BSEP-85-0208, Forwards Monthly Operating Repts for Jan 1985 & Corrected Monthly Operating Rept for Unit 2 for Dec 1984: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:P                         -
{{#Wiki_filter:P CiPE Carohna Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0208 Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 HONTHLY OPERATING REPORT
CiPE
* Carohna Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0208 Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 HONTHLY OPERATING REPORT


==Dear Mr. DeYoung:==
==Dear Mr. DeYoung:==
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1985.
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1985.
An integrator reading error which occurred in December 1984 necessitates an 11 MW correction to lines 17 and 18 of the Unit 2 report for that month.           A corrected copy of the report is included for your records.
An integrator reading error which occurred in December 1984 necessitates an 11 MW correction to lines 17 and 18 of the Unit 2 report for that month.
Very truly yours, dig C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/vt/LETCG Enclosures cc:   Ms. J. C. Baker             Mr. S. W. McDowell Mr. M. R. Beebe    '
A corrected copy of the report is included for your records.
Mr. J. P. O'Reilly Mr. J. L. Harness           INPO                                 . , y,1,   j   g[
Very truly yours, dig C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/vt/LETCG Enclosures cc:
                                                                        ,.s..a '-           9)l-w
Ms. J. C. Baker Mr. S. W. McDowell Mr. J. P. O'Reilly Mr. M. R. Beebe Mr. J. L. Harness INPO
                                                                                  'W Ccit &m 1
., y,1, j
G503100478 850206 PDR     ADOCK 05000324 R                   PDR}}
g[
w
,.s..a '-
9)l-
'W
&m 1
Ccit G503100478 850206 PDR ADOCK 05000324 R
PDR}}

Latest revision as of 01:11, 13 December 2024

Forwards Monthly Operating Repts for Jan 1985 & Corrected Monthly Operating Rept for Unit 2 for Dec 1984
ML20112A847
Person / Time
Site: Brunswick  
Issue date: 02/06/1985
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20112A850 List:
References
BSEP-85-0208, BSEP-85-208, NUDOCS 8503180478
Download: ML20112A847 (1)


Text

P CiPE Carohna Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 6,1985 FILE: B09-13510C SERIAL: BSEP/85-0208 Mr. R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nucicar Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 HONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1985.

An integrator reading error which occurred in December 1984 necessitates an 11 MW correction to lines 17 and 18 of the Unit 2 report for that month.

A corrected copy of the report is included for your records.

Very truly yours, dig C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/vt/LETCG Enclosures cc:

Ms. J. C. Baker Mr. S. W. McDowell Mr. J. P. O'Reilly Mr. M. R. Beebe Mr. J. L. Harness INPO

., y,1, j

g[

w

,.s..a '-

9)l-

'W

&m 1

Ccit G503100478 850206 PDR ADOCK 05000324 R

PDR