ML20155K163: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,-   - __   _ - - - -                 - - - - - - . - - _ _ . - . - - - - - - - - _ - - _ - - - _ _ _ _ _ - - _ - - - _ _ _ _ _ - - _ - - _ _ - - _ - - - - - - . _ - - - - -                                                 -
{{#Wiki_filter:,-
                                                                                                                                                                                                                                    - - - - - - _
- __
            '
_ - - - -
  ..                     ,
- - - - - - . - - _ _ . - . - - - - - - - - _ - - _ - - - _ _ _ _ _ - - _ - - - _ _ _ _ _ - - _ - - _ _ - - _ - - - - - - . _ - - - - -
,           .
-
                                                                                                                                                                                      June 8, 1988
- - - - - - _
                        Docket No. 50-302
'
                        License No. DPR-72
..
                        Florida Power Corporation
,
                        Mr. W. S. Wilgus
,
                        Vice President Nuclear Operations
.
                        ATTN: Manager, Nuclear Licensing
June 8, 1988
                        P. O. Box 219
Docket No. 50-302
                        Crystal River, FL 32629
License No. DPR-72
                        Gentlemen:
Florida Power Corporation
                        SUBJECT:   NRC INSPECTION REPORT NO. 50-302/88-09
Mr. W. S. Wilgus
                        This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Vice President Nuclear Operations
                        L. Lawyer on March 28 - April 8,1988. The inspection included a review of
ATTN: Manager, Nuclear Licensing
                        Emergency Operating Procedures for your Crystal River facility. At the
P. O. Box 219
                        conclusion of the inspection, the findings were discussed with those members
Crystal River, FL 32629
                        of your staff identified in the enclosed inspection report.
Gentlemen:
                        Areas examined during the inspection are identified in the report. Within
SUBJECT:
                        these areas, the inspection consisted of selective examinations of procedures
NRC INSPECTION REPORT NO. 50-302/88-09
                        and representative records, interviews with personnel, and observation of
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
                        activities in progress. No violations or deviations were identified.
L. Lawyer on March 28 - April 8,1988.
                        Although numerous deficiencies were identified, the Emergency Operating
The inspection included a review of
                        Procedures were found to be adequate for continued operation of the facility.
Emergency Operating Procedures for your Crystal River facility.
                        Whfin none 'of the individual deficiencies observed during this inspection
At the
                        and occumented in this report are identified as violations or deviations,
conclusion of the inspection, the findings were discussed with those members
                        the large number of them reduces the margin of safety by placing unnecessary
of your staff identified in the enclosed inspection report.
                        demands on the operators.                                                                                                                               To restore this margin of safety, prompt correc-
Areas examined during the inspection are identified in the report.
                        tive action is appropriate. As discussed during the exit meeting following
Within
                        the inspection and subsequent telephone conversations with this office, we
these areas, the inspection consisted of selective examinations of procedures
                        understand that Florida Power Corporation will review the individual deft-
and representative records, interviews with personnel, and observation of
                        ciencies noted in this report and take prompt corrective action to resolve
activities in progress. No violations or deviations were identified.
                        them on a prioritized schedule. This review and corrective action will
Although numerous deficiencies were identified, the Emergency Operating
                        specifically address identification and elimination of potential programmatic
Procedures were found to be adequate for continued operation of the facility.
                        weaknesses.     In particular, the review and corrective action will assure
Whfin none 'of the individual deficiencies observed during this inspection
                        that Shift Operation Technical Advisors have the ability to perform assigned
and occumented in this report are identified as violations or deviations,
                        functions. In addition, we understand that the technical bases for differences
the large number of them reduces the margin of safety by placing unnecessary
                        between the Crystal River Abnonnal Transient Operating Guidelines and Emergency
demands on the operators.
                        Operating Procedures are not documented. Your corrective action should include
To restore this margin of safety, prompt correc-
                        establishing Pis documentation. As we have discussed, you will meet with us
tive action is appropriate.
                        in Atlanta on June 29,1988, at 1:00 p.m. to discuss your progress and schedule
As discussed during the exit meeting following
                        for completing this action.
the inspection and subsequent telephone conversations with this office, we
                        The enclosed inspection report documents additional conmittrents (see para-
understand that Florida Power Corporation will review the individual deft-
                        graphs 5, 6, and 8; Appendices B, C, and D) made by a licensee representative
ciencies noted in this report and take prompt corrective action to resolve
                        and discussed in the exit meeting. If your understanding of the commitments
them on a prioritized schedule.
                        described in this letter or the enclosed repurt differs from ours, please
This review and corrective action will
          esOeN8[36 sObfceprmptly.           s
specifically address identification and elimination of potential programmatic
          PDR           ADOCK 05000302
weaknesses.
          O                           DCD                                                                                                                                                                                         &
In particular, the review and corrective action will assure
that Shift Operation Technical Advisors have the ability to perform assigned
functions.
In addition, we understand that the technical bases for differences
between the Crystal River Abnonnal Transient Operating Guidelines and Emergency
Operating Procedures are not documented.
Your corrective action should include
establishing Pis documentation.
As we have discussed, you will meet with us
in Atlanta on June 29,1988, at 1:00 p.m. to discuss your progress and schedule
for completing this action.
The enclosed inspection report documents additional conmittrents (see para-
graphs 5, 6, and 8; Appendices B, C, and D) made by a licensee representative
and discussed in the exit meeting.
If your understanding of the commitments
described in this letter or the enclosed repurt differs from ours, please
esOeN8[36
sObfceprmptly.
s
PDR
ADOCK 05000302
&
O
DCD


  __ _______- _ ___ -                   ________ __ ___.             _   _ _ _ _ _ _         _ _ _ -
__ _______- _ ___ -
            -
________ __ ___.
                      '
_
                          .
_ _ _ _ _ _
_ _ _ -
'
-
.
-
-
                      .,
.,
                        Florida Power Corporation                                   2                         June 8, 1988
Florida Power Corporation
                        In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
2
                        Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
June 8, 1988
                        will be placed in the NRC Public Document Room.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
                        The responses directed by this letter and its enclosure are not subject to the
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                        clearance procedures of the Office of Management and Budget as required '                       'he
will be placed in the NRC Public Document Room.
                        Paperwork Reduction Act of 1980, . F'ub. L. No. 96-511.
The responses directed by this letter and its enclosure are not subject to the
                        Should you have any questions concerning this letter, please contact us.
clearance procedures of the Office of Management and Budget as required '
                                                                                      Sincerely,
'he
                                                                        (OrjgiggggyJ.ilelsonGrace)
Paperwork Reduction Act of 1980, . F'ub. L. No. 96-511.
                                                                                      Regional Administrator
Should you have any questions concerning this letter, please contact us.
                        Enclosure:
Sincerely,
                        NRC Inspection Report
(OrjgiggggyJ.ilelsonGrace)
                          No. 50-302/88-09
Regional Administrator
                        cc w/ encl:
Enclosure:
                        P. F. McKee, Director, Nuclear
NRC Inspection Report
                            Plant Operations
No. 50-302/88-09
                        E. C. Simpson, Director, Nuclear
cc w/ encl:
                            Site Support
P. F. McKee, Director, Nuclear
                        bec w/ encl:
Plant Operations
                        W. Regan, NRR
E. C. Simpson, Director, Nuclear
                        R. Gallo, RI
Site Support
                        C. Julian, RII
bec w/ encl:
                        G. Wright, RIII
W. Regan, NRR
                        J. Gagliardo, RIV
R. Gallo, RI
                        R. Zimerman, RV                           T
C. Julian, RII
                        DRS Technical Assistant                 hC
G. Wright, RIII
                        NRC Resident Inspector               s
J. Gagliardo, RIV
                        Document Control Desk                 )
R. Zimerman, RV
                        State of Florida                                           t/
T
                                                                    $ <1
DRS Technical Assistant
hC
NRC Resident Inspector
s
Document Control Desk
)
State of Florida
t/
$ <1
CJ iha :Itm
Ai
ed
f//88
3/l$/88
{p
[L [hfl8
4["N8
.
.
                          CJ iha :Itm                    Ai          ed
/0
                          f//88
                              /0                         3/l$/88    {p                [L [hfl8          4["N8
:
:
(
(

Latest revision as of 20:53, 10 December 2024

Forwards Insp Rept 50-302/88-09 on 880328-0408.No Violations or Deviations Noted.Numerous Deficiencies Identified. Emergency Operating Procedures Found to Be Adequate for Continued Operation of Facility
ML20155K163
Person / Time
Site: Crystal River 
Issue date: 06/08/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20155K168 List:
References
NUDOCS 8806210126
Download: ML20155K163 (2)


See also: IR 05000302/1988009

Text

,-

- __

_ - - - -

- - - - - - . - - _ _ . - . - - - - - - - - _ - - _ - - - _ _ _ _ _ - - _ - - - _ _ _ _ _ - - _ - - _ _ - - _ - - - - - - . _ - - - - -

-

- - - - - - _

'

..

,

,

.

June 8, 1988

Docket No. 50-302

License No. DPR-72

Florida Power Corporation

Mr. W. S. Wilgus

Vice President Nuclear Operations

ATTN: Manager, Nuclear Licensing

P. O. Box 219

Crystal River, FL 32629

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-302/88-09

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

L. Lawyer on March 28 - April 8,1988.

The inspection included a review of

Emergency Operating Procedures for your Crystal River facility.

At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. No violations or deviations were identified.

Although numerous deficiencies were identified, the Emergency Operating

Procedures were found to be adequate for continued operation of the facility.

Whfin none 'of the individual deficiencies observed during this inspection

and occumented in this report are identified as violations or deviations,

the large number of them reduces the margin of safety by placing unnecessary

demands on the operators.

To restore this margin of safety, prompt correc-

tive action is appropriate.

As discussed during the exit meeting following

the inspection and subsequent telephone conversations with this office, we

understand that Florida Power Corporation will review the individual deft-

ciencies noted in this report and take prompt corrective action to resolve

them on a prioritized schedule.

This review and corrective action will

specifically address identification and elimination of potential programmatic

weaknesses.

In particular, the review and corrective action will assure

that Shift Operation Technical Advisors have the ability to perform assigned

functions.

In addition, we understand that the technical bases for differences

between the Crystal River Abnonnal Transient Operating Guidelines and Emergency

Operating Procedures are not documented.

Your corrective action should include

establishing Pis documentation.

As we have discussed, you will meet with us

in Atlanta on June 29,1988, at 1:00 p.m. to discuss your progress and schedule

for completing this action.

The enclosed inspection report documents additional conmittrents (see para-

graphs 5, 6, and 8; Appendices B, C, and D) made by a licensee representative

and discussed in the exit meeting.

If your understanding of the commitments

described in this letter or the enclosed repurt differs from ours, please

esOeN8[36

sObfceprmptly.

s

PDR

ADOCK 05000302

&

O

DCD

__ _______- _ ___ -

________ __ ___.

_

_ _ _ _ _ _

_ _ _ -

'

-

.

-

.,

Florida Power Corporation

2

June 8, 1988

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required '

'he

Paperwork Reduction Act of 1980, . F'ub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(OrjgiggggyJ.ilelsonGrace)

Regional Administrator

Enclosure:

NRC Inspection Report

No. 50-302/88-09

cc w/ encl:

P. F. McKee, Director, Nuclear

Plant Operations

E. C. Simpson, Director, Nuclear

Site Support

bec w/ encl:

W. Regan, NRR

R. Gallo, RI

C. Julian, RII

G. Wright, RIII

J. Gagliardo, RIV

R. Zimerman, RV

T

DRS Technical Assistant

hC

NRC Resident Inspector

s

Document Control Desk

)

State of Florida

t/

$ <1

CJ iha :Itm

Ai

ed

f//88

3/l$/88

{p

[L [hfl8

4["N8

.

/0

(

L