ND-21-0718, Vogtie Electric Generating Plant - Units 3 and 4 Sixteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Desiqn-Basis External Events (EA-12-049): Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:}} | ||
Revision as of 23:23, 16 January 2022
ML21237A249 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 08/25/2021 |
From: | Yox M Southern Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
EA-12-049, ND-21-0718 | |
Download: ML21237A249 (4) | |