ML18088A754: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From:Helvenston, | {{#Wiki_filter:From:Helvenston, Edward To:"DM S"Cc:Lynch, Steven | ||
; Montgomery, Cindy | |||
; Boyle, Patrick | |||
==Subject:== | ==Subject:== | ||
Draft Request for Additional Information for Aerotest License | Draft Request for Additional Information for Aerotest License Renewal Date:Thursday, March 29, 2018 11:14:19 AM Attachments: | ||
How to UNZIP.html SecureZIP Attachments.zip Mike, By letter dated December 20, 2017 (Agencywide Documents Access and Management System [ADAMS] Accession Nos. ML17363A303 and ML18045A571), | |||
Aerotest Operations, Inc. (Aerotest) submitted its updated Safety Analysis Report (SAR) for renewal of FacilityOperating License No. R-98 for the Aerotest Radiography and Research Reactor (ARRR)for U.S. Nuclear Regulatory Commission (NRC) review. In the course of reviewing Aerotest's December 20, 2017, SAR, the NRC staff hasdetermined that additional information is required to complete its evaluation. | |||
Thisinformation is necessary to demonstrate Aerotest's compliance with the regulations contained in Title 10 of the Code of Federal Regulations (10 CFR) Parts 20, "Standards forProtection against Radiation" and 50, "Domestic Licensing of Production and Utilization Facilities." | |||
Therefore, the NRC staff has prepared the attached draft request for additional information (RAI). We are providing a copy of this draft, prior to formally transmitting the RAI, toprovide Aerotest with an opportunity to review the draft to ensure that the RAI is clear andunderstandable. | |||
So that Aerotest has time to review the draft, we will wait at least 10working days from the date of this email before formally transmitting the RAI. If you haveany questions regarding the draft RAI, please contact me as soon as possible and we canarrange a time to discuss. | |||
I would also request that you please contact me after you havereviewed the RAI in order to discuss an appropriate response time for the RAI. Additionally, we request that Aerotest also review this draft RAI to ensure that proprietary orother sensitive information has not been inadvertently included. | |||
Should any sensitive information be identified, please contact me within the next 10 working days from the dateof this email. Please note that, because the RAI is still a draft, changes to the document before it isformally transmitted to Aerotest are possible. | |||
This email will be placed in public ADAMS. After 10 working days, if Aerotest has notindicated that is has identified any sensitive information in this draft RAI, the draft RAIattachment will also be placed in public ADAMS. The attachment is encrypted with SecureZip. | |||
Please give myself or Cindy Montgomery (301-415-3398) a call and we can provide the password. | |||
Thanks,Ed Ed Helvenston, U.S. NRCResearch and Test Reactor Licensing Branch (PRLB) | |||
Division of Licensing Projects (DLP)Office of Nuclear Reactor Regulation (NRR)O-12C07(301) 415-4067}} | Division of Licensing Projects (DLP)Office of Nuclear Reactor Regulation (NRR)O-12C07(301) 415-4067}} |
Revision as of 00:51, 29 June 2018
ML18088A754 | |
Person / Time | |
---|---|
Site: | Aerotest |
Issue date: | 03/29/2018 |
From: | Edward Helvenston Research and Test Reactors Licensing Projects Branch |
To: | Aerotest |
Helvenston E, NRR/DLP, 415-4067 | |
Shared Package | |
ML18088A753 -Pkg. | List: |
References | |
Download: ML18088A754 (2) | |
Text
From:Helvenston, Edward To:"DM S"Cc:Lynch, Steven
- Montgomery, Cindy
- Boyle, Patrick
Subject:
Draft Request for Additional Information for Aerotest License Renewal Date:Thursday, March 29, 2018 11:14:19 AM Attachments:
How to UNZIP.html SecureZIP Attachments.zip Mike, By letter dated December 20, 2017 (Agencywide Documents Access and Management System [ADAMS] Accession Nos. ML17363A303 and ML18045A571),
Aerotest Operations, Inc. (Aerotest) submitted its updated Safety Analysis Report (SAR) for renewal of FacilityOperating License No. R-98 for the Aerotest Radiography and Research Reactor (ARRR)for U.S. Nuclear Regulatory Commission (NRC) review. In the course of reviewing Aerotest's December 20, 2017, SAR, the NRC staff hasdetermined that additional information is required to complete its evaluation.
Thisinformation is necessary to demonstrate Aerotest's compliance with the regulations contained in Title 10 of the Code of Federal Regulations (10 CFR) Parts 20, "Standards forProtection against Radiation" and 50, "Domestic Licensing of Production and Utilization Facilities."
Therefore, the NRC staff has prepared the attached draft request for additional information (RAI). We are providing a copy of this draft, prior to formally transmitting the RAI, toprovide Aerotest with an opportunity to review the draft to ensure that the RAI is clear andunderstandable.
So that Aerotest has time to review the draft, we will wait at least 10working days from the date of this email before formally transmitting the RAI. If you haveany questions regarding the draft RAI, please contact me as soon as possible and we canarrange a time to discuss.
I would also request that you please contact me after you havereviewed the RAI in order to discuss an appropriate response time for the RAI. Additionally, we request that Aerotest also review this draft RAI to ensure that proprietary orother sensitive information has not been inadvertently included.
Should any sensitive information be identified, please contact me within the next 10 working days from the dateof this email. Please note that, because the RAI is still a draft, changes to the document before it isformally transmitted to Aerotest are possible.
This email will be placed in public ADAMS. After 10 working days, if Aerotest has notindicated that is has identified any sensitive information in this draft RAI, the draft RAIattachment will also be placed in public ADAMS. The attachment is encrypted with SecureZip.
Please give myself or Cindy Montgomery (301-415-3398) a call and we can provide the password.
Thanks,Ed Ed Helvenston, U.S. NRCResearch and Test Reactor Licensing Branch (PRLB)
Division of Licensing Projects (DLP)Office of Nuclear Reactor Regulation (NRR)O-12C07(301) 415-4067