ML20235U331: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 2: Line 2:
| number = ML20235U331
| number = ML20235U331
| issue date = 02/24/1989
| issue date = 02/24/1989
| title = Ack Receipt of 890214 Ltr Requesting Discretionary Enforcement to Allow Continued Operation W/Reactor Coolant Pump Power Monitor Channels Tech Spec Surveillance Not Performed.Request Granted in 890216 Telcon
| title = Ack Receipt of Requesting Discretionary Enforcement to Allow Continued Operation W/Reactor Coolant Pump Power Monitor Channels Tech Spec Surveillance Not Performed.Request Granted in 890216 Telcon
| author name = Ernst M
| author name = Ernst M
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8903090150
| document report number = NUDOCS 8903090150
| title reference date = 02-14-1989
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 20: Line 21:


==SUBJECT:==
==SUBJECT:==
DISCRETIONARY ENFORCEMENT TO ALLOW CONTINUED OPERATION WITH REACTOR COOLANT PUMP POWER MONITOR CHANNELS TECHNICAL SPECIFICATION SURVEILLANCE NOT PERFORMED This letter acknowledges your letter dated February 14, 1989, requesting discretionary enforcement associated with the performance of the surveillance required by Technical Specification 4.3.1.1.1, Reactor Coolant Pump Power Monitor Surveillance. This request is limited to the time period orior to the next plant shutdown, presently scheduled to begin no later than February 28, 1989.              g We have reviewed your request which included discussions with your staff during the week of February 13, 1989, and the request was subsequently granted in a telephone conversation with Region II staff on February 16, 1989.
DISCRETIONARY ENFORCEMENT TO ALLOW CONTINUED OPERATION WITH REACTOR COOLANT PUMP POWER MONITOR CHANNELS TECHNICAL SPECIFICATION SURVEILLANCE NOT PERFORMED This letter acknowledges your {{letter dated|date=February 14, 1989|text=letter dated February 14, 1989}}, requesting discretionary enforcement associated with the performance of the surveillance required by Technical Specification 4.3.1.1.1, Reactor Coolant Pump Power Monitor Surveillance. This request is limited to the time period orior to the next plant shutdown, presently scheduled to begin no later than February 28, 1989.              g We have reviewed your request which included discussions with your staff during the week of February 13, 1989, and the request was subsequently granted in a telephone conversation with Region II staff on February 16, 1989.
Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Sincerely.

Revision as of 13:48, 20 March 2021

Ack Receipt of Requesting Discretionary Enforcement to Allow Continued Operation W/Reactor Coolant Pump Power Monitor Channels Tech Spec Surveillance Not Performed.Request Granted in 890216 Telcon
ML20235U331
Person / Time
Site: Crystal River 
Issue date: 02/24/1989
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8903090150
Download: ML20235U331 (1)


Text

_ _-_ _ _ _ _ _ _ _

W fl. FEB 2 4 su Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. W. S. Wilgus Vice President. Nuclear Operations ATTN: Manager, Nuclear Licensing L P. O. Box 219 Crystal River, FL 32629 Gentlemen:

SUBJECT:

DISCRETIONARY ENFORCEMENT TO ALLOW CONTINUED OPERATION WITH REACTOR COOLANT PUMP POWER MONITOR CHANNELS TECHNICAL SPECIFICATION SURVEILLANCE NOT PERFORMED This letter acknowledges your letter dated February 14, 1989, requesting discretionary enforcement associated with the performance of the surveillance required by Technical Specification 4.3.1.1.1, Reactor Coolant Pump Power Monitor Surveillance. This request is limited to the time period orior to the next plant shutdown, presently scheduled to begin no later than February 28, 1989. g We have reviewed your request which included discussions with your staff during the week of February 13, 1989, and the request was subsequently granted in a telephone conversation with Region II staff on February 16, 1989.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original signed by J. Philip Stohr (for) h30oj50s90pp4 P DOCK 05000302 Malcolm L. Ernst PNU Acting Regional Administrator cc: P. F. McKee, Director, Nuclear Plant Operations E. C. Simpson, Director, Nuclear Site Support State of Florida bec: NRC Resident Inspector DRS Technical Assistant Document Control Desk

/

l 1 R RII /

RLrlen ak son AM/b

  • NM k2L[ 7 ;4 gj JL 97 g o Sro/