ENS 52204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/03/2016 CDT
| event date = 08/03/2016 CDT
| last update date = 09/30/2016
| last update date = 09/30/2016
| title = Part 21 - Safety Related Component Welding By An Unqualified Welder
| title = Part 21 - Safety Related Component Welding by an Unqualified Welder
| event text = The following was excerpted from a letter by Crane Nuclear, Inc.:
| event text = The following was excerpted from a letter by Crane Nuclear, Inc.:
Shielded metal arc welding (SMAW) with F-5 filler metal was welded on safety related components by an unqualified welder.
Shielded metal arc welding (SMAW) with F-5 filler metal was welded on safety related components by an unqualified welder.

Latest revision as of 21:44, 1 March 2018

ENS 52204 +/-
Where
Crane Nuclear, Inc.
Bolingbrook, Illinois (NRC Region 3)
Organization: Crane Nuclear, Inc.
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+565 h23.542 days <br />3.363 weeks <br />0.774 months <br />)
Opened: Burt Anderson
18:00 Aug 26, 2016
NRC Officer: Dong Park
Last Updated: Sep 30, 2016
52204 - NRC Website