Line 16: Line 16:
| event date = 07/26/2007 09:02 CDT
| event date = 07/26/2007 09:02 CDT
| last update date = 07/26/2007
| last update date = 07/26/2007
| title = Unanalyzed Condition - Flood Doors Closed Causing A Potential Loss Of Both Vital Switchgear
| title = Unanalyzed Condition - Flood Doors Closed Causing a Potential Loss of Both Vital Switchgear
| event text = At 09:02 on 07/28/07, an outplant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link.  With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water.  This represented an unanalyzed condition where both divisions of essential switchgear could be impacted.  As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered.  At 09:55 on 07/26/07, the closed fire door was restored to the open state. Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited.  No system actuations occurred as a part of this event.
| event text = At 09:02 on 07/28/07, an outplant operator identified that DOOR-18, which is a normally open fire door, had closed due to a failed fusible link.  With this door closed, the pathway for a potential flood due to a high energy line break (HELB) is blocked therefore closing off a drain path for the water.  This represented an unanalyzed condition where both divisions of essential switchgear could be impacted.  As a result, both divisions of essential switchgear were declared inoperable and Technical Specification LCO 3.0.3 was entered.  At 09:55 on 07/26/07, the closed fire door was restored to the open state. Both divisions of switchgear were declared Operable and LCO 3.0.3 was exited.  No system actuations occurred as a part of this event.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 22:16, 1 March 2018

ENS 43525 +/-
Where
Monticello Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+2.5 h0.104 days <br />0.0149 weeks <br />0.00342 months <br />)
Opened: Randy Sand
16:32 Jul 26, 2007
NRC Officer: Joe O'Hara
Last Updated: Jul 26, 2007
43525 - NRC Website