ML20198E611: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:t}
{{#Wiki_filter:t}
        .
.
    '
W 04
                                            W 04  1965
'
  Duke Power Cctrpany
1965
gN: Mr. H. B. Tucker, Vice President
Duke Power Cctrpany
          Nuclear Production Department
gN: Mr. H. B. Tucker, Vice President
  422 South Church Street
Nuclear Production Department
  Charlotte, NC 28242
422 South Church Street
  Gentlemen:
Charlotte, NC 28242
  SUBJECT: REPORT NOS. 50-413/85-45 AND 50-414/85-45
Gentlemen:
  On Septenter 30 - October 4,1985, NRC inspected activities authorized by NRC
SUBJECT: REPORT NOS. 50-413/85-45 AND 50-414/85-45
  Operating License No. NPF-35 and Construction Permit No. CPPR-l'.7 for your
On Septenter 30 - October 4,1985, NRC inspected activities authorized by NRC
  Catawba facility.       At the conclusion of the inspection, the findings were
Operating License No. NPF-35 and Construction Permit No. CPPR-l'.7 for your
  discussed with those members of your staff identified in the enclosed inspection
Catawba facility.
  report.
At the conclusion of the inspection, the findings were
  Areas examined during the inspection are identified in the report. Within these
discussed with those members of your staff identified in the enclosed inspection
  areas, the inspecticn consisted of selective examinations of procedures and
report.
  representative records, interviews with personnel, and observation of activities
Areas examined during the inspection are identified in the report. Within these
  in progress.
areas, the inspecticn consisted of selective examinations of procedures and
  Within the scope of the inspection, no violations or deviations were identified.
representative records, interviews with personnel, and observation of activities
  Shculd you have any questiens ccncerning this letter, please centact us.
in progress.
                                              Sincercly,
Within the scope of the inspection, no violations or deviations were identified.
                                                                                        ,
Shculd you have any questiens ccncerning this letter, please centact us.
                                                  6   6
Sincercly,
                                              Virgil L. Brownice, Chief
,
                                              Reactor Pro.iects Branch 2
6
                                              Division of Reactor Projects
6
  Enclosure:
Virgil L. Brownice, Chief
  Inspection Peport Nos. 50-413/85-45
Reactor Pro.iects Branch 2
      and 50-414/85-45
Division of Reactor Projects
  cc w/ enc 1:
Enclosure:
Inspection Peport Nos. 50-413/85-45
and 50-414/85-45
cc w/ enc 1:
f.L. Dick,VicePresident-Construction
f.L. Dick,VicePresident-Construction
3 W. Hampton, Station Manager
3 W. Hampton, Station Manager
  bcc w/ enc 1:
bcc w/ enc 1:
4. Johnson, ELD
4. Johnson, ELD
J . N. Jabbour, NRR
J . N. Jabbour, NRR
                                        0511140115   851104
0511140115 851104
  Document Contrr>l Desk               pon Apocn 05000413
Document Contrr>l Desk
  State of south Carolina               o                     PDR
pon
Apocn 05000413
PDR
State of south Carolina
o
A RC Resident Inspector
A RC Resident Inspector
  RII              )n
0
                        0              [
[
                                        ljJ    f)     f
f)
                                                          (-
f
  h4C.             -- f            I
f
                                      y             )
I ljJ
                                                      1
)
                                                        8
(-
  JColey:bhg            ilake                    .
RII
                                    (Fierdt/ I /85                                 1\
)n
  10/3$85             ')/85
h4C.
                                                                                  ~.LEol
--
8
y
1
(Fierdt/ I /85
1\\
JColey:bhg
ilake
.
10/3$85
')/85
~.LEol
}}
}}

Latest revision as of 11:25, 10 December 2024

Forwards Insp Repts 50-413/85-45 & 50-414/85-45 on 850930-1004.No Violation or Deviation Noted
ML20198E611
Person / Time
Site: Catawba  
Issue date: 11/04/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20198E614 List:
References
NUDOCS 8511140115
Download: ML20198E611 (1)


See also: IR 05000413/1985045

Text

t}

.

W 04

'

1965

Duke Power Cctrpany

gN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/85-45 AND 50-414/85-45

On Septenter 30 - October 4,1985, NRC inspected activities authorized by NRC

Operating License No. NPF-35 and Construction Permit No. CPPR-l'.7 for your

Catawba facility.

At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed inspection

report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspecticn consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Shculd you have any questiens ccncerning this letter, please centact us.

Sincercly,

,

6

6

Virgil L. Brownice, Chief

Reactor Pro.iects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Peport Nos. 50-413/85-45

and 50-414/85-45

cc w/ enc 1:

f.L. Dick,VicePresident-Construction

3 W. Hampton, Station Manager

bcc w/ enc 1:

4. Johnson, ELD

J . N. Jabbour, NRR

0511140115 851104

Document Contrr>l Desk

pon

Apocn 05000413

PDR

State of south Carolina

o

A RC Resident Inspector

0

[

f)

f

f

I ljJ

)

(-

RII

)n

h4C.

--

8

y

1

(Fierdt/ I /85

1\\

JColey:bhg

ilake

.

10/3$85

')/85

~.LEol