{{#Wiki_filter:January 30, 2015   Administrative Judge Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 
{{#Wiki_filter:January 30, 2015 Administrative Judge  


In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Indian Point Nuclear Generating Units 2 and 3) Docket Nos. 50-247-LR and 50-286-LR
Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
Administrative Judge
 
Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge 
 
Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel
 
Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Indian Point Nuclear Generating Units 2 and 3) Docket Nos. 50-247-LR and 50-286-LR  


==Dear Administrative Judges:==
==Dear Administrative Judges:==
Pursuant to the Atomic Safety and Licensing Board's December 18, 2008, "Memorandum and Order (Addressing Requests that the Proceeding be Conducted Pursuant to Subpart G)," slip op. at 13, the Licensing Board's "Order (Granting Consent Motion Regarding Mandatory Disclosures)," dated January 30, 2009, at 1, the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of each item in Hearing File Index, Supplement 72 is appended hereto as Attachment 1.
On or about February 10, 2015, the documents identified in the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL: http://ehd.nrc.gov/EHDProceeding/home.asp. The hearing file will be contained in a sub-folder entitled, "Indian PT Hearing File, Update 72" in the "Indian_PT_2&3_50-247&50-286-LR" folder of the EHD. In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log, identifying documents withheld under the deliberative process; appended hereto as Attachment
: 2. Also attached is the Declaration of Christopher G. Miller formally invoking the deliberative process privilege with respect to the documents in Attachment 2. The Staff will preserve and  UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 Judge McDade January 30, 2015 Judge Kennedy Judge Wardwell  maintain the privileged documents identified in these logs during the pendency of this proceeding. 


Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Michael J. Wentzel, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by January 23, 2014.
Pursuant to the Atomic Safety and Licensing Board's December 18, 2008, "Memorandum and Order (Addressing Requests that the Proceeding be Conducted Pursuant to Subpart G)," slip op. at 13, the Licensing Board's "Order (Granting Consent Motion Regarding Mandatory Disclosures)," dated January 30, 2009, at 1, the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. Materials in the hearing file may be accessed through
Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.
 
the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of each item in Hearing File Index, Supplement 72 is appended hereto as Attachment 1. 
 
On or about February 10, 2015, the documents identified in the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL: http://ehd.nrc.gov/EHDProceeding/home.asp. The hearing file will be contained in a sub-folder entitled, "Indian PT Hearing File, Update 72" in the "Indian_PT_2&3_50-247&50-286-LR" folder of the EHD.
In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log, identifying documents withheld under the deliberative process; appended hereto as Attachment
: 2. Also attached is the Declaration of Christopher G. Miller formally invoking the deliberative process privilege with respect to the documents in Attachment 2. The Staff will preserve and UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001
 
Judge McDade January 30, 2015 Judge Kennedy Judge Wardwell maintain the privileged documents identified in these logs during the pendency of this proceeding. 
 
Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Michael J. Wentzel, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by January 23, 2014.  
 
Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.  


Sincerely,  /Signed (electronically) by/ Anita Ghosh        Counsel for NRC Staff  
Sincerely,  
  /Signed (electronically) by/
Anita Ghosh        Counsel for NRC Staff  


==Enclosures:==
==Enclosures:==
Attachment 1 - Hearing File Index, Supplement 72    Attachment 2 - Deliberative Process Privilege Log Declaration of Christopher G. Miller Affidavit of Michael J. Wentzel cc w/Encls.: Service List 
Attachment 1 - Hearing File Index, Supplement 72    Attachment 2 - Deliberative Process Privilege Log Declaration of Christopher G. Miller Affidavit of Michael J. Wentzel  


January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of    )        )
cc w/Encls.: Service List 
 
January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of    )        )
ENTERGY NUCLEAR OPERATIONS, INC.  ) Docket Nos. 50-247-LR, 50-286-LR  
ENTERGY NUCLEAR OPERATIONS, INC.  ) Docket Nos. 50-247-LR, 50-286-LR  
       )   
       )   
       )  (Indian Point Nuclear Generating Units 2 and 3) )
       )  (Indian Point Nuclear Generating Units 2 and 3) )  
DECLARATION OF CHRISTOPHER G. MILLER I, Christopher G. Miller, do hereby state as follows: 1. I am employed as the Director of the Division of License Renewal (DLR) in the U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Indian Point Nuclear Generating Units 2 and 3 license renewal application. 2. As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified documents as privileged because they contained information concerning the Staff's pre-decisional deliberative process. The documents are listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 3. I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain pre-decisional information concerning the Staff's review of the license renewal application. The documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency  position with respect to the matters discussed therein. The documents comprise part of the deliberative process necessary for the Staff's review of the pending license renewal application. 4. Further, I have determined that disclosure of the documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made. 5. Accordingly, I formally invoke the deliberative process privilege with respect to the documents listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.                 Executed in Accord with 10 CFR 2.304(d)        Christopher G. Miller   Executed in Rockville, Maryland this 30th day of January, 2015 January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of    )  
 
DECLARATION OF CHRISTOPHER G. MILLER  
 
I, Christopher G. Miller, do hereby state as follows:  
: 1. I am employed as the Director of the Division of License Renewal (DLR) in the U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Indian Point Nuclear Generating Units 2 and 3 license renewal application. 2. As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified documents as privileged because they contai ned information concerning the Staff's pre-decisional deliberative process. The documents are listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 3. I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain pre-decisional information concerning the Staff's review of the license renewal application. The documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency  position with respect to the matters discussed therein. The documents comprise part of the deliberative process necessary for the Staff's review of the pending license renewal application. 4. Further, I have determined that disclosure of the documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made. 5. Accordingly, I formally invoke the deliberative process privilege with respect to the documents listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accord with 10 CFR 2.304(d)        Christopher G. Miller Executed in Rockville, Maryland this 30th day of January, 2015
 
January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
 
In the Matter of    )  
       ) ENTERGY NUCLEAR OPERATIONS, INC.  ) Docket Nos. 50-247-LR, 50-286-LR        )   
       ) ENTERGY NUCLEAR OPERATIONS, INC.  ) Docket Nos. 50-247-LR, 50-286-LR        )   
       )   
       )   
(Indian Point Nuclear Generating  )
(Indian Point Nuclear Generating  )
Units 2 and 3)    )   AFFIDAVIT OF MICHAEL J. WENTZEL CONCERNING  MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b) I, Michael J. Wentzel, do hereby state as follows: 1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commission's (NRC) Nuclear Reactor Regulation. I currently serve as a project manager for the Indian Point Nuclear Generating Units 2 and 3 license renewal application ("LRA"). Among my other duties as project manager, since September 2014, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of January 23, 2015. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.                       Executed in Accord with 10 CFR 2.304(d)       Michael J. Wentzel Executed in Rockville, Maryland this 30th day of January 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of    )  
Units 2 and 3)    )
AFFIDAVIT OF MICHAEL J. WENTZEL CONCERNING  MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Michael J. Wentzel, do hereby state as follows:  
: 1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commission's (NRC) Nuclear Reactor Regulation. I currently serve as a project manager for the Indian Point Nuclear Generating Units 2 and 3 license renewal application ("LRA"). Among my other duties as project manager, since September 2014, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of January 23, 2015. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accord with 10 CFR 2.304(d)
Michael J. Wentzel Executed in Rockville, Maryland this 30th day of January 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
 
In the Matter of    )  
       )
       )
ENTERGY NUCLEAR OPERATIONS, INC. )  Docket Nos. 50-247-LR, 50-286-LR ) (Indian Point Nuclear Generating  ) Units 2 and 3)    )
ENTERGY NUCLEAR OPERATIONS, INC. )  Docket Nos. 50-247-LR, 50-286-LR  
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Indian Point Hearing File, including:  - Indian Point License Renewal  Hearing File Index Supplement 72; Attachment 2 - Indian Point License Renewal Hearing File Index Supplement 72 - Deliberative Process Privilege; Declaration of Christopher G. Miller, dated January 30, 2015; and Affidavit of Michael J. Wentzel, dated January 30, 2015, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E-Filing System, this 30th day of January, 2015.
) (Indian Point Nuclear Generating  ) Units 2 and 3)    )  
   /Signed (electronically) by/               Anita Ghosh            Counsel for NRC Staff        U.S. Nuclear Regulatory Commission        Office of the General Counsel Mail Stop - O-15D21 Washington, DC  20555 Telephone:  (301) 415-4113 E-mail: anita.ghosh@nrc.gov       Date of signature:  January 30, 2015}}
 
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Indian Point Hearing File, including:  - Indian Point License Renewal  Hearing File Index Supplement 72; Attachment 2 - Indian Point License Renewal Hearing File Index Supplement 72 - Deliberative Process Privilege; Declaration of Christopher G. Miller, dated January 30, 2015; and Affidavit of Michael J. Wentzel, dated January 30, 2015, in the above-captioned proceeding have been served upon  
 
the Electronic Information Exchange, the NRC's E-Filing System, this 30th day of January, 2015.  
 
   /Signed (electronically) by/
Anita Ghosh            Counsel for NRC Staff        U.S. Nuclear Regulatory Commission        Office of the General Counsel Mail Stop - O-15D21 Washington, DC  20555 Telephone:  (301) 415-4113 E-mail:
anita.ghosh@nrc.gov Date of signature:  January 30, 2015}}

Revision as of 05:54, 1 July 2018

NRC Staff Hearing File Update 72
ML15030A489
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/30/2015
From: Amitava Ghosh
NRC/OGC
To: Kennedy M F, McDade L G, Wardwell R E
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 27152
Download: ML15030A489 (12)


Text

January 30, 2015 Administrative Judge

Lawrence G. McDade, Chair Atomic Safety and Licensing Board Panel

Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Administrative Judge

Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge

Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel

Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

In the Matter of ENTERGY NUCLEAR OPERATIONS, INC. (Indian Point Nuclear Generating Units 2 and 3) Docket Nos. 50-247-LR and 50-286-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Board's December 18, 2008, "Memorandum and Order (Addressing Requests that the Proceeding be Conducted Pursuant to Subpart G)," slip op. at 13, the Licensing Board's "Order (Granting Consent Motion Regarding Mandatory Disclosures)," dated January 30, 2009, at 1, the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. Materials in the hearing file may be accessed through

the Agencywide Documents Access and Management System ("ADAMS"). An index containing the ADAMS accession number, date, and title or description of each item in Hearing File Index, Supplement 72 is appended hereto as Attachment 1.

On or about February 10, 2015, the documents identified in the hearing file will be made available via the Electronic Hearing Docket ("EHD"), which may be accessed at the following URL: http://ehd.nrc.gov/EHDProceeding/home.asp. The hearing file will be contained in a sub-folder entitled, "Indian PT Hearing File, Update 72" in the "Indian_PT_2&3_50-247&50-286-LR" folder of the EHD.

In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log, identifying documents withheld under the deliberative process; appended hereto as Attachment

2. Also attached is the Declaration of Christopher G. Miller formally invoking the deliberative process privilege with respect to the documents in Attachment 2. The Staff will preserve and UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001

Judge McDade January 30, 2015 Judge Kennedy Judge Wardwell maintain the privileged documents identified in these logs during the pendency of this proceeding.

Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Michael J. Wentzel, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by January 23, 2014.

Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.

Sincerely,

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff

Enclosures:

Attachment 1 - Hearing File Index, Supplement 72 Attachment 2 - Deliberative Process Privilege Log Declaration of Christopher G. Miller Affidavit of Michael J. Wentzel

cc w/Encls.: Service List

January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) )

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR

)

) (Indian Point Nuclear Generating Units 2 and 3) )

DECLARATION OF CHRISTOPHER G. MILLER

I, Christopher G. Miller, do hereby state as follows:

1. I am employed as the Director of the Division of License Renewal (DLR) in the U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Indian Point Nuclear Generating Units 2 and 3 license renewal application. 2. As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified documents as privileged because they contai ned information concerning the Staff's pre-decisional deliberative process. The documents are listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 3. I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain pre-decisional information concerning the Staff's review of the license renewal application. The documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. The documents comprise part of the deliberative process necessary for the Staff's review of the pending license renewal application. 4. Further, I have determined that disclosure of the documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made. 5. Accordingly, I formally invoke the deliberative process privilege with respect to the documents listed in Attachment 2 to the submission of the Staff's Hearing File Index Supplement 72. 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d) Christopher G. Miller Executed in Rockville, Maryland this 30th day of January, 2015

January 30, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of )

) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR )

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

AFFIDAVIT OF MICHAEL J. WENTZEL CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Michael J. Wentzel, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commission's (NRC) Nuclear Reactor Regulation. I currently serve as a project manager for the Indian Point Nuclear Generating Units 2 and 3 license renewal application ("LRA"). Among my other duties as project manager, since September 2014, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of January 23, 2015. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Michael J. Wentzel Executed in Rockville, Maryland this 30th day of January 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR

) (Indian Point Nuclear Generating ) Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Indian Point Hearing File, including: - Indian Point License Renewal Hearing File Index Supplement 72; Attachment 2 - Indian Point License Renewal Hearing File Index Supplement 72 - Deliberative Process Privilege; Declaration of Christopher G. Miller, dated January 30, 2015; and Affidavit of Michael J. Wentzel, dated January 30, 2015, in the above-captioned proceeding have been served upon

the Electronic Information Exchange, the NRC's E-Filing System, this 30th day of January, 2015.

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: