ML20155K163
| ML20155K163 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/08/1988 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20155K168 | List: |
| References | |
| NUDOCS 8806210126 | |
| Download: ML20155K163 (2) | |
See also: IR 05000302/1988009
Text
,-
- __
_ - - - -
- - - - - - . - - _ _ . - . - - - - - - - - _ - - _ - - - _ _ _ _ _ - - _ - - - _ _ _ _ _ - - _ - - _ _ - - _ - - - - - - . _ - - - - -
-
- - - - - - _
'
..
,
,
.
June 8, 1988
Docket No. 50-302
License No. DPR-72
Florida Power Corporation
Mr. W. S. Wilgus
Vice President Nuclear Operations
ATTN: Manager, Nuclear Licensing
P. O. Box 219
Crystal River, FL 32629
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/88-09
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
L. Lawyer on March 28 - April 8,1988.
The inspection included a review of
Emergency Operating Procedures for your Crystal River facility.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress. No violations or deviations were identified.
Although numerous deficiencies were identified, the Emergency Operating
Procedures were found to be adequate for continued operation of the facility.
Whfin none 'of the individual deficiencies observed during this inspection
and occumented in this report are identified as violations or deviations,
the large number of them reduces the margin of safety by placing unnecessary
demands on the operators.
To restore this margin of safety, prompt correc-
tive action is appropriate.
As discussed during the exit meeting following
the inspection and subsequent telephone conversations with this office, we
understand that Florida Power Corporation will review the individual deft-
ciencies noted in this report and take prompt corrective action to resolve
them on a prioritized schedule.
This review and corrective action will
specifically address identification and elimination of potential programmatic
weaknesses.
In particular, the review and corrective action will assure
that Shift Operation Technical Advisors have the ability to perform assigned
functions.
In addition, we understand that the technical bases for differences
between the Crystal River Abnonnal Transient Operating Guidelines and Emergency
Operating Procedures are not documented.
Your corrective action should include
establishing Pis documentation.
As we have discussed, you will meet with us
in Atlanta on June 29,1988, at 1:00 p.m. to discuss your progress and schedule
for completing this action.
The enclosed inspection report documents additional conmittrents (see para-
graphs 5, 6, and 8; Appendices B, C, and D) made by a licensee representative
and discussed in the exit meeting.
If your understanding of the commitments
described in this letter or the enclosed repurt differs from ours, please
esOeN8[36
sObfceprmptly.
s
ADOCK 05000302
&
O
__ _______- _ ___ -
________ __ ___.
_
_ _ _ _ _ _
_ _ _ -
'
-
.
-
.,
Florida Power Corporation
2
June 8, 1988
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required '
'he
Paperwork Reduction Act of 1980, . F'ub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(OrjgiggggyJ.ilelsonGrace)
Regional Administrator
Enclosure:
NRC Inspection Report
No. 50-302/88-09
cc w/ encl:
P. F. McKee, Director, Nuclear
Plant Operations
E. C. Simpson, Director, Nuclear
Site Support
bec w/ encl:
W. Regan, NRR
R. Gallo, RI
C. Julian, RII
G. Wright, RIII
J. Gagliardo, RIV
R. Zimerman, RV
T
DRS Technical Assistant