ENS 49143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/23/2013 21:20 PDT
| event date = 06/23/2013 21:20 PDT
| last update date = 08/21/2013
| last update date = 08/21/2013
| title = Loss Of 230 Kv Offsite Power Results In The Automatic Start Of Emergency Diesel Generators
| title = Loss of 230 Kv Offsite Power Results in the Automatic Start of Emergency Diesel Generators
| event text = At 2120 PDT, Diablo Canyon Power Plant experienced a loss of the offsite 230 kV startup power source due to an offsite transmission system relay actuation, resulting in valid anticipatory starts of Units 1 and 2 three emergency diesel generators on each unit.  All diesels successfully started but were not loaded.  All systems operated as designed with no problems observed.
| event text = At 2120 PDT, Diablo Canyon Power Plant experienced a loss of the offsite 230 kV startup power source due to an offsite transmission system relay actuation, resulting in valid anticipatory starts of Units 1 and 2 three emergency diesel generators on each unit.  All diesels successfully started but were not loaded.  All systems operated as designed with no problems observed.
The 230 kV startup power source is the only offsite power system designed to be immediately available following an accident.  However, the safety related onsite emergency diesel system would have provided power to mitigate the consequences of an accident while the 230 kV was unavailable.  
The 230 kV startup power source is the only offsite power system designed to be immediately available following an accident.  However, the safety related onsite emergency diesel system would have provided power to mitigate the consequences of an accident while the 230 kV was unavailable.  

Latest revision as of 21:00, 1 March 2018

ENS 49143 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+0.25 h0.0104 days <br />0.00149 weeks <br />3.4245e-4 months <br />)
Opened: Adam Peck
04:35 Jun 24, 2013
NRC Officer: Vince Klco
Last Updated: Aug 21, 2013
49143 - NRC Website
Loading map...