ML20138A771: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20138A771 | | number = ML20138A771 | ||
| issue date = 03/07/1986 | | issue date = 03/07/1986 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/85-02. Corrective Actions Examined During Region I Insps on 850514 & 0722-26 Adequate | ||
| author name = Martin T | | author name = Martin T | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8603200056 | | document report number = NUDOCS 8603200056 | ||
| title reference date = 04-24-1985 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
Revision as of 03:58, 13 December 2021
| ML20138A771 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 03/07/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| References | |
| NUDOCS 8603200056 | |
| Download: ML20138A771 (2) | |
See also: IR 05000219/1985002
Text
r m
i 4 ,
- -ti.;a T.1er:ms
.
s
~w n' 7 Wth]YiO&th&W
MAR 0 71986
Docket No. 50-219
GPU Nuclear Corporation
ATTN: Mr. P. B. Fiedler
Vice President and Director
0yster Creek Nuclear Generating Station
P. O. Box 388
Forked River, NJ 08731
Gentlemen:
Subject: Inspection No. 50-219/85-02
This is in reference to your letter dated April 24, 1985, in response to our
letter dated March 29, 1985. We apologize for the delay in responding to your
letter.
Thank you for informing us of the interim and final corrective actions
documented in your letter. Those actions were examined during NRC Region I
inspections conducted on May 14, 1985 and on July 22-26, 1985 and appeared to
be adequate.
In your response to Violation A, you contend that it was not technically
feasible (or practical) to comply with the commitment in your physical security
plan. However, as demonstrated by your interim and final corrective actions,
it is our view that it was technically feasible to comply with your commitment.
In addition, the measure you implemented on your own to compensate for the
weakness, as described in the first paragraph of your response, did not obviate
the vulnerability that formed the basis for the violation and, therefore, would
not have been accepted for that purpose, if it had been submitted to the NRC.
Further, an obstruction in the same area added to the vulnerability, and the
existence of that obstruction was also not in compliance with NRC requirements.
Therefore, we find that the violation is valid and will remain as cited.
Attachment A to your letter contains information which is exempt from public
disclosure in accordance with 10 CFR 73.21. Therefore, the attachment will
not be placed in the NRC's Public Document Room and will receive limited
distribution.
Your cooperation with us is appreciated.
Sincerely,
'
Original Signed 3y:
Thomas T. ta-tin
Thomas T. Martin, Director
$[2j@8%$$$o0[19 Division of Radiation Safety and
Safeguards
G PDR
0FFICIAL RECORD COPY RL GPU - 0001.0.0 '
'
03/05/86
'tf.y! a.:d l10
r-
'
I' . ,
GPU Nuclear Corporation 2
W 07 M
cc:
M. Laggart, BWR Licensing Manager
Licensing Manager, Oyster Creek
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State.of New Jersey
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
Section Chief, DRP
/
,/
RI: RS S R SS
Ke',ig/gcb oy er rt'i n
j/[/86 I
0FFICIAL RECORD COPY RL GPU - 0001.1.0