{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | ||
-4352 March 2, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUALIFICATION PROGRAM INSPECTION | REQUALIFICATION PROGRAM INSPECTION | ||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
In a telephone conversation on March 1, 2016, Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of | In a telephone conversation on March 1, 2016 | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams. | , Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor | ||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via LISTSERV In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630-829-9834. Sincerely, | , made arrangements for the U.S. Nuclear Regulatory Commission ( | ||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION: Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 | NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station | ||
. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016 | |||
. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | |||
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | |||
-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. | |||
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T | |||
- F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555 | |||
-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | |||
-10202, (3150 | |||
-0018), Office of Management and Budget, Washington, DC 20503. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | |||
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.htm l (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630 | |||
-829-9834. Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety | |||
Docket Nos. 50 | |||
-237; 50-249 License Nos. DPR | |||
-19; DPR-25 cc: Distribution via LISTSERV | |||
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630 | |||
-829-9863, or me at 630 | |||
-829-9834. Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety | |||
Docket Nos. 50 | |||
-237; 50-249 License Nos. DPR | |||
-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION | |||
: Kimyata MorganButler RidsNrrDorlLpl3 | |||
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MEB for CZoia:jw ROrlikowski DATE 03/02/16 03/02/16 OFFICIAL RECORD COPY | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | |||
-4352 March 2, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUALIFICATION PROGRAM INSPECTION | REQUALIFICATION PROGRAM INSPECTION | ||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
In a telephone conversation on March 1, 2016, Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of | In a telephone conversation on March 1, 2016 | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams. | , Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor | ||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via LISTSERV In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630-829-9834. Sincerely, | , made arrangements for the U.S. Nuclear Regulatory Commission ( | ||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION: Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 | NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station | ||
. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016 | |||
. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | |||
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150 | |||
-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. | |||
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T | |||
- F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555 | |||
-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | |||
-10202, (3150 | |||
-0018), Office of Management and Budget, Washington, DC 20503. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | |||
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.htm l (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630 | |||
-829-9834. Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety | |||
Docket Nos. 50 | |||
-237; 50-249 License Nos. DPR | |||
-19; DPR-25 cc: Distribution via LISTSERV | |||
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630 | |||
-829-9863, or me at 630 | |||
-829-9834. Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety | |||
Docket Nos. 50 | |||
-237; 50-249 License Nos. DPR | |||
-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION | |||
: Kimyata MorganButler RidsNrrDorlLpl3 | |||
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MEB for CZoia:jw ROrlikowski DATE 03/02/16 03/02/16 OFFICIAL RECORD COPY}} |
Revision as of 11:25, 30 June 2018
ML16062A135 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 03/02/2016 |
From: | Orlikowski R J Operations Branch III |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
Download: ML16062A135 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 March 2, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Hanson:
In a telephone conversation on March 1, 2016
, Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor
, made arrangements for the U.S. Nuclear Regulatory Commission (
NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station
. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016
. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
- F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.htm l (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630
-829-9834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 cc: Distribution via LISTSERV
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630
-829-9863, or me at 630
-829-9834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION
- Kimyata MorganButler RidsNrrDorlLpl3
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MEB for CZoia:jw ROrlikowski DATE 03/02/16 03/02/16 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 March 2, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Hanson:
In a telephone conversation on March 1, 2016
, Mr. C. Zoia, Operations Inspector (Lead), and Mr. D. Siuda, Dresden Operations Training Instructor
, made arrangements for the U.S. Nuclear Regulatory Commission (
NRC) to inspect the licensed operator requalification program at the Dresden Nuclear Power Station
. The inspection is planned for the week of May 16, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the 2015 written examinations and those operating tests scheduled for the week of the inspection to the NRC Lead Inspector by April 15, 2016
. Mr. Siuda has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
These information collections were approved by the Office of Management and Budget (OMB), under approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T
- F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.htm l (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630-829-9863, or me at 630
-829-9834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 cc: Distribution via LISTSERV
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact C. Zoia at 630
-829-9863, or me at 630
-829-9834. Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 cc: Distribution via LISTSERV DISTRIBUTION
- Kimyata MorganButler RidsNrrDorlLpl3
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number: ML16062A135 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MEB for CZoia:jw ROrlikowski DATE 03/02/16 03/02/16 OFFICIAL RECORD COPY