05000528/FIN-2018001-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| Inspection procedure = IP 71111.12
| Inspection procedure = IP 71111.12
| Inspector = C Peabody, D Reinert, D You, L Carson, S Hedger, G Miller
| Inspector = C Peabody, D Reinert, D You, L Carson, S Hedger, G Miller
| CCA = H4a
| CCA =  
| INPO aspect = QA.4
| INPO aspect = QA.4
| description = The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.  Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
| description = The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.  Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
}}
}}

Latest revision as of 17:34, 10 September 2018

01
Site: Palo Verde Arizona Public Service icon.png
Report IR 05000528/2018001 Section 1R12
Date counted Mar 31, 2018 (2018Q1)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: Self-revealing
Inspection Procedure: IP 71111.12
Inspectors (proximate) C Peabody
D Reinert
D You
L Carson
S Hedger
G Miller
Violation of: 10 CFR 50 Appendix B

10 CFR 50 Appendix B Criterion V
INPO aspect QA.4
'