|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:~Q ws/'~t/~~REGULATORY INFORMATION DISTRIBUTION SYSTEM<RIDS)4"'-DI'STRIBUTION FOR INCOMING MATERIAL 50-335 REC: STELLO V NRC ORG: UHRIG R E FL P4IR 8c LIGHT DOCDATE: 03/03/78'ATE RCVD: 03/07/78 DOCTYPE: LETTER NOTARIZED: | | {{#Wiki_filter:~ Q ws/'~t/~ ~ |
| NO COPIES RECEIVED | | REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS) 4 "'-DI'STRIBUTION FOR INCOMING MATERIAL 50-335 REC: STELLO V ORG: UHRIG R E DOCDATE: 03/03/78 NRC FL P4IR 8c LIGHT 'ATE RCVD: 03/07/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| LTR 3 ENCL 0 FURNISHING LIST OF COMPLETED ITEMS FOR NRC"S SATISFACITON PRIOR TO CERTAIN SPECIFED TIMES AND OPERATING CONDITIONS OF LIC NO DPR-67.PLANT NAME: ST LUCIE Oi REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:-+++++++++++++++++ | | LTR 3 ENCL 0 FURNISHING LIST OF COMPLETED ITEMS FOR NRC"S SATISFACITON PRIOR TO CERTAIN SPECIFED TIMES AND OPERATING CONDITIONS OF LIC NO DPR-67. |
| DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.<DISTRIBUTION CODE A001)FOR ACTION: INTERNAL: EXTERNAL: BR CH ONLY Y<7)I 5 E+4LTR ONL HANAUER44LTR ONLY(1)EISENHUT4wLTR ONLY(i>BAER4+LTR ONLY<1)GR IMES++LTR ONLY(1>J.MCGOUGH++LTR ONLY(1)LPDRiS FT PIERCE>FL++LTR,,ONLY (1>TIC44LTR ONLY<1)NSIC+~~LTR ONLY(i>ACRS CAT 844tLTR ONLY<16)NRC PDR44LTR ONLY<i)OELD++LTR ONLY(i>CHECK+4LTR ONLY<i)SHAO++LTR ONLY(i>BUTLER++LTR ONLY<i)J COLLINS%%LTR ONLY(i>DISTRIBUTION: | | PLANT NAME: ST LUCIE Oi REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: |
| LTR 40 ENCL 0 SIZE: 2P THE END CONTROL NBR: 78066003 il, e H h H ll ,I, K>It I3;:I'('gI l'g$litIl&1 P.o.Box 013100, MIAMI, FL 33101 0%Jill/y 4 4 II FLORIOA PGWER&LIGHT COIVIPANY Narch 3, 1978 L-78-88 Office of Nuclear Reactor Regulation Attention: | | - |
| Mr.Victor Stello, Director Division of Operating Reactors U.S.Nuclear Regulatory Commission Washington, D.C.20555
| | +++++++++++++++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE. |
| | <DISTRIBUTION CODE A001) |
| | FOR ACTION: BR CH Y<7) |
| | INTERNAL: ONLY NRC PDR44LTR ONLY<i) |
| | I 5 E+4LTR ONL OELD++LTR ONLY(i> |
| | HANAUER44LTR ONLY(1) CHECK+4LTR ONLY<i) |
| | EISENHUT4wLTR ONLY(i > SHAO++LTR ONLY(i> |
| | BAER4+LTR ONLY< 1) BUTLER++LTR ONLY<i) |
| | GR IMES++LTR ONLY(1> J COLLINS%%LTR ONLY(i > |
| | J. MCGOUGH++LTR ONLY(1) |
| | EXTERNAL: LPDRiS FT PIERCE> FL++LTR,,ONLY( 1 > |
| | TIC44LTR ONLY< 1) |
| | NSIC+~~LTR ONLY(i > |
| | ACRS CAT 844tLTR ONLY<16) |
| | DISTRIBUTION: LTR 40 ENCL 0 CONTROL NBR: 78066003 SIZE: 2P THE END |
|
| |
|
| ==Dear Nr.Stello:== | | il, e |
| Re: Com letion of Conditions of License~<~vg fgq~>ig~~g 1gp8 Og 8 Enclosure 1 to Operating License No.DPR-67 identified certain items which must be completed to the satisfaction of the Commission prior to certain specified times and operating conditions. | | H h |
| This is to advise you that the following items on that list have been completed: | | H ll ,I, |
| I.3 Installation of redundant and independent valve position indication for the mini-flow bypass valves (V-3659 and V-3660).I.5 Installation of the'ecessary hardware associated with St.Lucie Plant Unit No.1 to permit future interties, to Unit No.2.The systems to be so intertied are: a.diesel generator fuel oil storage tanks b.auxiliary feedwater system (condensate storage tank)Additionally, item M of Enclosure 1 requires certain'additional monitoring in NODE 1 if'xcore monitoring is used with less than 10,000Nl<D/NTU burnup.We wish to advise further that burnup at St.Lucie 1 exceeded 11,000 SJD/NTU as of February 13, 1978.>~0M 003'EOPLE... | | >It K |
| SERVING PEOPLE 1 I~c l Mr.Victor Stello Page Two Accordingly, we request that items I.3, I.5, and M be deleted from Enclosure 1 to License DPR-67 as conditions of license.Yours very truly, Robert E.Uhrig Vice President REU:LLL:sl cc: Mr.J.P.Harold F.Mr.P.B.Mr.M.V.O'Reilly, Region II Reis, Esquire Erickson Sinkule | | |
| \~<<>>~~/)}} | | I3;:I'('gI l'g$ litIl&1 P. o. Box 013100, MIAMI, FL 33101 0% Jill/y 44 II FLORIOA PGWER & LIGHT COIVIPANY Narch 3, 1978 L-78-88 |
| | ~<~vg Office of Nuclear Reactor Regulation fgq~ |
| | Attention: Mr. Victor Stello, Director >ig~~g 1gp8 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Og |
| | |
| | ==Dear Nr. Stello:== |
| | 8 Re: Com letion of Conditions of License to Operating License No. DPR-67 identified certain items which must be completed to the satisfaction of the Commission prior to certain specified times and operating conditions. This is to advise you that the following items on that list have been completed: |
| | I.3 Installation of redundant and independent valve position indication for the mini-flow bypass valves (V-3659 and V-3660). |
| | I.5 Installation of the'ecessary hardware associated with St. Lucie Plant Unit No. 1 to permit future interties, to Unit No. 2. The systems to be so intertied are: |
| | : a. diesel generator fuel oil storage tanks |
| | : b. auxiliary feedwater system (condensate storage tank) |
| | Additionally, item M of Enclosure 1 requires certain 'additional monitoring in NODE 1 if'xcore monitoring is used with less than 10,000Nl<D/NTU burnup. We wish to advise further that burnup at St. Lucie 1 exceeded 11,000 SJD/NTU as of February 13, 1978. |
| | >~0M 003'EOPLE... |
| | SERVING PEOPLE |
| | |
| | 1 I |
| | ~c l |
| | |
| | Mr. Victor Stello Page Two Accordingly, we request that items I.3, I.5, and M be deleted from Enclosure 1 to License DPR-67 as conditions of license. |
| | Yours very truly, Robert E. Uhrig Vice President REU:LLL:sl cc: Mr. J. P. O'Reilly, Region II Harold F. Reis, Esquire Mr. P. B. Erickson Mr. M. V. Sinkule |
| | |
| | \ |
| | ~ <<>> |
| | ~ ~ |
| | / |
| | )}} |
|
---|
Category:Letter
MONTHYEARIR 05000335/20240032024-11-0707 November 2024 Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report 2024-09-09
[Table view] |
Text
~ Q ws/'~t/~ ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS) 4 "'-DI'STRIBUTION FOR INCOMING MATERIAL 50-335 REC: STELLO V ORG: UHRIG R E DOCDATE: 03/03/78 NRC FL P4IR 8c LIGHT 'ATE RCVD: 03/07/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 3 ENCL 0 FURNISHING LIST OF COMPLETED ITEMS FOR NRC"S SATISFACITON PRIOR TO CERTAIN SPECIFED TIMES AND OPERATING CONDITIONS OF LIC NO DPR-67.
PLANT NAME: ST LUCIE Oi REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:
-
+++++++++++++++++ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
<DISTRIBUTION CODE A001)
FOR ACTION: BR CH Y<7)
INTERNAL: ONLY NRC PDR44LTR ONLY<i)
I 5 E+4LTR ONL OELD++LTR ONLY(i>
HANAUER44LTR ONLY(1) CHECK+4LTR ONLY<i)
EISENHUT4wLTR ONLY(i > SHAO++LTR ONLY(i>
BAER4+LTR ONLY< 1) BUTLER++LTR ONLY<i)
GR IMES++LTR ONLY(1> J COLLINS%%LTR ONLY(i >
J. MCGOUGH++LTR ONLY(1)
EXTERNAL: LPDRiS FT PIERCE> FL++LTR,,ONLY( 1 >
TIC44LTR ONLY< 1)
NSIC+~~LTR ONLY(i >
ACRS CAT 844tLTR ONLY<16)
DISTRIBUTION: LTR 40 ENCL 0 CONTROL NBR: 78066003 SIZE: 2P THE END
il, e
H h
H ll ,I,
>It K
I3;:I'('gI l'g$ litIl&1 P. o. Box 013100, MIAMI, FL 33101 0% Jill/y 44 II FLORIOA PGWER & LIGHT COIVIPANY Narch 3, 1978 L-78-88
~<~vg Office of Nuclear Reactor Regulation fgq~
Attention: Mr. Victor Stello, Director >ig~~g 1gp8 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Og
Dear Nr. Stello:
8 Re: Com letion of Conditions of License to Operating License No. DPR-67 identified certain items which must be completed to the satisfaction of the Commission prior to certain specified times and operating conditions. This is to advise you that the following items on that list have been completed:
I.3 Installation of redundant and independent valve position indication for the mini-flow bypass valves (V-3659 and V-3660).
I.5 Installation of the'ecessary hardware associated with St. Lucie Plant Unit No. 1 to permit future interties, to Unit No. 2. The systems to be so intertied are:
- a. diesel generator fuel oil storage tanks
- b. auxiliary feedwater system (condensate storage tank)
Additionally, item M of Enclosure 1 requires certain 'additional monitoring in NODE 1 if'xcore monitoring is used with less than 10,000Nl<D/NTU burnup. We wish to advise further that burnup at St. Lucie 1 exceeded 11,000 SJD/NTU as of February 13, 1978.
>~0M 003'EOPLE...
SERVING PEOPLE
1 I
~c l
Mr. Victor Stello Page Two Accordingly, we request that items I.3, I.5, and M be deleted from Enclosure 1 to License DPR-67 as conditions of license.
Yours very truly, Robert E. Uhrig Vice President REU:LLL:sl cc: Mr. J. P. O'Reilly, Region II Harold F. Reis, Esquire Mr. P. B. Erickson Mr. M. V. Sinkule
\
~ <<>>
~ ~
/
)