ML12297A354: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML12297A354 | | number = ML12297A354 | ||
| issue date = 10/22/2012 | | issue date = 10/22/2012 | ||
| title = | | title = Notification of Inspection and Request for Information, 05000250/2012005, 05000251/2012005 | ||
| author name = Bonser B R | | author name = Bonser B R | ||
| author affiliation = NRC/RGN-II/DRS/PSB1 | | author affiliation = NRC/RGN-II/DRS/PSB1 |
Revision as of 11:32, 4 April 2019
ML12297A354 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 10/22/2012 |
From: | Bonser B R NRC/RGN-II/DRS/PSB1 |
To: | Nazar M Florida Power & Light Co |
References | |
IR-12-005 | |
Download: ML12297A354 (7) | |
See also: IR 05000250/2012005
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
October 22, 2012
Mr. Mano Nazar
Executive Vice President and Chief Nuclear Officer
Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Nazar
On December 10-14, 2012, the NRC will perform a baseline Radiation Safety Inspection at your
Plant Turkey Point site (NRC Inspection
Procedures IP71124.01, IP71124.08 and 71151).
Experience has shown that this
inspection is resource intens
ive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. It is
important that all of these documents are up to date and complete, thereby minimizing the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The inspector has requested that the subject informational material be provided in CD format on or before November 29, 2012.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Stavroula Mihalake of your
organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658 or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its
enclosure will be available electr
onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control numbers
M. Nazar 2
3150-0044, 3150-0014, 3150-0011, and 3150-0008. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document display
s a currently valid Office of Management
and Budget control number.
Sincerely, /RA/ Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Dockets No. 50-250, 50-251
Enclosure: Public Occupational Radiation Safety Cornerstone Inspection Information
Request
cc w/encl: (See page 3)
ML12297A354 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB1 RII: DRS/PSB1 SIGNATURE RA/GBK RA/BB NAME G. KUZO B. BONSER DATE 10/22/2012 10/22/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO
M. Nazar 3 cc w/encl:
Alison Brown
Nuclear Licensing
Florida Power & Light Company Electronic Mail Distribution
Director
Licensing
Florida Power & Light Company Electronic Mail Distribution
Michael Kiley
Site Vice President
Turkey Point Nuclear Plant Florida Power and Light Company
Electronic Mail Distribution
Niel Batista Emergency Management Coordinator Department of Emergency Management
and Homeland Security
Electronic Mail Distribution
Paul Freeman Vice President Organizational Effectiveness
Florida Power & Light Company
Electronic Mail Distribution
Peter Wells Vice President
Outage Support CFAM
Florida Power & Light Company
Electronic Mail Distribution
Robert J. Tomonto Licensing Manager
Turkey Point Nuclear Plant
Florida Power & Light Company
Electronic Mail Distribution
Eric McCartney
Plant General Manager
Turkey Point Nuclear Plant Florida Power and Light Company
Electronic Mail Distribution
Mitch S. Ross
Vice President and General Counsel
Nuclear Florida Power & Light Company
Electronic Mail Distribution
Cynthia Becker (Acting) Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Senior Resident Inspector
Turkey Point Nuclear Generating Station
U.S. Nuclear Regulatory Commission
9762 SW 344th St.
Florida City, FL 33035
Attorney General Department of Legal Affairs
The Capitol PL-01
Tallahassee, FL 32399-1050
County Manager of Miami-Dade County
111 NW 1st Street, 29th Floor
Miami, FL 33128
George Gretsas
City Manager City of Homestead Electronic Mail Distribution
Enclosure PUBLIC AND OCCUPATIONAL RADIATION SAFETY CORNERSTONE INSPECTION INFORMATION REQUEST
SITE: Plant St. Lucie 05000250, 251/2012005
DOCUMENTS DUE TO REGION II BY
- November 29, 2012
INSPECTION DATES
- December 10-14, 2012
NRC INSPECTORS
- George B. Kuzo, george.kuzo@nrc.gov
(404) 997-4658
William Pursley, william.pursley@nrc.gov
(404) 997-4517
IDENTIFIED LICENSEE CONTACTS
- Radiation Protection: Cynthia Cashwell (RPM) (305-246-1631/Bill Hinson (-6012), Chemistry: Gabr
iel Mendoza (-6866 [O] / 786-525-6051 [C]), or Paul Skinner (-6134), Transportation: Andrew Snyder (- 6418); and Licensing/Compliance
- Stavroula Mihalakea (-6454);
Corporate Assistance: Joe Danek, 561-6944213 [O], 561-301-
2790 [C]
Inspection Procedures: IP 71124.01 Radiological Hazards
IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation IP 71151 PI Verification Performance Indicator Verification
[Occupational And Public Radiation Safety
Cornerstones]
Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing prior to the on-site inspection visit. The current version of these documents is
expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word or searchable "pdf" files on CDROM. Please provide two copies of
each electronic media device submitted.) Information in the "document lists" should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector can answer questions regarding questions on specific information needs with licensee staff and may request additional documents.
General Information Needed
1. List of primary contacts for each inspection area with phone numbers. 2. Procedure for issuing Nuclear Condition Reports and assessing issues for risk significance and follow-up actions. 3. Updated Final Safety Analysis Report Chapters 11, Effluents/Radwaste; and Chapter 12 Radiation Protection. 4. Process Control Program 5. Current Part 61 Analysis Results for Dry Active Waste (DAW). 6. Outage schedule of major activities (Gantt chart if available).
2 7. Audits and self-assessments performed since the last inspection that encompasses the areas of (1) radiation protection, (2) access controls, (3) solid radioactive waste processing
and (4) shipping and transportation of radioactive material.
71124.01: Radiological Hazard Assessment and Exposure Controls
1. List of unit 4 refueling cycle 27 outage RWPs.
2. Plant maps of all Locked HRAs and VHRAs. Include areas with the potential to become a LHRA during routine operations or outages. 3. Procedures related to HP controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.). 4. List of the 5 most exposure significant work tasks within radiation areas, high radiation areas (<1R/hr), LHRAs, or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose gradients (factor of five or more), including underwater diving activities. 5. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for electronic dosimetry alarm follow up, etc.). 6. List of Nationally Tracked Sources and any change-of-ownership transactions. 7. List of all non-fuel items stored in spent fuel pool. a. All self-assessments or audits covering HP controls since April 1, 2011, (if none, then provide the most recent) LIST of CRs related to HP controls since April 1, 2011.
This should be a list of corrective action documents containing a CR number and brief description, not full CRs. b. All CRs related to Nationally Tracked Sources since April 1, 2011.
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation [IP 71124.08]
1. Site and corporate procedures associated with radioactive waste processing and handling, storage, and transportation of radioactive material (RAM), including:
a. Storage and handling of RAM including non-RCA and satellite RCA locations. b. Waste stream mixing, sampling, concentration averaging, and use of scaling factors for hard to detect nuclides. c. Monitoring impact of long-term storage (e.g. build up of gases produced by waste decomposition, chemical reactions, container deformation, loss of container integrity, re-release of free-flowing water). d. Transferring of resin and/or sludge into shipping/disposal containers; dewatering and waste stabilization. e. Preparing packages and documentation for shipping radioactive materials. f. List of RAM storage areas, including satellite RCAs. g. Process Control Program.
2. List of changes to the radioactive waste processing systems since April 1, 2011, and copies of the associated 50.59 screening documentation. 3. Log of radioactive material shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since April 1, 2011. (The inspectors will select 3-5 packages to review in detail.) 4. List of condition reports (brief description only) and the results of any self assessments or audits generated since April 1, 2011, related to radioactive solid waste processing and packaging, handling, storage, and shipping of radioactive materials.
3 71151 - Performance Indicator (PI) Verification
(Last Inspected 6/6/11)
1. Procedure/Guidance for gathering and reporting PI data. 2. A list of all CRs related to effluent dose/ODCM issues since April 1, 2011. This should be a list of corrective action documents containing an identification number and brief description.
3. A list of all CRs related to TS HRA/VHRA issues since April 1, 2011. 4. Most recent gaseous and liquid effluent release permits.
5. Electronic dosimeter alarm logs since April 1, 2011.
6. Monthly/Quarterly Occupation and Public Radiation Safety PI reports since April 1, 2011.
Assistance Requested During On-Site Inspection
- An operator to accompany inspectors on walkdown your current radwaste processing system.
- An HP Specialist to interface with an inspector regarding any shipments or receipts of radioactive material during the onsite inspection.
- An HP specialist to accompany inspector on tour of containment and auxiliary building wallkdowns.
Inspector Contact Information:
George Kuzo
(404) 997-4658 mail to: george.kuzo@nrc.gov
Mailing Address
US Nuclear Regulatory Commission, Region II ATTN: Mr. George Kuzo
245 Peachtree Center Ave., NE
Suite 1200
Atlanta, GA 30303