Text
consumers Power POW ERi Nii MICHlliAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 August 8, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255
. Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1995.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely,
~
i 1Afjjl:--"
AL Williams Reactor-Engineer CC:
RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Recoras Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports
-* r:*,.... -f t.., '*
- t' '.,' r:
v \\.......,_.*.)
(~~~9~5~0~8~1~5~0~0~7~2--=9=5~0=73=-1~~'-----.,--~~l i
PDR ADOCK 05000255 i
I R
PDR 1
- L :.
A CMS' ENERGY COMPANY
~*.
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER CMWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 950701-950731 2530.0 811.7 805.0
- 770
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED CMWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0%
0.0%
0.0%
0.0%
- 23. UNIT FORCED OUTAGE RATE 0.0%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Yr-to-Date 5087.0 3394.2 3394.2 8384257.0 2720389.0 2587807.0
- 66. ?"!.
- 66. ?"!.
- 69. ?"!.
63.2%
4.4%
The 1995 Refueling Outage began on 5/22/95 and is scheduled for 92 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
8/22/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
DOCKET NO DATE 50-255 08-04-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:
Cumulative 207014.0 117706. 2 113056.3 246674908.0 78085180.0 73684368.0 54.6%
54.6%
52.6%*
44.2%
29.2%
Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH ---~J~UL~Y __ _
DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)
- 1.
0
- 17.
- 2.
0
- 18.
- 3.
0
- 19.
- 4.
0
- 20.
- 5.
0
- 21.
- 6.
0
- 22.
- 7.
0
- 23.
- 8.
0
- 24.
- 9.
0
- 25.
- 10.
0
- 26.
- 11.
0
- 27.
- 12.
0
- 28.
- 13.
0
- 29.
- 14.
0
- 30.
- 15.
0
- 31.
- 16.
0 INSTRUCTIONS:
DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 On this format, list the average. daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATIN~ EXPERIENCE FOR JULY 1995 The unit began the month in a scheduled Refueling Outage and remained off-line for the entire month on July.
~
~
i{~
~
REPORT MONTH __
..::.J=UL'""'"Y_1=9:.::.9.::..5_* _
No.
Date Type 1 5/22/95 s
- 1.
F:
Forced S:
Scheduled Duration (Hours)
- 2.
Reason:
Reason 2 c
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #
- 3.
Method:
1-Manual 2-Manua*l Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
System Code4 Component Code5 Exhibit G - Instructions fdr Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Cause & Corrective Action to Prevent Recurrence l!
DOCKET NO 50-255 UNIT Palisades DATE 08/04/95 COMPLETED BY __
B_W_B_e_r l_e_s TELEPHONE (616)764-8913 Currently in 92 day refueling outage which began 5/22/95.
- 5.