ML15076A507: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
{{#Wiki_filter:Operating Test Quality Checklist ES-301 Form ES-301-3 F§_cility:.
{{#Wiki_filter:Operating Test Quality Checklist ES-301 Form ES-301-3 F§_cility:.
Point Beach U1/U2 Date of Examination:
Point Beach U1/U2 Date of Examination:
February 23, 2015 Operatin Test Number: 2015-301 1. General Criteria a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safet function distribution).  
February 23, 2015 Operatin Test Number: 2015-301 1. General Criteria a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safet function distribution).
: b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.  
: b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
: c. The operating test shall not duplicate items from tt1e applicants*
: c. The operating test shall not duplicate items from tt1e applicants*
audit test(s). (see Section D.1.a.) d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. 2. Walk-Through Criteria a. Each JPM includes the following, as applicable:  
audit test(s). (see Section D.1.a.) d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. 2. Walk-Through Criteria a. Each JPM includes the following, as applicable:
: b. initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
: b. initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
Initials a b* c# -
Initials a b* c# -
Line 28: Line 28:
---------------------
---------------------
-The associated simulator operating tests (scenario sets) have been reviewed in accordance with  
-The associated simulator operating tests (scenario sets) have been reviewed in accordance with  
,....._.. ,V 1 Form and a copy is attached _ _ .. "\IM Date a Author b, Facility Reviewer()  
,....._.. ,V 1 Form and a copy is attached _ _ .. "\IM Date a Author b, Facility Reviewer()
: c. NRC Chief Examiner(#)  
: c. NRC Chief Examiner(#)
: d. NRG Super-/isor NOTE
: d. NRG Super-/isor NOTE
* The facility signature is not applicab 1 8 for NRC-*devGloped tests. #}}
* The facility signature is not applicab 1 8 for NRC-*devGloped tests. #}}

Revision as of 00:16, 28 April 2019

2015 Point Beach Nuclear Plant Initial License Examination Form ES-301-3
ML15076A507
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A661 List:
References
50-266/15-301, 50-301/15-301
Download: ML15076A507 (1)


Text

Operating Test Quality Checklist ES-301 Form ES-301-3 F§_cility:.

Point Beach U1/U2 Date of Examination:

February 23, 2015 Operatin Test Number: 2015-301 1. General Criteria a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safet function distribution).

b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
c. The operating test shall not duplicate items from tt1e applicants*

audit test(s). (see Section D.1.a.) d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. 2. Walk-Through Criteria a. Each JPM includes the following, as applicable:

b. initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

Initials a b* c# -

B3E' *--3. Simulator Criteria -------------------*-------


-The associated simulator operating tests (scenario sets) have been reviewed in accordance with

,....._.. ,V 1 Form and a copy is attached _ _ .. "\IM Date a Author b, Facility Reviewer()

c. NRC Chief Examiner(#)
d. NRG Super-/isor NOTE
  • The facility signature is not applicab 1 8 for NRC-*devGloped tests. #