ENS 41945: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/24/2005 23:37 EDT | | event date = 08/24/2005 23:37 EDT | ||
| last update date = 08/25/2005 | | last update date = 08/25/2005 | ||
| title = Emergency Diesel Generator Automatic Start Due | | title = Emergency Diesel Generator Automatic Start Due to Bus Supply Breaker Trip | ||
| event text = 4160 volt Bus 1D normal supply Breaker 1D tripped open. The associated No. 2 EDG automatically started and is supplying the 1D 4160 volt Bus. Plant equipment responded as expected. Troubleshooting is in progress to determine the cause of the breaker trip. | | event text = 4160 volt Bus 1D normal supply Breaker 1D tripped open. The associated No. 2 EDG automatically started and is supplying the 1D 4160 volt Bus. Plant equipment responded as expected. Troubleshooting is in progress to determine the cause of the breaker trip. | ||
The licensee notified the NRC Resident Inspector. | The licensee notified the NRC Resident Inspector. |
Latest revision as of 22:20, 1 March 2018
Where | |
---|---|
Oyster Creek New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.23 h-0.0513 days <br />-0.00732 weeks <br />-0.00168 months <br />) | |
Opened: | Russel Greiner 02:23 Aug 25, 2005 |
NRC Officer: | Mike Ripley |
Last Updated: | Aug 25, 2005 |
41945 - NRC Website
| |