| {{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000SEP 2 9 200310 CFR 55.40U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555Gentlemen:In the Matter of ) Docket No. 50-390Tennessee Valley Authority )WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -NRC REGULATORY ISSUESUMMARY (RIS) 2003-14 -PREPARATION AND SCHEDULING OF OPERATORLICENSING EXAMINATIONSRIS 2003-14 was released by NRC on August 27, 2003, and requested information regardingWBN's projected operator licensing examination schedules and the estimated number ofapplicants. The information requested by NRC was defined on Form 536. The enclosure tothis letter addresses NRC's request and provides an estimate of the examination requirementsfor WBN.There are no regulatory commitments in this submittal and should there be questionsregarding this letter, please telephone me at (423) 365-1824.Sincerely,P. L. PaceManager, Site Licensingand Industry AffairsEnclosurecc: See page2 2C | | {{#Wiki_filter:Tennessee |
| aU.S. Nuclear Regulatory CommissionPage 2SEP Z 9 2003cc (Enclosure):NRC Resident InspectorWatts Bar Nuclear Plant1260 Nuclear Plant RoadSpring City, Tennessee 37381Ms. M. H. Chernoff, Project ManagerU.S. Nuclear Regulatory CommissionMS 08G9One White Flint North11555 Rockville PikeRockville, Maryland 20852-2738U.S. Nuclear Regulatory Commission, Region IIATTN: Mr. Michael E. ErnstesChief, Operator Licensing and Human Performance BranchSam Nunn Atlanta Federal Center61 Forsyth St., Suite 23T85Atlanta, Georgia 30303
| | Valley Authority, Post Office Box 2000, Spring City, Tennessee |
| EnclosureOperator Licensing Examination Data(Data as defined on NRC Form 536)FACITY NRC REGIONWATTS BAR NUCLEAR PLANT IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY04 CY05 CY06 CY07ESTIMATED NUMBER OFLICENSEE PREPARED 1 0 0 0EXAMINATIONSESTIMATED NUMBER OFNRC PREPARED 0 0 1 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY04 CY05 CY06 CY07NUMBER OF REACTOR 4 0 8 0OPERATORSNUMBER OF SENIOR REACTOR 3 0 5 0OPERATORS -INSTANTNUMBER OF SENIOR REACTOR 2 0 3 0OPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATES 7t26 -7/30 6/11 -6/15PRIMARY DATEALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED CY04CY05NUMBER Jne Sepember December Mac June September DecemberESTIMATED o o o O 0 13 0 0NUMBER OFCANDIDATES
| | 37381-2000 |
| | | SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory |
| | Commission |
| | ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: |
| | In the Matter of ) Docket No. 50-390 Tennessee |
| | Valley Authority |
| | )WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -NRC REGULATORY |
| | ISSUE SUMMARY (RIS) 2003-14 -PREPARATION |
| | AND SCHEDULING |
| | OF OPERATOR LICENSING |
| | EXAMINATIONS |
| | RIS 2003-14 was released by NRC on August 27, 2003, and requested |
| | information |
| | regarding WBN's projected |
| | operator licensing |
| | examination |
| | schedules |
| | and the estimated |
| | number of applicants. |
| | The information |
| | requested |
| | by NRC was defined on Form 536. The enclosure |
| | to this letter addresses |
| | NRC's request and provides an estimate of the examination |
| | requirements |
| | for WBN.There are no regulatory |
| | commitments |
| | in this submittal |
| | and should there be questions regarding |
| | this letter, please telephone |
| | me at (423) 365-1824.Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page2 2C |
| | a U.S. Nuclear Regulatory |
| | Commission |
| | Page 2 SEP Z 9 2003 cc (Enclosure): |
| | NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee |
| | 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory |
| | Commission |
| | MS 08G9 One White Flint North 11555 Rockville |
| | Pike Rockville, Maryland 20852-2738 |
| | U.S. Nuclear Regulatory |
| | Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing |
| | and Human Performance |
| | Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303 |
| | Enclosure Operator Licensing |
| | Examination |
| | Data (Data as defined on NRC Form 536)FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION |
| | PREPARATION |
| | SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED |
| | NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS |
| | ESTIMATED |
| | NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS |
| | B. INITIAL OPERATOR LICENSE EXAMINATIONS |
| | PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS |
| | -INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS |
| | -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS |
| | -LIMITED PROPOSED DATES 7t26 -7/30 6/11 -6/15 PRIMARY DATE ALTERNATE |
| | DATE C. PROPOSED GENERIC FUNDAMENTALS |
| | EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September |
| | December ESTIMATED |
| | o o o O 0 13 0 0 NUMBER OF CANDIDATES |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05
[Table view] |
See also: RIS 2003-14
Text
Tennessee
Valley Authority, Post Office Box 2000, Spring City, Tennessee
37381-2000
SEP 2 9 2003 10 CFR 55.40 U.S. Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket No. 50-390 Tennessee
Valley Authority
)WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -NRC REGULATORY
ISSUE SUMMARY (RIS) 2003-14 -PREPARATION
AND SCHEDULING
OF OPERATOR LICENSING
EXAMINATIONS
RIS 2003-14 was released by NRC on August 27, 2003, and requested
information
regarding WBN's projected
operator licensing
examination
schedules
and the estimated
number of applicants.
The information
requested
by NRC was defined on Form 536. The enclosure
to this letter addresses
NRC's request and provides an estimate of the examination
requirements
for WBN.There are no regulatory
commitments
in this submittal
and should there be questions regarding
this letter, please telephone
me at (423) 365-1824.Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page2 2C
a U.S. Nuclear Regulatory
Commission
Page 2 SEP Z 9 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee
37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory
Commission
MS 08G9 One White Flint North 11555 Rockville
Pike Rockville, Maryland 20852-2738
U.S. Nuclear Regulatory
Commission, Region II ATTN: Mr. Michael E. Ernstes Chief, Operator Licensing
and Human Performance
Branch Sam Nunn Atlanta Federal Center 61 Forsyth St., Suite 23T85 Atlanta, Georgia 30303
Enclosure Operator Licensing
Examination
Data (Data as defined on NRC Form 536)FACITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY04 CY05 CY06 CY07 ESTIMATED
NUMBER OF LICENSEE PREPARED 1 0 0 0 EXAMINATIONS
ESTIMATED
NUMBER OF NRC PREPARED 0 0 1 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY04 CY05 CY06 CY07 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 3 0 5 0 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-LIMITED PROPOSED DATES 7t26 -7/30 6/11 -6/15 PRIMARY DATE ALTERNATE
DATE C. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE PROPOSED CY04CY05 NUMBER Jne Sepember December Mac June September
December ESTIMATED
o o o O 0 13 0 0 NUMBER OF CANDIDATES