ML13029A673: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Final Simulator Scenarios (containing ES
-D-1 and ES-D-2)  There were no Final Simulator Scenarios for the North Anna 2012
-302 Exam (the Simulator portion of the Operating Test was waived).}}

Revision as of 08:39, 19 July 2018

North Anna 2012-302 Final Simulator Scenarios
ML13029A673
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/24/2013
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
50-338/12-302, 50-339/12-302
Download: ML13029A673 (1)


Text

Final Simulator Scenarios (containing ES

-D-1 and ES-D-2) There were no Final Simulator Scenarios for the North Anna 2012

-302 Exam (the Simulator portion of the Operating Test was waived).