ENS 52204: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 08/03/2016 CDT | | event date = 08/03/2016 CDT | ||
| last update date = 09/30/2016 | | last update date = 09/30/2016 | ||
| title = Part 21 - Safety Related Component Welding | | title = Part 21 - Safety Related Component Welding by an Unqualified Welder | ||
| event text = The following was excerpted from a letter by Crane Nuclear, Inc.: | | event text = The following was excerpted from a letter by Crane Nuclear, Inc.: | ||
Shielded metal arc welding (SMAW) with F-5 filler metal was welded on safety related components by an unqualified welder. | Shielded metal arc welding (SMAW) with F-5 filler metal was welded on safety related components by an unqualified welder. |
Latest revision as of 21:44, 1 March 2018
Where | |
---|---|
Crane Nuclear, Inc. Bolingbrook, Illinois (NRC Region 3) | |
Organization: | Crane Nuclear, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+565 h23.542 days <br />3.363 weeks <br />0.774 months <br />) | |
Opened: | Burt Anderson 18:00 Aug 26, 2016 |
NRC Officer: | Dong Park |
Last Updated: | Sep 30, 2016 |
52204 - NRC Website | |