ML18022A728: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P PNU  
{{#Wiki_filter:ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P             PNU


Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION FUNCTIONAL UNIT 6.Auxil iary Feedwater a.Hanual Initiation 1J~fog-J~vmpvmps g)TCebiur-dhVSiiP Pu~~TOTAL NO.CHANNELS OF CHANNELS'TO TRIP tfpUmp g/p VIP QA p HINIHUH CHANNELS OPERABLE g/PCO P a/mm APPLICASLE HOOES X,x 3~7~A ACTION b.Automatic Actuation Logic and-Actuation Relays Steam Generator Mater Level--Low-Low 1)Start Hotor-Oriven Pumps 3/stm.gen.2/stm.gen.in any stm.gen.1,2,3 2/stm.gen.1, 2, 3 in each stm.gen.21 15k 2)Start Turbine-Drive'n Pump 3/stm.gen.2/stm.in any 2 stm.gen.gen.2/stm.gen.1, 2, 3 in each stm.gen.15k d.Safety Injection Start Hotor-Oriven Pumps e.Loss-of-Offsite Power Start Hotor-Driven Pumps and Turbine-Oriven Pump See Item l.above for all Safety Injection initiating functions and requirements.
Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION HINIHUH TOTAL NO.      CHANNELS        CHANNELS          APPLICASLE FUNCTIONAL UNIT                           OF CHANNELS      'TO TRIP          OPERABLE              HOOES      ACTION
See Item 9.below for Loss of Offsite Power initiating functions and requirements.
: 6. Auxil iary Feedwater
f.Trip of All Hain Feedwater Pumps Start Hotor-Oriven Pumps 1/pump 1/pump 1/pump 1, 2 15" TABLE 3.3-3 Continued ACTION STATEMENTS Continued)
: a. Hanual Initiation               tfpUmp 1J ~fog -J~vmpvmps               g/p VIP                                g/PCO P          X,x  3 g) TCebiur- dhVSiiP Pu~~         QA p                                 a/mm             ~7 ~A
ACTION L9-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: b. Automatic Actuation                                                                     1,2,3          21 Logic and-Actuation Relays Steam Generator Mater Level--Low-Low
a.The inoperable channel is placed in the tripped condition within j hour, and b.The Minimum Channels OPERABLE requirement is met;however, one additional channel may be bypassed for up to 2 hours for surveillance testing of other channels per Specification 4.3.2.1.ACTION 20-With less than the Minimum Number of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s)that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.ACTION 21-With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours;however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.ACTION 22-With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours.ACTION 23-With the number of OPERABLE channels less than the Total Number of Channels, declare the ass cia e equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.
: 1)   Start Hotor-               3/stm. gen.       2/stm. gen.         2/stm. gen.       1, 2, 3         15k Oriven    Pumps                              in any              in each stm. gen.           stm. gen.
ACTION 24-With'he numbe~of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours;however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.ACTION 25" During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9.SHEARON HARRIS-UNIT 1 3/4 3-27 0~'}}
: 2)   Start Turbine-             3/stm. gen.     2/stm. gen.         2/stm. gen.       1, 2, 3         15k Drive'n    Pump                              in  any            in each 2 stm. gen.        stm. gen.
: d. Safety Injection                   See Item l. above   for all Safety Injection initiating functions       and Start Hotor-Oriven        Pumps    requirements.
: e. Loss-of-Offsite Power              See Item 9. below     for Loss of Offsite     Power initiating functions Start Hotor-Driven                and requirements.
Pumps  and Turbine-Oriven    Pump
: f. Trip of All Hain                   1/pump           1/pump           1/pump           1, 2           15" Feedwater Pumps Start Hotor-Oriven    Pumps
 
TABLE 3.3-3   Continued ACTION STATEMENTS     Continued)
ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: a. The inoperable channel is placed in the tripped condition within j hour, and
: b. The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours for surveillance testing of other channels per Specification 4.3.2. 1.
ACTION 20 - With less than the   Minimum Number   of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2.       1 provided the other channel is OPERABLE.
ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours or be in at least HOT STANDBY within 6 hours and in at least HOT SHUTDOWN within the following 6 hours.
ACTION 23 - With the number of OPERABLE channels           less than the Total Number of Channels, declare the ass cia e equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.
ACTION 24 - With'he   numbe~ of OPERABLE channels one less than the Minimum Channels OPERABLE   requirement, be in at least HOT STANDBY within 6 hours; however, one channel may be bypassed for up to 2 hours for surveillance testing per Specification 4.3.2. 1 provided the other channel is   OPERABLE.
ACTION 25 " During CORE ALTERATIONS   or movement of irradiated fuel within containment, comply with the     ACTION statement of Specification 3.9.9.
SHEARON HARRIS - UNIT 1             3/4 3-27
 
0 ~'}}

Revision as of 02:38, 22 October 2019

Proposed Tech Specs Table 3.3-3, ESF Actuation Sys Instrumentation.
ML18022A728
Person / Time
Site: Harris 
Issue date: 10/26/1989
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18022A727 List:
References
NUDOCS 8911010197
Download: ML18022A728 (5)


Text

ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT AFW MANUAL INITIATION TECHNICAL SPECIFICATION PAGES 8911010197 89102b PDR ADOCK 05000400 P PNU

Y~LR ENG'INEEREO SAFETY FEATURES ACTUATION SYSTEH INSTRUMENTATION HINIHUH TOTAL NO. CHANNELS CHANNELS APPLICASLE FUNCTIONAL UNIT OF CHANNELS 'TO TRIP OPERABLE HOOES ACTION

6. Auxil iary Feedwater
a. Hanual Initiation tfpUmp 1J ~fog -J~vmpvmps g/p VIP g/PCO P X,x 3 g) TCebiur- dhVSiiP Pu~~ QA p a/mm ~7 ~A
b. Automatic Actuation 1,2,3 21 Logic and-Actuation Relays Steam Generator Mater Level--Low-Low
1) Start Hotor- 3/stm. gen. 2/stm. gen. 2/stm. gen. 1, 2, 3 15k Oriven Pumps in any in each stm. gen. stm. gen.
2) Start Turbine- 3/stm. gen. 2/stm. gen. 2/stm. gen. 1, 2, 3 15k Drive'n Pump in any in each 2 stm. gen. stm. gen.
d. Safety Injection See Item l. above for all Safety Injection initiating functions and Start Hotor-Oriven Pumps requirements.
e. Loss-of-Offsite Power See Item 9. below for Loss of Offsite Power initiating functions Start Hotor-Driven and requirements.

Pumps and Turbine-Oriven Pump

f. Trip of All Hain 1/pump 1/pump 1/pump 1, 2 15" Feedwater Pumps Start Hotor-Oriven Pumps

TABLE 3.3-3 Continued ACTION STATEMENTS Continued)

ACTION L9 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within j hour, and
b. The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2. 1.

ACTION 20 - With less than the Minimum Number of Channels OPERABLE, within l hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 21 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requi rement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.

ACTION 22 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 23 - With the number of OPERABLE channels less than the Total Number of Channels, declare the ass cia e equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.

ACTION 24 - With'he numbe~ of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1 provided the other channel is OPERABLE.

ACTION 25 " During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9.

SHEARON HARRIS - UNIT 1 3/4 3-27

0 ~'