ML072340004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML072340004
| number = ML072340004
| issue date = 08/23/2007
| issue date = 08/23/2007
| title = James A. Fitzpatrick Nuclear Power Plant - Revised Pages of Facility Operating License DPR-59 B.5.b
| title = Revised Pages of Facility Operating License DPR-59 B.5.b
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1

Revision as of 19:32, 17 April 2019

Revised Pages of Facility Operating License DPR-59 B.5.b
ML072340004
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/23/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
Boska J P, NRR, 301-415-2901
Shared Package
ML072340002 List:
References
EA-02-026, EA-06-137, TAC MD4533
Download: ML072340004 (4)


Text

ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-59DOCKET NO. 50-333JAMES A. FITZPATRICK NUCLEAR POWER PLANTReplace the following page of the Facility Operating License. The revised pages are identifiedby the date of the letter issuing the page and contain marginal lines indicating the areas of change.REMOVEINSERTLicense DPR-59License DPR-59Page 7 Page 7--------Page 8 Q.ENF shall take all necessary steps to ensure that the decommissioning trust ismaintained in accordance with the application for the transfer of this license to ENF and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.R.Mitigation Strategy License ConditionDevelop and maintain strategies for addressing large fires and explosions andthat include the following key areas:(a) Fire fighting response strategy with the following elements:1. Pre-defined coordinated fire response strategy and guidance

2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel(b) Operations to mitigate fuel damage considering the following:1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures(c) Actions to minimize release to include consideration of:1. Water spray scrubbing
2. Dose to onsite respondersS.The licensee shall implement and maintain all Actions required by Attachment 2to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.Revised by letter dated August 23, 2007 3.This license is effective as of the date of issuance and shall expire at midnight onOctober 17, 2014.FOR THE NUCLEAR REGULATORY COMMISSION (ORIGINAL SIGNED BY: ROBERT W. REID)

Robert W. Reid, ChiefOperating Reactors Branch #4 Division of Operating ReactorsAttachments/Appendices:1. Appendix A - Technical Specifications

2. Appendix B - Deleted
3. Appendix C - Additional ConditionsDate of Issuance: June 3, 1977Revised by letter dated August 23, 2007