G BRYCE,J.H                 1     1     NRC PDR               1     1 NSIC                          1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 26   ENCL   26


==Dear Sirs:==
C CARL Carolina Power & Light Company P. O. Box 165 ~ New Hill, N. C. 27562 R. B. RICHEY Vice President                    HARRIS NUCLEAR PROJECT Harris Nuclear Project                      P. 0. Box 165 New  Hill, North        Carolina            27562 JAN f 5 199I File Number'SHF/10-15505 Letter Number: HO-913001 (0)
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company herewith submits the report of'operation statistics and shutdown experience for the month of December 1990.Yours very truly, R.B.Richey Vice President Harris Nuclear Project MWH:smh Enclosure cc: Mr.S.D.Ebneter"(NRC-RII)
Document      Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Mr.R.G.Oehl (DOE)Mr.J.E.Tedrow (NRC-SHNPP) i 9101220129'01231 PDR ADOCK 05000400 PDR 22O Ok!SDATAEEPD/1/OE4 z(gs t ,9 S t 7 C ,1~"~a~i.", u p~
 
DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: December 1990 COMPLETED BY: Mark Hale OPERATIONS
==Dear     Sirs:==
 
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of 'operation statistics and shutdown experience for the month of December 1990.
Yours very           truly, R. B. Richey Vice President Harris Nuclear Project MWH:smh Enclosure cc:       Mr. S. D. Ebneter "(NRC-RII)
Mr. R. G. Oehl (DOE)
Mr. J. E. Tedrow (NRC-SHNPP) 9101220129'01231 PDR       ADOCK       05000400 i                            PDR z(gs t 22O Ok!SDATAEEPD/1/OE4                                                                 ,9
 
S t
,1 ~
7 "~a ~ i.   ", u C
p ~
 
DOCKET NO.:       050-400 UNIT:       Harris Unit 1 DATE:       December 1990 COMPLETED BY:   Mark Hale OPERATIONS  


==SUMMARY==
==SUMMARY==
Harris Unit 1 operated at a 73.73 percent Availability Factor for the referenced month and a 67.12 percent Capacity Factor.There were two events.Details are provided on the Unit Shutdowns and Power Reduction Sheet.There are 157 fuel assemblies in the reactor vessel and 418 spent fuel assemblies in the Spent Fuel Pools.306 of the spent fuel assemblies are BWR and were shipped to Harris from CP6L's Brunswick Plant.Eight of the spent fuel assemblies in the Spent Fuel Pools are from CP&L's Robinson Plant with 6 additional assemblies on site and awaiting off loading to the Spent Fuel Pools.MEM/DATAREPa/1/OS4 P  
 
,,".PIt I CO IDUN DATE 61t6W91 RUN TIME 13:59:82 PL~PERFORMANCE DATA SYSTEH~'ERATIHG DATA REPORT HARRIS, UNIT 1 PAGE RPD36-668 OPERA'I'ING STATUS DOCI<ET HO.650-400 COMPLETED BY NARK W.HALE'I'ELEPIIONE
Harris Unit   1 operated at a 73.73 percent Availability Factor for the referenced month and a 67.12 percent Capacity Factor.         There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheet.
<919)362"2944 UNIT NAME: IIARRIS UNIT 1 NOTES 2.RLPORTING PERIOD: DECEMBER YO I 3.LICENSED THERMAL POWER (MWT): 2775 I 4.HAHEPLATE RATING (GROSS HWE): 950.9 I~5.DESIGN ELECTRICAL RATING<HEl'WE): 900.8 I 6.HAX DEPENDABLE CAPACITY (GROSS HME): 926.0 I 7.HAX DEPENDABLE CAPACITY (HET MWE): 860.0 8.IF Cl]AHGES OCCUR IH CAPACIl'Y RAl'IHGB (ITEMS 3 l'IIRU GIVE REASONS: N/A See operations summaryl I I l I I ()SINCE LAST REPORT, 9.POWER LEVEL TO MHICII REBTRIUTED II'HY (HET HWE): None.10.REASONS FOR RESTf<ICTIOH IF AHY: N/A THIb HONTI3 YR TO DATE UUNUL Al'IVE HOUI(S IN REf'ORTING PERIOD 744.00'760.00 32161.68 12.NUMBER OF I1OURB REACTOR Ul<ITIUAI 552.56 7848.52 25846.09 13.fIEACTOR RESERVE SHUTDOMN HRS.80.00.00 14.IIOURB GENERATOR ON LINE 548.52 7813.68 25472.35 15.UNIT RESERVE SHUTDOWN HOURS.00'80.88 16.GRUBS TIIERNAL ENERGY GEH.(NWH)1402076.52 26513565.96 67655244.36 17.GROSS ELEC.EHEftGY GEH.(MWI3)467080.00 6801672.00 22251934.68 18.HET ELEC.LNERGY GENERATED (HWH)429488.06 6339662.68 26677170.00 19.UNIT SERVICE FACTOR 73.73 89.19 79.20 26.UNIT A VAILABILI r Y FACTOR 73.73 89.19 79.26 21.UNIT CAP.FACTOR<USING HDC HET)67.12 84.14 74.76 22.UNIT CAP.FACTOR (USING DER HET)64.14 80.46 71.44 23.UNIT FORCED OUl'AGE RATE 26,27 4.83 4.67 24.BIIUTDOMNB BCHED.OVER HEX'I'HONTIIS (TYPE, DATE, AND DURAl'ION OF EACI3): Refueling Outage, March 16th, 1991 9 weeks critial path.25.IF SIIUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UHITS IN TEST STATUS (PRIOR'I'0 COMMERCIAL OPLRATION):
There are   157 fuel assemblies   in the reactor vessel and 418 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP6L's Brunswick Plant. Eight of the spent fuel assemblies in the Spent Fuel Pools are from CP&L's Robinson Plant with 6 additional assemblies on site and awaiting off loading to the Spent Fuel Pools.
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 MEN/DATREPa/2/OS4  
MEM/DATAREPa/1/OS4
,COL CO RUH.D'A I'E 03/08/9f RUN TIHE<3: 59: 30 PLA~PERFORMANCE DATA SYSTEM~PAGE APPEHDI~-AVERAGE DAILY POWER LEVEL~RPD39-009 HARRIS UNIT 1 DECEMBER 1990 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET HO.050-400 COMPLETED BY HARK W.HALE TELEPI]OHE (919)362-2944 DAY AVG.DAILY POWER LEVEL (MWE-HEI')
 
882-29 20 874 868 861 379 868 27 750 30).f6-8 MEM/DATAREPa/3/OS4 UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: December 1990 UNIT NAME: Harris DATE: I/7/91 COMPLETED BY: M.W.Hale TELEPHONE:
P
(919)362"2944 No.Date Tl y P e Duration (Hours)R Method of Shutting Down Reactor Licensee Event Report S System Code 4 Component Code 5 Cause 8, Corrective Action to Prevent Recurrence 90-019 901201 195.48 N/A HC Valve Unit removed from service from 90$power after chemistry data indicated a large condenser tube leak.The root cause investigation determined a failed open heater drain valve created enough flow force to fail the impingement plate for the drain valve at condenser penetration 46.The impingement plate damaged numerous condenser tubes as it fell into the hotwell.The heater drain valve and impingement plate were repaired and 35 condenser tubes were plugged.-New design for impingement plates are under evaluation.
,,".PIt I   CO                     PL~  PERFORMANCE DATA SYSTEH                        PAGE IDUN   DATE   61t6W91             ~'ERATIHG    DATA REPORT                          RPD36-668 RUN TIME       13:59:82                 HARRIS, UNIT 1 DOCI<ET HO. 650-400 COMPLETED BY NARK W. HALE OPERA'I'ING STATUS                                        'I'ELEPIIONE <919)362 "2944 UNIT NAME:   IIARRIS UNIT 1                       NOTES See    operations summaryl
Unit returned to service on 12/10/90.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Rfueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)3 Method: 1&anua I 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6&ther 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source MEM/DATAREPa/4/OS4 a
: 2. RLPORTING PERIOD: DECEMBER YO                     I                                     I
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: December 1990 UNIT NAME: Harris DATE: I/7/91 COMPLETED BY: M.W.Hale TELEPHONE:
: 3. LICENSED THERMAL POWER (MWT): 2775                 I                                      I
(919)362-2944 No.Date Tl y p e Duration (Hours)R ,s Method of Shutting Down Reactor Licensee Event Report l System Code 4 Component Code 5 Cause 8, Corrective Action to Prevent Recurrence 90-020 901229 0.0 N/A HC Pipe Reduced unit power to 30$power due to tube leaks in the east side of the condenser.
: 4. HAHEPLATE RATING (GROSS HWE): 950.9               I                                     l
The 2 leaking tubes were plugged and the lA Main Feedwater Pump and motor were realigned to reduce a previously identified high vibration problem.The unit was paused at 65'ower following the repairs to perform routine turbine valve testing.Unit was returned to 100$on 12/30/90 at 6:50 a.m.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source MEM/DATAREPa/5/OS4  
  ~5. DESIGN ELECTRICAL RATING <HEl'WE): 900.8           I                                     I
~~c>c.~'}}
: 6. HAX DEPENDABLE CAPACITY (GROSS HME): 926.0 I                                             I
: 7. HAX DEPENDABLE CAPACITY (HET MWE): 860.0
: 8. IF Cl]AHGES OCCUR IH CAPACIl'Y RAl'IHGB (ITEMS 3 l'IIRU () SINCE          LAST REPORT, GIVE REASONS:     N/A
: 9. POWER LEVEL TO MHICII REBTRIUTED   II'HY (HET   HWE): None.
: 10. REASONS FOR RESTf<ICTIOH IF AHY:   N/A THIb             YR TO         UUNUL HONTI3            DATE         Al'IVE HOUI(S IN REf'ORTING PERIOD                 744.00           '760.00         32161.68
: 12. NUMBER OF I1OURB REACTOR Ul<ITIUAI         552.56             7848.52       25846.09 13.
14.
15.
16.
fIEACTOR RESERVE SHUTDOMN HRS IIOURB GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GRUBS TIIERNAL ENERGY GEH. (NWH)
                                                          .80 548.52
                                                          .00 1402076.52
                                                                    '80 26513565.96
                                                                              .00 7813.68
                                                                                              .00 25472.35
                                                                                              .88 67655244.36
: 17. GROSS ELEC. EHEftGY GEH. (MWI3)         467080.00         6801672.00     22251934.68
: 18. HET ELEC. LNERGY GENERATED (HWH)         429488.06         6339662.68     26677170.00
: 19. UNIT SERVICE FACTOR                         73.73               89.19           79.20
: 26. UNIT AVAILABILIr Y FACTOR                   73.73               89.19           79.26
: 21. UNIT CAP. FACTOR <USING HDC HET)             67.12               84.14           74.76
: 22. UNIT CAP. FACTOR (USING DER HET)             64.14               80.46           71.44
: 23. UNIT FORCED OUl'AGE RATE                     26,27               4.83             4.67
: 24. BIIUTDOMNB BCHED. OVER HEX'I'   HONTIIS (TYPE, DATE,     AND DURAl'ION OF EACI3):
Refueling Outage,       March 16th, 1991           9 weeks     critial path.
: 25. IF SIIUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UHITS IN TEST STATUS (PRIOR 'I'0 COMMERCIAL OPLRATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MEN/DATREPa/2/OS4
 
,COL   CO RUH. D'A I'E 03 /08/9f PLA~PERFORMANCE DATA SYSTEM APPEHDI~ AVERAGE DAILY POWER LEVEL
                                                                    ~
                                                                    ~      PAGE RPD39-009 RUN  TIHE    < 3: 59: 30          HARRIS UNIT 1 DOCKET HO. 050-400 COMPLETED BY HARK W. HALE TELEPI]OHE (919)362-2944 DECEMBER            1990 DAY    AVG. DAILY POWER LEVEL      DAY   AVG. DAILY POWER LEVEL (MWE-NET)                        (MWE-HEI')
882
                    -29                               874 20 868 861 379 868               27 750 30
                                  ).f6 - 8 MEM/DATAREPa/3/OS4
 
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:             I/7/91 COMPLETED BY:     M. W. Hale TELEPHONE:       (919) 362"2944 REPORT MONTH:  December  1990 Tl                        R      Method No.         Date         y       Duration                of        Licensee      System Component            Cause  8, Corrective P         (Hours)             Shutting     Event       Code 4 Code 5                   Action to e                                Down      Report S                                  Prevent Recurrence Reactor Unit removed from service from 90$
90-019         901201               195.48                               N/A         HC   Valve   power after chemistry data indicated a large condenser tube leak.     The root cause investigation determined a failed open heater drain valve created enough flow force to fail the impingement plate for the drain valve at condenser penetration 46. The impingement plate damaged numerous condenser tubes as   it fell into   the hotwell. The heater drain valve and impingement plate were repaired and 35 condenser tubes were plugged. -New design for impingement plates are under evaluation. Unit returned to service on 12/10/90.
I                       2                                                  3                            4 F: Forced               Reason:                                            Method:                      Exhibit G-Instructions S: Scheduled           A-Equipment Failure (Explain)                     1&anua I                      for Preparation of Data B-Maintenance or Test                             2-Manual Scram                Entry Sheets for Licensee C-Rfueling                                         3-Automatic Scram            Event Report (LER)    File D-Regulatory Restriction                           4-Continued                  (NUREG-0161)
E-Operator Training & License Examination         5-Reduced Load F-Administrative                                  6&ther                       5 G-Operational Error (Explain)                                                   Exhibit I - Same   Source MEM/DATAREPa/4/OS4
 
a UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:             I/7/91 COMPLETED BY:     M. W. Hale TELEPHONE:       (919) 362-2944 REPORT MONTH:  December  1990 Tl                        R      Method No.         Date       y         Duration                of        Licensee      System  Component            Cause  8, Corrective p         (Hours)             Shutting     Event       Code 4   Code 5                   Action to e                        ,s      Down Reactor Report  l                                  Prevent Recurrence Reduced  unit power to 30$ power due 90-020       901229                 0.0                               N/A           HC     Pipe   to tube leaks in the east side of the condenser. The 2 leaking tubes were plugged and the lA Main Feedwater Pump and motor were realigned to reduce a previously identified high vibration problem. The unit was paused at following the repairs to perform 65'ower routine turbine valve testing.       Unit was returned to     100$ on 12/30/90 at 6:50 a.m.
I                       2                                                    3                          4 F:   Forced             Reason:                                              Method:                    Exhibit G-Instructions S:   Scheduled         A-Equipment Failure (Explain)                         I-Manual                  for Preparation of Data 8-Maintenance or Test                                 2-Manual Scram              Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram          Event Report (LER)    File D-Regulatory Restriction                             4-Continued                (NUREG-0161)
E-Operator Training 4 License Examination             5-Reduced Load F-Administrative                                     6-Other                    5 G-Operational Error (Explain)                                                     Exhibit  I  Same    Source H-Other (Explain)
MEM/DATAREPa/5/OS4
 
    ~~
c > c.
~'}}

Revision as of 05:35, 22 October 2019

Monthly Operating Rept for Dec 1990 for Harris Nuclear Power Plant.W/910115 Ltr
ML18009A778
Person / Time
Site: Harris 
Issue date: 12/31/1990
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913001-(O), NUDOCS 9101220129
Download: ML18009A778 (12)


Text

ACCELERATED DISTRIBUTION DEMONST TION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9101220129 DOC.DATE: 90/12/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFXLXATXON HALE,M.W. Carolina Power & Light Co.

RICHEY,R.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFXLIATION

SUBJECT:

Monthly operating rept for Dec 1990 for Harris Nuclear Power Plant.W/910115 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed. 05000400 RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1 PD 1 1 BECKER,D 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 XRM TECH ADV 2 2 NRR DLPQ LPEB10 1 1 NRR/DOEA/OEAB 1 1 EG FILE 0 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

C CARL Carolina Power & Light Company P. O. Box 165 ~ New Hill, N. C. 27562 R. B. RICHEY Vice President HARRIS NUCLEAR PROJECT Harris Nuclear Project P. 0. Box 165 New Hill, North Carolina 27562 JAN f 5 199I File Number'SHF/10-15505 Letter Number: HO-913001 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of 'operation statistics and shutdown experience for the month of December 1990.

Yours very truly, R. B. Richey Vice President Harris Nuclear Project MWH:smh Enclosure cc: Mr. S. D. Ebneter "(NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP) 9101220129'01231 PDR ADOCK 05000400 i PDR z(gs t 22O Ok!SDATAEEPD/1/OE4 ,9

S t

,1 ~

7 "~a ~ i. ", u C

p ~

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: December 1990 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 73.73 percent Availability Factor for the referenced month and a 67.12 percent Capacity Factor. There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 418 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP6L's Brunswick Plant. Eight of the spent fuel assemblies in the Spent Fuel Pools are from CP&L's Robinson Plant with 6 additional assemblies on site and awaiting off loading to the Spent Fuel Pools.

MEM/DATAREPa/1/OS4

P

,,".PIt I CO PL~ PERFORMANCE DATA SYSTEH PAGE IDUN DATE 61t6W91 ~'ERATIHG DATA REPORT RPD36-668 RUN TIME 13:59:82 HARRIS, UNIT 1 DOCI<ET HO. 650-400 COMPLETED BY NARK W. HALE OPERA'I'ING STATUS 'I'ELEPIIONE <919)362 "2944 UNIT NAME: IIARRIS UNIT 1 NOTES See operations summaryl

2. RLPORTING PERIOD: DECEMBER YO I I
3. LICENSED THERMAL POWER (MWT): 2775 I I
4. HAHEPLATE RATING (GROSS HWE): 950.9 I l

~5. DESIGN ELECTRICAL RATING <HEl'WE): 900.8 I I

6. HAX DEPENDABLE CAPACITY (GROSS HME): 926.0 I I
7. HAX DEPENDABLE CAPACITY (HET MWE): 860.0
8. IF Cl]AHGES OCCUR IH CAPACIl'Y RAl'IHGB (ITEMS 3 l'IIRU () SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO MHICII REBTRIUTED II'HY (HET HWE): None.
10. REASONS FOR RESTf<ICTIOH IF AHY: N/A THIb YR TO UUNUL HONTI3 DATE Al'IVE HOUI(S IN REf'ORTING PERIOD 744.00 '760.00 32161.68
12. NUMBER OF I1OURB REACTOR Ul<ITIUAI 552.56 7848.52 25846.09 13.

14.

15.

16.

fIEACTOR RESERVE SHUTDOMN HRS IIOURB GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GRUBS TIIERNAL ENERGY GEH. (NWH)

.80 548.52

.00 1402076.52

'80 26513565.96

.00 7813.68

.00 25472.35

.88 67655244.36

17. GROSS ELEC. EHEftGY GEH. (MWI3) 467080.00 6801672.00 22251934.68
18. HET ELEC. LNERGY GENERATED (HWH) 429488.06 6339662.68 26677170.00
19. UNIT SERVICE FACTOR 73.73 89.19 79.20
26. UNIT AVAILABILIr Y FACTOR 73.73 89.19 79.26
21. UNIT CAP. FACTOR <USING HDC HET) 67.12 84.14 74.76
22. UNIT CAP. FACTOR (USING DER HET) 64.14 80.46 71.44
23. UNIT FORCED OUl'AGE RATE 26,27 4.83 4.67
24. BIIUTDOMNB BCHED. OVER HEX'I' HONTIIS (TYPE, DATE, AND DURAl'ION OF EACI3):

Refueling Outage, March 16th, 1991 9 weeks critial path.

25. IF SIIUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UHITS IN TEST STATUS (PRIOR 'I'0 COMMERCIAL OPLRATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MEN/DATREPa/2/OS4

,COL CO RUH. D'A I'E 03 /08/9f PLA~PERFORMANCE DATA SYSTEM APPEHDI~ AVERAGE DAILY POWER LEVEL

~

~ PAGE RPD39-009 RUN TIHE < 3: 59: 30 HARRIS UNIT 1 DOCKET HO. 050-400 COMPLETED BY HARK W. HALE TELEPI]OHE (919)362-2944 DECEMBER 1990 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-HEI')

882

-29 874 20 868 861 379 868 27 750 30

).f6 - 8 MEM/DATAREPa/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: I/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362"2944 REPORT MONTH: December 1990 Tl R Method No. Date y Duration of Licensee System Component Cause 8, Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report S Prevent Recurrence Reactor Unit removed from service from 90$

90-019 901201 195.48 N/A HC Valve power after chemistry data indicated a large condenser tube leak. The root cause investigation determined a failed open heater drain valve created enough flow force to fail the impingement plate for the drain valve at condenser penetration 46. The impingement plate damaged numerous condenser tubes as it fell into the hotwell. The heater drain valve and impingement plate were repaired and 35 condenser tubes were plugged. -New design for impingement plates are under evaluation. Unit returned to service on 12/10/90.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1&anua I for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Rfueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6&ther 5 G-Operational Error (Explain) Exhibit I - Same Source MEM/DATAREPa/4/OS4

a UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: I/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: December 1990 Tl R Method No. Date y Duration of Licensee System Component Cause 8, Corrective p (Hours) Shutting Event Code 4 Code 5 Action to e ,s Down Reactor Report l Prevent Recurrence Reduced unit power to 30$ power due 90-020 901229 0.0 N/A HC Pipe to tube leaks in the east side of the condenser. The 2 leaking tubes were plugged and the lA Main Feedwater Pump and motor were realigned to reduce a previously identified high vibration problem. The unit was paused at following the repairs to perform 65'ower routine turbine valve testing. Unit was returned to 100$ on 12/30/90 at 6:50 a.m.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 4 License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain)

MEM/DATAREPa/5/OS4

~~