| event date = 06/23/2013 21:20 PDT | | event date = 06/23/2013 21:20 PDT | ||
| last update date = 08/21/2013 | | last update date = 08/21/2013 | ||
| title = Loss | | title = Loss of 230 Kv Offsite Power Results in the Automatic Start of Emergency Diesel Generators | ||
| event text = At 2120 PDT, Diablo Canyon Power Plant experienced a loss of the offsite 230 kV startup power source due to an offsite transmission system relay actuation, resulting in valid anticipatory starts of Units 1 and 2 three emergency diesel generators on each unit. All diesels successfully started but were not loaded. All systems operated as designed with no problems observed. | | event text = At 2120 PDT, Diablo Canyon Power Plant experienced a loss of the offsite 230 kV startup power source due to an offsite transmission system relay actuation, resulting in valid anticipatory starts of Units 1 and 2 three emergency diesel generators on each unit. All diesels successfully started but were not loaded. All systems operated as designed with no problems observed. | ||
The 230 kV startup power source is the only offsite power system designed to be immediately available following an accident. However, the safety related onsite emergency diesel system would have provided power to mitigate the consequences of an accident while the 230 kV was unavailable. | The 230 kV startup power source is the only offsite power system designed to be immediately available following an accident. However, the safety related onsite emergency diesel system would have provided power to mitigate the consequences of an accident while the 230 kV was unavailable. |
Latest revision as of 21:00, 1 March 2018
Where | |
---|---|
Diablo Canyon California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+0.25 h0.0104 days <br />0.00149 weeks <br />3.4245e-4 months <br />) | |
Opened: | Adam Peck 04:35 Jun 24, 2013 |
NRC Officer: | Vince Klco |
Last Updated: | Aug 21, 2013 |