{{#Wiki_filter:consumers Power POW ERi Nii MICHlliAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 8, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 . Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1995. If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. Sincerely, i 1Afjjl:--" AL Williams Reactor-Engineer CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Recoras Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports -* r:* ,.... -f ..... t .. , '*
{{#Wiki_filter:consumers Power POWERiNii MICHlliAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 8, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255
* t' '.,' r: -v \ ....... ,_ .* .)
    . Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1995.
i PDR ADOCK 05000255 i I , R PDR 1
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
* L : . A CMS' ENERGY COMPANY OPERATING STATUS: 1. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER CMWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) OPERATING DATA REPORT Palisades 950701-950731 2530.0 811.7 805.0 **770 **730 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED CMWH) 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0% 0.0% 0.0% 0.0% 23. UNIT FORCED OUTAGE RATE 0.0% 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): Yr-to-Date 5087.0 3394.2 3394.2 8384257.0 2720389.0 2587807.0
Sincerely,
: 66. ?"!. 66. ?"!. 69. ?"!. 63.2% 4.4% The 1995 Refueling Outage began on 5/22/95 and is scheduled for 92 days 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8/22/95 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
      ~              i     1Afjjl:--"
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION  
AL Williams Reactor-Engineer CC:       RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Recoras Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports
                              -*t ..
r:*, '*,....* -ft' '.,'
                                                      .....
r:
                            -   v \ ....... ,_.*.)
(~~~9~5~0~8~1~5~0~0~7~2--=9=5~0=73=-1~~'-----.,--~~l i     PDR       ADOCK 05000255 PDR i     I
                                                                                    ~*.
  ,   R                                                         1 L :* .
A CMS' ENERGY COMPANY
 
OPERATING DATA REPORT DOCKET NO      50-255 DATE    08-04-95 COMPLETED BY    BWBerles TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
: 1. UNIT NAME                                                         Palisades
: 2. REPORTING PERIOD:                                            950701-950731
: 3. LICENSED THERMAL POWER CMWt)                                         2530.0
: 4. NAMEPLATE RATING (GROSS MWe)                                           811.7
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                     805.0
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)                               **770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)                                 **730
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month          Yr-to-Date                  Cumulative
: 11. HOURS IN REPORTING PERIOD                                             744.0              5087.0                    207014.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                     0.0              3394.2                    117706. 2
: 13. REACTOR RESERVE SHUTDOWN HOURS
: 14. HOURS GENERATOR ON-LINE                                                 0.0              3394.2                    113056.3
: 15. UNIT RESERVE SHUTDOWN HOURS
: 16. GROSS THERMAL ENERGY GENERATED CMWH)                                     0.0          8384257.0                  246674908.0
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                 0.0          2720389.0                  78085180.0
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                   0.0          2587807.0                  73684368.0
: 19. UNIT SERVICE FACTOR                                                     0.0%              66. ?"!.                    54.6%
: 20. UNIT AVAILABILITY FACTOR                                                 0.0%              66. ?"!.                    54.6%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                     0.0%              69. ?"!.                    52.6%*
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                     0.0%               63.2%                       44.2%
: 23. UNIT FORCED OUTAGE RATE                                                 0.0%                 4.4%                      29.2%
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
The 1995 Refueling Outage began on 5/22/95 and is scheduled for 92 days
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:             8/22/95
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast                       Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
** Based on condenser backpressure
** Based on condenser backpressure
* Weighted Average (635 MWe used as MDC Net prior to October 1985) DOCKET NO DATE 50-255 08-04-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES: Cumulative 207014.0 117706. 2 113056.3 246674908.0 78085180.0 73684368.0 54.6%
* Weighted Average (635 MWe used as MDC Net prior to October 1985)
54.6% 52.6%* 44.2% 29.2% Achieved 
 
.. AVERAGE DAILY UNIT POWER LEVEL MONTH
..
__ _ DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net) 1. 0 17. 2. 0 18. 3. 0 19. 4. 0 20. 5. 0 21. 6. 0 22. 7. 0 23. 8. 0 24. 9. 0 25. 10. 0 26. 11. 0 27. 12. 0 28. 13. 0 29. 14. 0 30. 15. 0 31. 16. 0 INSTRUCTIONS:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO         50-255 UNIT    Palisades DATE      08/04/95 COMPLETED BY BWBerles MONTH ---~J~UL~Y_ __                                    TELEPHONE (616)764-8913 DAY    AVERAGE DAILY POWER LEVEL               DAY     AVERAGE DAILY POWER LEVEL (MWe Net)                                     (MWe Net)
DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 On this format, list the average. daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
: 1.               0                             17.               0
: 2.               0                             18.               0
: 3.               0                             19.               0
: 4.               0                             20.               0
: 5.               0                             21.               0
: 6.               0                             22.               0
: 7.               0                             23.               0
: 8.               0                             24.               0
: 9.               0                             25.               0
: 10.               0                             26.               0
: 11.               0                             27.               0
: 12.               0                             28.               0
: 13.               0                             29.               0
: 14.               0                             30.               0
: 15.               0                             31.               0
: 16.               0 INSTRUCTIONS:
On this format, list the average. daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.


==SUMMARY==
==SUMMARY==
OF EXPERIENCE FOR JULY 1995 The unit began the month in a scheduled Refueling Outage and remained off-line for the entire month on July.
OF OPERATIN~ EXPERIENCE FOR JULY 1995 The unit began the month in a scheduled Refueling Outage and remained off-line for the entire month on July.
" REPORT MONTH __ ..::.J=UL'""'"Y_1=9:.::.9.::..5_*
 
_ No. Date Type 1 5/22/95 s 1. F: Forced S: Scheduled Duration (Hours) 2. Reason: Reason 2 c A-Equipment Failure (Explain)
l!
B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
DOCKET NO                50-255 UNIT              Palisades DATE                08/04/95 COMPLETED BY _ _B_W_B_e_rl_e_s REPORT MONTH _ _..::.J=UL'""'"Y_1=9:.::.9.::..5_*_                                                                                   TELEPHONE    (616)764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date     Type 1           Duration          Reason 2 Method of        Licensee      System    Component  Cause &Corrective 4          5 (Hours)                    Shutting          Event        Code      Code          Action to Down Reactor 3    Report #                            Prevent Recurrence 5/22/95     s                                   c                                                          Currently in 92 day refueling outage which began 5/22/95.
: 1.                   2.                                        3.                    4.                          5.
F: Forced           Reason:                                    Method:              Exhibit G - Instructions    Exhibit I - Same Source S: Scheduled       A-Equipment Failure (Explain)             1-Manual              fdr Preparation of Data B-Maintenance or Test                     2-Manua*l Scram      Entry Sheets for Licensee C-Refue ling                               3-Automatic Scram    Event Report (LER) File D-Regulatory Restriction                   4-0ther (Explain)    (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3 Report # 3. Method: 1-Manual 2-Manua*l Scram 3-Automatic Scram 4-0ther (Explain)
                                                                                                                                                                    ,,
: 4. System Code 4 Component Code 5 Exhibit G -Instructions fdr Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
                                                                                                                                                                    \1
Cause & Corrective Action to Prevent Recurrence l! DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY __ B_W_B_e_r l_e_s TELEPHONE (616)764-8913 Currently in 92 day refueling outage which began 5/22/95. 5. Exhibit I -Same Source ,, \1 \' I}}
  ~
~
i{~
                                                                                                                                                                    \'I
~
      "}}

Revision as of 17:19, 21 October 2019

Monthly Operating Rept for Jul 1995 for Palisades Nuclear Plant.W/950808 Ltr
ML18064A856
Person / Time
Site: Palisades 
Issue date: 07/31/1995
From: Berles B, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508150072
Download: ML18064A856 (5)


Text

consumers Power POWERiNii MICHlliAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 8, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255

. Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1995.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely,

~ i 1Afjjl:--"

AL Williams Reactor-Engineer CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Recoras Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports

-*t ..

r:*, '*,....* -ft' '.,'

.....

r:

- v \ ....... ,_.*.)

(~~~9~5~0~8~1~5~0~0~7~2--=9=5~0=73=-1~~'-----.,--~~l i PDR ADOCK 05000255 PDR i I

~*.

, R 1 L :* .

A CMS' ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50-255 DATE 08-04-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 950701-950731
3. LICENSED THERMAL POWER CMWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811.7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 5087.0 207014.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 3394.2 117706. 2
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 0.0 3394.2 113056.3
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH) 0.0 8384257.0 246674908.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2720389.0 78085180.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 2587807.0 73684368.0
19. UNIT SERVICE FACTOR 0.0% 66. ?"!. 54.6%
20. UNIT AVAILABILITY FACTOR 0.0% 66. ?"!. 54.6%
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 69. ?"!. 52.6%*
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 63.2% 44.2%
23. UNIT FORCED OUTAGE RATE 0.0% 4.4% 29.2%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

The 1995 Refueling Outage began on 5/22/95 and is scheduled for 92 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8/22/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

..

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY BWBerles MONTH ---~J~UL~Y_ __ TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. 0
5. 0 21. 0
6. 0 22. 0
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 0 26. 0
11. 0 27. 0
12. 0 28. 0
13. 0 29. 0
14. 0 30. 0
15. 0 31. 0
16. 0 INSTRUCTIONS:

On this format, list the average. daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATIN~ EXPERIENCE FOR JULY 1995 The unit began the month in a scheduled Refueling Outage and remained off-line for the entire month on July.

l!

DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY _ _B_W_B_e_rl_e_s REPORT MONTH _ _..::.J=UL'""'"Y_1=9:.::.9.::..5_*_ TELEPHONE (616)764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 5 (Hours) Shutting Event Code Code Action to Down Reactor 3 Report # Prevent Recurrence 5/22/95 s c Currently in 92 day refueling outage which began 5/22/95.

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual fdr Preparation of Data B-Maintenance or Test 2-Manua*l Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

,,

\1

~

~

i{~

\'I

~

"