ENS 54266: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 20: | Line 20: | ||
events occurred during the time frame that the 1A & 3A Electric Board Rooms inaccessible that would have required access to these areas. | events occurred during the time frame that the 1A & 3A Electric Board Rooms inaccessible that would have required access to these areas. | ||
The NRC Resident Inspector has been notified." | The NRC Resident Inspector has been notified." | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190912en.html#en54266 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 |
Revision as of 07:30, 12 September 2019
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+2.6 h0.108 days <br />0.0155 weeks <br />0.00356 months <br />) | |
Opened: | Ryan Grimme 03:10 Sep 11, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Sep 11, 2019 |
54266 - NRC Website
| |