{{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT | {{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORING SYSTEM TECHNICAL SPECIFICATION PAGES 9402150131 940204 PDR ADOt K 05000400 PDR | ||
'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.APPLICABILITY: | |||
MODES 1 and 2.ACTION: a..With one hydrogen monito~inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours.b.With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours.SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of , an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing: | 'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE. | ||
a.Two volume percent hydrogen, balance nitrogen;and-"--b.Six volume percent hydrogen, balance nitrogen.SHEARON HARRIS-UNIT 1 3/4 6-30 CONTAINMENT | APPLICABILITY: MODES 1 and 2. | ||
MODES 1 and 2.ACTION: a. | ACTION: | ||
a.Two volume percent hydrogen, balance nitrogen, and b.Six volume percent hydrogen, balance nitrogen.SHEARON HARRIS-UNIT 1 3/4 6-30 Amendment No.}} | a.. With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours. | ||
: b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours. | |||
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of , an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing: | |||
: a. Two volume percent hydrogen, balance nitrogen; and-"-- | |||
: b. Six volume percent hydrogen, balance nitrogen. | |||
SHEARON HARRIS - UNIT 1 3/4 6-30 | |||
CONTAINMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4. 1 Two independent containment hydrogen monitors shall be OPERABLE. | |||
APPLICABILITY: MODES 1 and 2. | |||
ACTION: | |||
: a. With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours. | |||
: b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours. | |||
SURVEILLANCE REQUIREMENTS 4.6.4. 1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing: | |||
: a. Two volume percent hydrogen, balance nitrogen, and | |||
: b. Six volume percent hydrogen, balance nitrogen. | |||
SHEARON HARRIS - UNIT 1 3/4 6-30 Amendment No.}} | |||
Revision as of 05:16, 22 October 2019
| ML18011A296 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/04/1994 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML18011A295 | List: |
| References | |
| NUDOCS 9402150131 | |
| Download: ML18011A296 (3) | |
Text
ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTHYDROGEN MONITORING SYSTEM TECHNICAL SPECIFICATION PAGES 9402150131 940204 PDR ADOt K 05000400 PDR
'ONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
a.. With one hydrogen monito~ inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within She next 6 hours.
- b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.4.1 Each hydrogen monItor sha11 be demonstrated OPERABLE by the performance of , an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:
SHEARON HARRIS - UNIT 1 3/4 6-30
CONTAINMENT SYSTEMS 3 4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.4. 1 Two independent containment hydrogen monitors shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
- a. With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours.
SURVEILLANCE REQUIREMENTS 4.6.4. 1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing:
SHEARON HARRIS - UNIT 1 3/4 6-30 Amendment No.