ML23129A353: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SECURITY-RELATED INFORMATION. | {{#Wiki_filter:SECURITY-RELATED INFORMATION. | ||
WITHHOLD UNDER 10 CFR 2.390 | WITHHOLD UNDER 10 CFR 2.390 DRAWING 2063 GENERAL ARRANGEMENT, REACTOR BUILDING, PLAN AT ELEVATION 976'-0"}} | ||
DRAWING 2063 GENERAL ARRANGEMENT, REACTOR BUILDING, PLAN AT ELEVATION 976'-0"}} | |||
Latest revision as of 05:59, 27 November 2024
| ML23129A353 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/20/2023 |
| From: | Nebraska Public Power District (NPPD) |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML23129A261 | List:
|
| References | |
| NLS2023022 | |
| Download: ML23129A353 (1) | |
Text
SECURITY-RELATED INFORMATION.
WITHHOLD UNDER 10 CFR 2.390 DRAWING 2063 GENERAL ARRANGEMENT, REACTOR BUILDING, PLAN AT ELEVATION 976'-0"