ML17331B048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N.R.C.OPERATING DATAREPORTDOCKETNO.50-315DATE22/Oct/93 COMPLETED BYJDJanisseTELEPHONE 616-465-5901 OPERATING STATUS1.UnitNameD.C.CookUnit12.Reporting PeriodJuly933.LicensedThermalPower(MWt)32504.NamePlateRating(GrossMWe)11525.DesignElectrical Rating(NetMWe)10206.MaximumDependable Capacity(GROSSMWe)10567.MaximumDependable Capacity(NetMWe)1000notesRev.1Corrected theGrossGeneration YTD22/Oct/93 DGTurner8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons9.PowerLevelToWhichRestricted.
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period July 93 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 notes Rev.1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
IfAny(NetMWe)10.ReasonsForRestrictions.
If Any (Net MWe)10.Reasons For Restrictions.
IfAny:11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossTherm.EnergyGen.(MWH)17.GrossElect.EnergyGen.(MWH)18.NetElect.EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled overNextSixNoneThisMo.Yr.toDate744.05087.0744.05087.00'0.0744.05087.00.00.024080391631778477402052951107467965109331100.0100.0100.0100.0100.4100.498.498.50.00.0Months(Type,Date,andCumm.162887.0121981.4463.0119935.6321'351760107 114238470 109871696 74.674667~165.46.2Duration):
If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.to Date 744.0 5087.0 744.0 5087.0 0'0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm.162887.0 121981.4 463.0 119935.6 321'351760107 114238470 109871696 74.6 74 6 67~1 65.4 6.2 Duration):
25.IfShutDownAtEndofReport:Period,Estimated DateofStartup:26.UnitsinTestStatus(PriortoCommercial Operation):
25.If Shut Down At End of Report: Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
ForcastINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved(9311160039 931105PDRADOCK05000315.RP,DR P~ItLUvfV}}
Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved (9311160039 931105 PDR ADOCK 05000315.R P,DR P~I t L U vf V}}

Revision as of 07:23, 6 July 2018

Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date
ML17331B048
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1993
From: JANISSE J D, TURNER D G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331B046 List:
References
NUDOCS 9311160039
Download: ML17331B048 (2)


Text

N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period July 93 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 notes Rev.1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.

If Any (Net MWe)10.Reasons For Restrictions.

If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None This Mo.Yr.to Date 744.0 5087.0 744.0 5087.0 0'0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm.162887.0 121981.4 463.0 119935.6 321'351760107 114238470 109871696 74.6 74 6 67~1 65.4 6.2 Duration):

25.If Shut Down At End of Report: Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Forcast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved (9311160039 931105 PDR ADOCK 05000315.R P,DR P~I t L U vf V