ENS 49361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/19/2013 12:20 CDT
| event date = 09/19/2013 12:20 CDT
| last update date = 09/19/2013
| last update date = 09/19/2013
| title = No Documented Plan In Place To Receive Additional Fuel Oil During Maximum Probable Flood Condition
| title = No Documented Plan in Place to Receive Additional Fuel Oil During Maximum Probable Flood Condition
| event text = On September 19, 2013, a potential unanalyzed condition was identified. The current licensing basis requires a 14 day supply of fuel oil. Preliminary calculations show that there is sufficient tank volume for the duration of design basis maximum probable flood condition. However, during maximum flood condition there is currently no documented plan in place to receive additional fuel oil to maintain Unit 1 and Unit 2 Emergency Diesel Generators operable and running to supply emergency power to essential loads for the duration of the effects of a design basis maximum probable flood condition. These effects, such as flooded roads, may exceed 14 days. This is not an immediate safety concern because additional fuel oil can be added to the fuel oil storage tanks for imminent flood conditions.
| event text = On September 19, 2013, a potential unanalyzed condition was identified. The current licensing basis requires a 14 day supply of fuel oil. Preliminary calculations show that there is sufficient tank volume for the duration of design basis maximum probable flood condition. However, during maximum flood condition there is currently no documented plan in place to receive additional fuel oil to maintain Unit 1 and Unit 2 Emergency Diesel Generators operable and running to supply emergency power to essential loads for the duration of the effects of a design basis maximum probable flood condition. These effects, such as flooded roads, may exceed 14 days. This is not an immediate safety concern because additional fuel oil can be added to the fuel oil storage tanks for imminent flood conditions.
The NRC Resident has been notified.
The NRC Resident has been notified.

Latest revision as of 21:00, 1 March 2018

ENS 49361 +/-
Where
Prairie Island Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+-0.12 h-0.005 days <br />-7.142857e-4 weeks <br />-1.64376e-4 months <br />)
Opened: Stephen Seilhymer
17:13 Sep 19, 2013
NRC Officer: Charles Teal
Last Updated: Sep 19, 2013
49361 - NRC Website
Loading map...