| title = Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-549 Through C-620
| title = Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-549 Through C-620
| author name = Stoeva N
| author name = Stoeva N
| author affiliation = Stevenson & Associates
| author affiliation = Stevenson & Associates
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers EauiDment DescriDtion:
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYII N U Seismic Walkdown Checklist (SWC)
WEST CONTAINMENT SPRAY HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers EauiDment DescriDtion:
WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 4 Manufacturer/Model:
AB2, 609.00 ft, 4 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorane 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorane
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Yes Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
No Yes Yes Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-549 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Z] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-549


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Z] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Equipment


WEST CONTAINMENT SPRAY HEAT EXCHANGER 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
WEST CONTAINMENT SPRAY HEAT EXCHANGER
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 7.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are soft targets free from impact by nearby equipment or structures?
Comments Evaluated by: George G Thomas Date: 10/18/12 0 ' Neda Stoeva 10/18/12 Photos C-550 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers T C-551 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Pniiinmgnfr fncnrinfinn" \AII.-T ClMTAIKIMMFMT SPRAY IFAT FYC.HANI\(PFR I rtI C-552 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers ipment
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 0
Neda Stoeva 10/18/12 Photos C-550
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers T
C-551
 
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Pniiinmgnfr fncnrinfinn"  
\\AII.-T ClMTAIKIMMFMT SPRAY IFAT FYC.HANI\\(PFR I
rtI *UO C-552
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers ipment


== Description:==
== Description:==
WEST CONTAINMENT SPRAY HEAT EX C-553


WEST CONTAINMENT SPRAY HEAT EX C-553 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers ipment
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers ipment


== Description:==
== Description:==
WEST CONTAINMENT SPRAY HEAT EXC C-554
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
-nm-nf r)errinflnn" 2-HE-i 8W (21) Tanks and Heat Exchangers
%A/F=qT rnKITAII NT C-555


WEST CONTAINMENT SPRAY HEAT EXC C-554 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class:-nm-nf r)errinflnn" 2-HE-i 8W (21) Tanks and Heat Exchangers
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
%A/F=qT rnKITAII NT C-555 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers C-556 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [li N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
Equipment ID No.:
2-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers C-556


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [li N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-ACRA-2 Equipment Class:
(10) Air Handlers Equipment


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 650.00 ft, 129 Manufacturer/Model:
AB2, 650.00 ft, 129 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
DWG 12-3366 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Yes Interaction Effects C-557 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
DWG 12-3366 REV5
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-557


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYI N U
Description:==
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-ACRA-2 Equipment Class:
(10) Air Handlers Equipment


== Description:==
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING
: 7. Are soft targets free from impact by nearby equipment or structures?
: 7.
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
Yes
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 8.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-558 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers inmanftnnet-rinfirnn CCr)KT~rC~
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Prfld C-559 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-558


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-ACRA-2 Equipment Class:
(10) Air Handlers inmanftnnet-rinfirnn CCr)KT~rC~
Prfld C-559


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING P9100144 P9100145 C-560 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-ACRA-2 Equipment Class:
(10) Air Handlers Equipment


==
== Description:==
Description:==
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING P9100144 P9100145 C-560


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-AES-2 Equipment Class:
(10) Air Handlers Equipment
 
== Description:==
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 633.00 ft, 8 Manufacturer/Model:
AB2, 633.00 ft, 8 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?2 front middle bolts on filter do not have full thread engagement  
: 1.
-OK per SD-991215-024 pg. 12 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
2 front middle bolts on filter do not have full thread engagement - OK per SD-991215-024 pg. 12
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-561 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment  
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-561
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-AES-2 Equipment Class:
(10) Air Handlers Equipment
 
== Description:==
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall behind component filter - DWG 12-4029, Wall W-7
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-562
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-AES-2 Equipment Class:
(10) Air Handlers I'A-,Mr Al IYII IADV MI III rlIKlf-X/lMTII ATI
:M PK IMI:IPP l:I QAI:[TV C-563
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-AES-2 Equipment Class:
(10) Air Handlers JILDING VENTII C-564


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Yi N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-AES-2 Equipment Class:
(10) Air Handlers lrniiinm~nt flac'rihrnfn Al IYII IAPV P* III fl-IMV* \\/IPMTII ATInKM QMAIMlPl:lr
:AITV C-565


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Y N U Seismic Walkdown Checklist (SWC)
Block wall behind component filter -DWG 12-4029, Wall W-7 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Equipment ID No.:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
2-HV-AES-2 Equipment Class:
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-562 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers I'A-,Mr -Al IYII IADV MI III rlIKlf- X/lMTII ATI :M PK IMI:IPP l:I QAI:[TV C-563 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers JILDING VENTII C-564 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Yi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers lrniiinm~nt flac'rihrnfn Al IYII IAPV III \/IPMTII ATInKM QMAIMlPl:lr
(10) Air Handlers AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-566
:AITV C-565 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-566 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: I-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
I-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CON2, 625.00 ft, 75 Manufacturer/Model:
CON2, 625.00 ft, 75 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
SQUG 2-HV-CEQ-1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Missing bolt on backside as identified in SEWS -SQUG 2-HV-CEQ-1 REVO 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted to floor grate 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Not Applicable Yes Yes Interaction Effects C-567 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers EouiDment DescriDtion:
SQUG 2-HV-CEQ-1 REVO
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 7. Are soft targets free from impact by nearby equipment or structures?
: 2.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Is the anchorage free of bent, broken, missing or loose hardware?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Missing bolt on backside as identified in SEWS - SQUG 2-HV-CEQ-1 REVO
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 3.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-568 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers IM C-569 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment  
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Mounted to floor grate
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes Interaction Effects C-567
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YJ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers EouiDment DescriDtion:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-568
 
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers IM C-569
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment
 
== Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130264 P9130265 C-570


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F]
Description:==
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers
-nr nr
,it;rf-Cr")"ITAI KIAIKIT i m
HYDROGEN SKIMIN C-571


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130264 P9130265 C-570 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers-nr nr ,it;rf- Cr")"ITAI KIAIKIT i m HYDROGEN SKIMIN C-571 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [T ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [T ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment


==
== Description:==
Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130275 P9130276 C-572


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130275 P9130276 C-572 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlersýn+n, rlrnti~n ('(MdTAI Il IPIT m HYDROGEN SKIMI C-573 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: L N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers
ýn+n, rlrnti~n
('(MdTAI Il IPIT m
HYDROGEN SKIMI C-573


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: L N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130285 P9130286 C-574 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: -Y--I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment
== Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130285 P9130286 C-574


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: -Y--I N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-CEQ-2 Equipment Class:
(10) Air Handlers Equipment


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CON2, 625.00 ft, 74 Manufacturer/Model:
CON2, 625.00 ft, 74 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Missing bolt on support directly below 2-VMO-101  
: 1.
-OK per SEWS report -SQUG 2-HV-CEQ-2 REVO 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Missing bolt on support directly below 2-VMO-101 - OK per SEWS report -
SQUG 2-HV-CEQ-2 REVO
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-575 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Eauioment  
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-575
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-CEQ-2 Equipment Class:
(10) Air Handlers Eauioment


==
== Description:==
Description:==
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-576


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
N U Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Equipment ID No.:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
2-HV-CEQ-2 Equipment Class:
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-576 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers C-577 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment
(10) Air Handlers C-577


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-CEQ-2 Equipment Class:
(10) Air Handlers Equipment


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 P9130295 P9130296 C-578 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Eauioment Descriotion:
== Description:==
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 P9130295 P9130296 C-578
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-DGX-2 Equipment Class:
(9) Fans Eauioment Descriotion:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
AB2, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Limited visibility of anchorage, visible portions OK 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Limited visibility of anchorage, visible portions OK
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes VERY LIMITED VISIBILITY
Yes VERY LIMITED VISIBILITY
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes VERY LIMITED VISIBILITY
: 4.
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes VERY LIMITED VISIBILITY
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-579 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Eauioment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-579


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-
Description:==
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-DGX-2 Equipment Class:
(9) Fans Eauioment


== Description:==
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION
: 7. Are soft targets free from impact by nearby equipment or structures?
: 7.
Yes Rod hung light can swing into fan -OK, because it will not affect function of equipment 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Yes Rod hung light can swing into fan - OK, because it will not affect function of equipment
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 8.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-580 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans E ui ment Descri tion: AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130430 P9130431 P9130432 P9130433 C-581 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-580
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-DGX-2 Equipment Class:
(9) Fans E ui ment Descri tion:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130430 P9130431 P9130432 P9130433 C-581


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YII N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-DGX-2 Equipment Class:
(9) Fans Equipment


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 P9130435 C-582 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FVj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-SGRS-8 Equipment Class: (9) Fans Equipment
== Description:==
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 P9130435 C-582


==
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FVj N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-HV-SGRS-8 Equipment Class:
(9) Fans Equipment


4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 204 Manufacturer/Model:
AB2, 609.00 ft, 204 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
SQUG 2-HV-SGRS-8 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Unistrut mounted 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Not Applicable Yes Yes Interaction Effects C-583 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rIY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-SGRS-8 Equipment Class: (9) Fans EauiDment DescriDtion:
SQUG 2-HV-SGRS-8 REVO
4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A 7. Are soft targets free from impact by nearby equipment or structures?
: 2.
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Is the anchorage free of bent, broken, missing or loose hardware?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes Yes
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 3.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-584 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-SGRS-8 Equipment Class: (9) Fans r-I --llm f I~ lf~. m 0 VOLT SWITCH C-585 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53 Equipment Class: (18) Instruments on Racks Equipment
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Unistrut mounted
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes Interaction Effects C-583
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rIY-N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-SGRS-8 Equipment Class:
(9) Fans EauiDment DescriDtion:
4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-584
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-HV-SGRS-8 Equipment Class:
(9) Fans r-I llm f I~
lf~.
Ak,*/
P*'nnhA 90*
m 0 VOLT SWITCH C-585


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [FY] N U
Description:==
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IFI-53 Equipment Class:
(18) Instruments on Racks Equipment


BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CON2, 598.00 ft, 56 Manufacturer/Model:
CON2, 598.00 ft, 56 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Yes Interaction Effects C-586 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53 Equipment Class: (18) Instruments on Racks EauiDment DescriDtion:
Yes
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW 7. Are soft targets free from impact by nearby equipment or structures?
: 2.
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Is the anchorage free of bent, broken, missing or loose hardware?
Valve directly above but transmitter is water tight so even if fail open there is no concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Yes
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 3.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-587 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53 Equipment Class: (18) Instruments on Racks MTION TO C-588 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53 Equipment Class: (18) Instruments on Racks Equipment
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-586


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y-1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IFI-53 Equipment Class:
(18) Instruments on Racks EauiDment DescriDtion:
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Valve directly above but transmitter is water tight so even if fail open there is no concern.
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-587
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IFI-53 Equipment Class:
(18) Instruments on Racks MTION TO C-588
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IFI-53 Equipment Class:
(18) Instruments on Racks Equipment
 
== Description:==
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW P9120170 P9120171 C-589


BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW P9120170 P9120171 C-589 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IFI-53 Equipment Class: (18) Instruments on Racks Eauioment DescriDtion:
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW C-590 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment
Equipment ID No.:
2-IFI-53 Equipment Class:
(18) Instruments on Racks Eauioment DescriDtion:
BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW C-590


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-222 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Eauipment


WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 573.00 ft, 52 Manufacturer/Model:
AB2, 573.00 ft, 52 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-591 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-591


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-222 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO
Block wall near by -OK per DWG 12-4025, Wall W-22 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 7.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are soft targets free from impact by nearby equipment or structures?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-592 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-222 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves T C-593 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall near by - OK per DWG 12-4025, Wall W-22
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-592


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-222 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves T
C-593


REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-225 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment
 
== Description:==
REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 573.00 ft, 52 Manufacturer/Model:
AB2, 573.00 ft, 52 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-594 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-594


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-225 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


== Description:==
REFUELING WATER STORAGE TANK TO WEST CONTAINMENT
REFUELING WATER STORAGE TANK TO WEST CONTAINMENT
: 7. Are soft targets free from impact by nearby equipment or structures?
: 7.
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
Block wall near by -OK per DWG 12-4025, Wall W-22 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Yes
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
: 8.
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-595 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-225 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall near by - OK per DWG 12-4025, Wall W-22
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-595
 
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-225 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves ipment


== Description:==
== Description:==
REFUELING WATER STORAGE TANK TO WEST C-596


REFUELING WATER STORAGE TANK TO WEST C-596 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-320 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


==
== Description:==
Description:==
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project:
 
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 573.00 ft, 55 Manufacturer/Model:
AB2, 573.00 ft, 55 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-597 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FTI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment Descriotion:
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION 7. Are soft targets free from impact by nearby equipment or structures?
Yes Interaction Effects C-597
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
Block wall -look at AR# 00863253-01
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FTI N U Seismic Walkdown Checklist (SWC)
-OK per DWG 12-4025, Wall W-24 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Equipment ID No.:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
2-IMO-320 Equipment Class:
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-598 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 1r--iinm-nf , r'rrntifn.  
(8) Motor-Operated and Solenoid-Operated Valves EauiDment Descriotion:
/AI::QT PID:IfI"I IA I-II AT DI:AfnX/AI Dl I, AD DDPP'Z AI I1 IC"TIf'nKI
WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION
-, C-599 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-320 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves pment
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall - look at AR# 00863253 OK per DWG 12-4025, Wall W-24
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-598
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-320 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves 1r--iinm-nf r'rrntifn.  
/AI::QT PID:IfI"I IA I-II AT DI:AfnX/AI Dl I, AD DDPP'Z AI I1 IC"TIf'nKI C-599
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-320 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves pment


== Description:==
== Description:==
WEST RESIDUAL HEAT REMOVAL PUMP PP-351 C-600


WEST RESIDUAL HEAT REMOVAL PUMP PP-351 C-600 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:  
] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-331 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


==
== Description:==
Description:==
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project:
 
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 6 Manufacturer/Model:
AB2, 609.00 ft, 6 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-601 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-601


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-331 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE
: 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 7.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are soft targets free from impact by nearby equipment or structures?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-602 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: ELI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-331 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-603 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYi] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment
Yes Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-602


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: ELI N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-331 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves C-603


WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYi] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-350 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment
 
== Description:==
WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 6 Manufacturer/Model:
AB2, 609.00 ft, 6 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-604 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-604


==
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZ] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-350 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 7.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are soft targets free from impact by nearby equipment or structures?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-605 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Pnidnmonft fcýrinfinn PWI-PWI=AT F=Y-WAMfIF=D1TI F:T Tfl IM ltfTIt'M C-606 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-350 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-605
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-350 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Pnidnmonft fcýrinfinn AI/I=*ZT PWI-PWI=AT F=Y-WAMfIF=D1TI F:T Tfl *AI*:FTV IM ltfTIt'M C-606
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-350 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves ipment


== Description:==
== Description:==
WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION C-607
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-52 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION C-607 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
== Description:==
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CON2, 598.00 ft, 59 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Interaction Effects C-608


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: IY-] N U
Description:==
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-52 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
3.Ai George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-609


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: l N U Seismic Walkdown Checklist (SWC)
CON2, 598.00 ft, 59 Manufacturer/Model:
Equipment ID No.:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
2-IMO-52 Equipment Class:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
(8) Motor-Operated and Solenoid-Operated Valves MTION TO I
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
i,
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
i1 I
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
C-610
Not Applicable Yes Interaction Effects C-608 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: IY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: 3.Ai George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-609 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves MTION TO I i , i1 .I C-610 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Eli N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Eli N U
Description:==
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-52 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF P9120114 P9120115 C-611 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-52 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
== Description:==
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF P9120114 P9120115 C-611


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-52 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Equipment


BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF C-612 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Elil N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment
== Description:==
BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF C-612


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Elil N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
2-IMO-911 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves EauiDment


REFUELING WATER STORAGE TANK TO CVCS CHARGING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
REFUELING WATER STORAGE TANK TO CVCS CHARGING Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 587.00 ft, 40 Manufacturer/Model:
AB2, 587.00 ft, 40 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 1.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-613 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EL] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EquipmentDescription:
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
REFUELING WATER STORAGE TANK TO CVCS CHARGING 7. Are soft targets free from impact by nearby equipment or structures?
Yes Interaction Effects C-613
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EL] N U Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Equipment ID No.:
Comments Evaluated by: -"- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-614 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:
2-IMO-911 Equipment Class:
REFUELING WATER STORAGE TANK TO CVCS CHARGING C-615 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-IMO-911 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ipment
(8) Motor-Operated and Solenoid-Operated Valves EquipmentDescription:
REFUELING WATER STORAGE TANK TO CVCS CHARGING
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-614
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-911 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:
REFUELING WATER STORAGE TANK TO CVCS CHARGING C-615
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-IMO-911 Equipment Class:
(8) Motor-Operated and Solenoid-Operated Valves ipment


== Description:==
== Description:==
REFUELING WATER STORAGE TANK TO CVCS C-616


REFUELING WATER STORAGE TANK TO CVCS C-616 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N 1IE Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCAB Equipment Class: (14) Distribution Panels Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N 1IE Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-MCAB Equipment Class:
(14) Distribution Panels Equipment


==
== Description:==
Description:==
250VDC DISTRIBUTION PANEL MCAB Project:
DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
CANNOT OPEN - CAN'T SEE ANCHORAGE
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
No Unknown
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Cannot open - cannot see anchorage Unknown Unknown Unknown Unknown Interaction Effects C-617


250VDC DISTRIBUTION PANEL MCAB Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
AB2, 609.00 ft, 200 Manufacturer/Model:
Y N Ull Seismic Walkdown Checklist (SWC)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Equipment ID No.:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
2-MCAB Equipment Class:
CANNOT OPEN -CAN'T SEE ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?No Unknown 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
(14) Distribution Panels EQuipment
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
== Description:==
Cannot open -cannot see anchorage Unknown Unknown Unknown Unknown Interaction Effects C-617 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N Ull Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCAB Equipment Class: (14) Distribution Panels EQuipment  
250VDC DISTRIBUTION PANEL MCAB
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
CANNOT OPEN Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-618


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y N L-0 Seismic Walkdown Checklist (SWC)
Equipment ID No.:
2-MCAB Equipment Class:
(14) Distribution Panels C-619


250VDC DISTRIBUTION PANEL MCAB 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Y N E-]
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Seismic Walkdown Checklist (SWC)
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Equipment ID No.:
CANNOT OPEN Comments Evaluated by: ',., George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-618 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N L-0 Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCAB Equipment Class: (14) Distribution Panels C-619 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N E-]Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-MCAB Equipment Class: (14) Distribution Panels Eauioment Descriotion:
2-MCAB Equipment Class:
(14) Distribution Panels Eauioment Descriotion:
25OVDC DISTRIBUTION PANEL MCAB C-620}}
25OVDC DISTRIBUTION PANEL MCAB C-620}}

Latest revision as of 19:33, 11 January 2025

Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-549 Through C-620
ML12362A059
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/05/2012
From: Stoeva N
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation, American Electric Power, Indiana Michigan Power Co
References
AEP-NRC-2012-87 SD-121023-001, Rev 0
Download: ML12362A059 (72)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers EauiDment DescriDtion:

WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 4 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorane

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

No Yes Yes Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-549

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Z] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

WEST CONTAINMENT SPRAY HEAT EXCHANGER

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 0

Neda Stoeva 10/18/12 Photos C-550

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers T

C-551

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers Pniiinmgnfr fncnrinfinn"

\\AII.-T ClMTAIKIMMFMT SPRAY IFAT FYC.HANI\\(PFR I

rtI *UO C-552

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers ipment

Description:

WEST CONTAINMENT SPRAY HEAT EX C-553

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers ipment

Description:

WEST CONTAINMENT SPRAY HEAT EXC C-554

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

-nm-nf r)errinflnn" 2-HE-i 8W (21) Tanks and Heat Exchangers

%A/F=qT rnKITAII NT C-555

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HE-18W Equipment Class:

(21) Tanks and Heat Exchangers C-556

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [li N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

DWG 12-3366 REV5

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-557

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-558

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers inmanftnnet-rinfirnn CCr)KT~rC~

Prfld C-559

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-ACRA-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING P9100144 P9100145 C-560

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 8 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

2 front middle bolts on filter do not have full thread engagement - OK per SD-991215-024 pg. 12

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-561

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers Equipment

Description:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind component filter - DWG 12-4029, Wall W-7

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-562

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers I'A-,Mr Al IYII IADV MI III rlIKlf-X/lMTII ATI

M PK IMI:IPP l:I QAI:[TV C-563

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers JILDING VENTII C-564

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Yi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers lrniiinm~nt flac'rihrnfn Al IYII IAPV P* III fl-IMV* \\/IPMTII ATInKM QMAIMlPl:lr

AITV C-565

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-AES-2 Equipment Class:

(10) Air Handlers AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-566

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

I-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 75 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

SQUG 2-HV-CEQ-1 REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Missing bolt on backside as identified in SEWS - SQUG 2-HV-CEQ-1 REVO

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Mounted to floor grate

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes Interaction Effects C-567

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YJ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers EouiDment DescriDtion:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-568

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers IM C-569

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130264 P9130265 C-570

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers

-nr nr

,it;rf-Cr")"ITAI KIAIKIT i m

HYDROGEN SKIMIN C-571

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [T ] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130275 P9130276 C-572

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

  • N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers

ýn+n, rlrnti~n

('(MdTAI Il IPIT m

HYDROGEN SKIMI C-573

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: L N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-1 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130285 P9130286 C-574

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: -Y--I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 74 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Missing bolt on support directly below 2-VMO-101 - OK per SEWS report -

SQUG 2-HV-CEQ-2 REVO

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-575

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Eauioment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-576

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers C-577

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-CEQ-2 Equipment Class:

(10) Air Handlers Equipment

Description:

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 P9130295 P9130296 C-578

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Eauioment Descriotion:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Limited visibility of anchorage, visible portions OK

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes VERY LIMITED VISIBILITY

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes VERY LIMITED VISIBILITY

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-579

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Eauioment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Rod hung light can swing into fan - OK, because it will not affect function of equipment

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-580

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans E ui ment Descri tion:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130430 P9130431 P9130432 P9130433 C-581

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-DGX-2 Equipment Class:

(9) Fans Equipment

Description:

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 P9130435 C-582

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FVj N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans Equipment

Description:

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 204 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

SQUG 2-HV-SGRS-8 REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Unistrut mounted

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes Interaction Effects C-583

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rIY-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans EauiDment DescriDtion:

4KV ROOM 600 VOLT SWITCHGEAR TRANSFORMERS TR21A

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-584

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-HV-SGRS-8 Equipment Class:

(9) Fans r-I llm f I~

lf~.

Ak,*/

P*'nnhA 90*

m 0 VOLT SWITCH C-585

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 598.00 ft, 56 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-586

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks EauiDment DescriDtion:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Valve directly above but transmitter is water tight so even if fail open there is no concern.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-587

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks MTION TO C-588

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW P9120170 P9120171 C-589

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IFI-53 Equipment Class:

(18) Instruments on Racks Eauioment DescriDtion:

BORON INJECTION TO REACTOR COOLANT LOOP #3 FLOW C-590

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eauipment

Description:

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-591

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST CONTAINMENT SPRAY PUMP PP-9W DISCHARGE TO

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall near by - OK per DWG 12-4025, Wall W-22

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-592

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-222 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves T

C-593

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-225 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 52 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-594

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-225 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

REFUELING WATER STORAGE TANK TO WEST CONTAINMENT

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall near by - OK per DWG 12-4025, Wall W-22

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-595

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-225 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves ipment

Description:

REFUELING WATER STORAGE TANK TO WEST C-596

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 573.00 ft, 55 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-597

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FTI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EauiDment Descriotion:

WEST RESIDUAL HEAT REMOVAL PUMP PP-35W SUCTION

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall - look at AR# 00863253 OK per DWG 12-4025, Wall W-24

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-598

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves 1r--iinm-nf r'rrntifn.

/AI::QT PID:IfI"I IA I-II AT DI:AfnX/AI Dl I, AD DDPP'Z AI I1 IC"TIf'nKI C-599

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-320 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves pment

Description:

WEST RESIDUAL HEAT REMOVAL PUMP PP-351 C-600

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-601

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR TO UPPER CONTAINMENT SPRAY SHUTOFF VALVE

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-602

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: ELI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-331 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves C-603

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYi] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EauiDment

Description:

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-604

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZ] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-605

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Pnidnmonft fcýrinfinn AI/I=*ZT PWI-PWI=AT F=Y-WAMfIF=D1TI F:T Tfl *AI*:FTV IM ltfTIt'M C-606

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-350 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves ipment

Description:

WEST RHR HEAT EXCHANGER OUTLET TO SAFETY INJECTION C-607

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 598.00 ft, 59 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Interaction Effects C-608

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: IY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

3.Ai George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-609

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: l N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves MTION TO I

i,

i1 I

C-610

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Eli N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF P9120114 P9120115 C-611

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-52 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Equipment

Description:

BORON INJECTION TO REACTOR COOLANT LOOP #2 SHUTOFF C-612

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Elil N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EauiDment

Description:

REFUELING WATER STORAGE TANK TO CVCS CHARGING Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 40 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-613

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EL] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves EquipmentDescription:

REFUELING WATER STORAGE TANK TO CVCS CHARGING

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-614

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:

REFUELING WATER STORAGE TANK TO CVCS CHARGING C-615

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-IMO-911 Equipment Class:

(8) Motor-Operated and Solenoid-Operated Valves ipment

Description:

REFUELING WATER STORAGE TANK TO CVCS C-616

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N 1IE Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels Equipment

Description:

250VDC DISTRIBUTION PANEL MCAB Project:

DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 200 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

CANNOT OPEN - CAN'T SEE ANCHORAGE

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Unknown

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Cannot open - cannot see anchorage Unknown Unknown Unknown Unknown Interaction Effects C-617

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N Ull Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels EQuipment

Description:

250VDC DISTRIBUTION PANEL MCAB

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

CANNOT OPEN Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-618

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N L-0 Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels C-619

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N E-]

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-MCAB Equipment Class:

(14) Distribution Panels Eauioment Descriotion:

25OVDC DISTRIBUTION PANEL MCAB C-620