Line 26: |
Line 26: |
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| Entergy Nuclear Operations, Inc. ("Entergy") | | Entergy Nuclear Operations, Inc. ("Entergy") |
| is responding to Reference 1 by providing, in Attachment 1, comments on the Proposed Director's Decision Under 10 CFR 2.206.References 2 and 3 concern Entergy's response to the NRC's Request for Additional Information (RAI) regarding Operator Manual Actions (OMA). As noted in Attachment 1, Entergy has identified that the resolution of Unit 3 OMA 10 will require a physical plant modification that requires a plant outage to install. Entergy will submit a revision to the initial RAI response (Reference | | is responding to Reference 1 by providing, in Attachment 1, comments on the Proposed Director's Decision Under 10 CFR 2.206.References 2 and 3 concern Entergy's response to the NRC's Request for Additional Information (RAI) regarding Operator Manual Actions (OMA). As noted in Attachment 1, Entergy has identified that the resolution of Unit 3 OMA 10 will require a physical plant modification that requires a plant outage to install. Entergy will submit a revision to the initial RAI response (Reference |
| : 2) by August 1 7 th. 2012.There are no new commitments contained in this letter.I NL-12-109 Page 2 of 2 If you have any questions or require additional information, please contact me at 914-254-6710.Sincerely, RW/mb Attachments: | | : 2) by August 1 7 th. 2012.There are no new commitments contained in this letter.I NL-12-109 Page 2 of 2 If you have any questions or require additional information, please contact me at 914-254-6710.Sincerely, RW/mb Attachments: |
| : 1. Comments on Proposed Director's Decision Under 10 CFR 2.206 cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL IPEC NRC Resident Inspector's Office Mr. Stephen Giebel, IPEC NRC Unit 1 Project Manager Michele G. Evans, Director, Division of Operating Reactor Licensing, NRR Mrs. Bridget Frymire, New York State Department of Public Service Attachment 1 Comments on Proposed Director's Decision Under 10 CFR 2.206 Entergy Nuclear Operations, Inc.Indian Point Nuclear Generating Units 2 and 3 Docket Nos. 50-247, 50-286 NL-12-109 Attachment 1 Page 1 of 2 INDIAN POINT NUCLEAR GENERATING UNIT NOS 2 AND 3 Comments on Proposed Director's Decision Under 10 CFR 2.206 A. General Comments Section III, Conclusion, Pages 9 and 10 The letter indicates the NRC is granting the petitioner's request for identifying violations and taking enforcement actions as well as bringing IPEC into compliance. | | : 1. Comments on Proposed Director's Decision Under 10 CFR 2.206 cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL IPEC NRC Resident Inspector's Office Mr. Stephen Giebel, IPEC NRC Unit 1 Project Manager Michele G. Evans, Director, Division of Operating Reactor Licensing, NRR Mrs. Bridget Frymire, New York State Department of Public Service Attachment 1 Comments on Proposed Director's Decision Under 10 CFR 2.206 Entergy Nuclear Operations, Inc.Indian Point Nuclear Generating Units 2 and 3 Docket Nos. 50-247, 50-286 NL-12-109 Attachment 1 Page 1 of 2 INDIAN POINT NUCLEAR GENERATING UNIT NOS 2 AND 3 Comments on Proposed Director's Decision Under 10 CFR 2.206 A. General Comments Section III, Conclusion, Pages 9 and 10 The letter indicates the NRC is granting the petitioner's request for identifying violations and taking enforcement actions as well as bringing IPEC into compliance. |
Revision as of 21:58, 29 April 2019
|
---|
Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] |
Text
,Entergy Enterciy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6710 Robert Walpole Licensing Manager NL-12-109 August 1, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
References:
Comments on Proposed Director's Decision Under 10 CFR 2.206 dated July 2, 2012 regarding March 28, 2011 petition from New York State on compliance with fire protection regulations Indian Point Nuclear Generating Unit Nos. 2 and 3 Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64 1) NRC letter dated 07/02/12, from Michele Evans to Vice President, Operations, Indian Point Energy Center regarding the petition from the Attorney General of the State of New York dated March 28, 2011, to Mr. R. William Borchardt, Executive Director for Operations, about compliance with fire protection regulations at the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3.2) Entergy letter NL-12-041, 03/01/12, "Response to Request for Additional Information Regarding Operator Manual Actions." 3) Entergy letter NL-12-093, 07/11/12, "Revision to Response to Request for Additional Information Regarding Operator Manual Actions."
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. ("Entergy")
is responding to Reference 1 by providing, in Attachment 1, comments on the Proposed Director's Decision Under 10 CFR 2.206.References 2 and 3 concern Entergy's response to the NRC's Request for Additional Information (RAI) regarding Operator Manual Actions (OMA). As noted in Attachment 1, Entergy has identified that the resolution of Unit 3 OMA 10 will require a physical plant modification that requires a plant outage to install. Entergy will submit a revision to the initial RAI response (Reference
- 2) by August 1 7 th. 2012.There are no new commitments contained in this letter.I NL-12-109 Page 2 of 2 If you have any questions or require additional information, please contact me at 914-254-6710.Sincerely, RW/mb Attachments:
- 1. Comments on Proposed Director's Decision Under 10 CFR 2.206 cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL IPEC NRC Resident Inspector's Office Mr. Stephen Giebel, IPEC NRC Unit 1 Project Manager Michele G. Evans, Director, Division of Operating Reactor Licensing, NRR Mrs. Bridget Frymire, New York State Department of Public Service Attachment 1 Comments on Proposed Director's Decision Under 10 CFR 2.206 Entergy Nuclear Operations, Inc.Indian Point Nuclear Generating Units 2 and 3 Docket Nos. 50-247, 50-286 NL-12-109 Attachment 1 Page 1 of 2 INDIAN POINT NUCLEAR GENERATING UNIT NOS 2 AND 3 Comments on Proposed Director's Decision Under 10 CFR 2.206 A. General CommentsSection III, Conclusion, Pages 9 and 10 The letter indicates the NRC is granting the petitioner's request for identifying violations and taking enforcement actions as well as bringing IPEC into compliance.
It is Entergy's belief that the NRC is following the requirements and protocols established in the regulatory oversight process (ROP) as relates to these actions, and is not granting the petitioner's request. The letter should indicate that the ROP is a mature process that provides guidance to the NRC and licensees.
The items identified by NY State were items the NRC staff were well aware of and the actions taken by the NRC would have been taken regardless of the NY State petition.B. Specific Comments Suggested changes are shown as strikethroughs for delet*eas and underlines for additions.
Section II, Discussion, Page 5 Suggested Change: "However, neither the diesel generator fire aea zone..." Basis for suggested change: The IP2 Appendix R/SBO diesel generator is in Fire Zone 360 in Fire Area J and Entergy requested exemptions for OMAs in other fire zones (17, 19, 25, 39A, 43A, 45A, 46A, 47A, 50A, 270) that are also in Fire Area J. The OMA in Fire Zone 17 was approved but this zone is far distant from Fire Zone 360 -Fire Zone 360 is located on the 33' elevation of the Unit 1 Turbine Building and Fire Zone 17 is located on the 15' elevation of the Unit 2 Turbine Building, North end (Turbine Lube Oil Reservoir).
Section II, Discussion, Page 8 Suggested Change: "Exceptions to projected completion involve plant modifications for Indian Point Units No. 3 and No. 2, which will not be completed until the spring 2013 and 2014 refueling outages respectively because those modifications involve aGoesste-Pa aroa. acco. iblo only during a plant toW activities that require plant outages to install said modifications." Basis for suqaested change: As noted in References 2 and 3 given the substantial technical challenge imposed by the OMA resolution effort, and recognizing that the requisite engineering evaluations are in progress at this time, the presently conceptualized solutions may NL-12-109 Attachment 1 Page 2 of 2 change, in that the scope of the analysis and/or the nature and scope of plant physical modifications may require revision as the OMA resolutions are finalized.
Reference 3 documents a necessary revision to the initial response (Reference 2)to the NRC's Request for Additional Information (RAI) regarding Unit 2 OMAs.Entergy has very recently determined that there will be a necessary revision to the resolution methodology for Unit 3 OMA 10. The engineering evaluation has determined that the resolution of Unit 3 OMA 10 requires a physical plant modification that requires a plant outage to install. That modification will be completed during the upcoming Unit 3 outage scheduled for spring 2013.