ML20137B211: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:._ _     _
{{#Wiki_filter:._
    '
_
      .
_
        ,
'
  ..
.
    .
,
                                                                                                                              h
..
                                                  JAN 0 01986
.
          Docket No. 50-293                                                                                                 e
h
          Boston Edison Company M/C Nuclear
JAN 0 01986
          ATTN: Mr. William D. Harrington
Docket No. 50-293
                    Senior Vice President, Nuclear
e
          800 Boylston Street
Boston Edison Company M/C Nuclear
          Boston, Massachusetts 02199
ATTN: Mr. William D. Harrington
          Gentlemen:
Senior Vice President, Nuclear
          Subject:     Inspection No. 50-293/85-31
800 Boylston Street
          This refers to the routine safety inspection conducted by Dr. M. McBride of this
Boston, Massachusetts 02199
          office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,
Gentlemen:
          Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
Subject:
          to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and
Inspection No. 50-293/85-31
          other members of your staff periodically during the inspection and at the conclu-
This refers to the routine safety inspection conducted by Dr. M. McBride of this
            sion of the inspection.
office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,
          Areas examined during this inspection are described in the NRC Region I Inspection
Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
          Report which is enclosed with this letter. Within these areas, the inspection
to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and
          consisted of selective examinations of procedures and representative records, in-
other members of your staff periodically during the inspection and at the conclu-
            terviews with personnel, and observations by the inspector.
sion of the inspection.
          Within the scope of this inspection, no violations were identified. However,
Areas examined during this inspection are described in the NRC Region I Inspection
          numerous errors were found in the tagging and listing of the valves in the RHR
Report which is enclosed with this letter. Within these areas, the inspection
            system. While no valve position errors occurred and the tagging and listing errors
consisted of selective examinations of procedures and representative records, in-
          were of minor significance in that it is unlikely to directly affect plant safety,
terviews with personnel, and observations by the inspector.
          the continued existence of incorrect operating procedure information, especially
Within the scope of this inspection, no violations were identified. However,
            following completion of the Procedure Update Program, represents a problem. In
numerous errors were found in the tagging and listing of the valves in the RHR
            light of the apparent tight staffing in the operations department, we question why
system. While no valve position errors occurred and the tagging and listing errors
          other means have not been made available to correct such lingering problems. We
were of minor significance in that it is unlikely to directly affect plant safety,
          urge you to take action to ensure that operating information is accurate, and we
the continued existence of incorrect operating procedure information, especially
          will continue to review its accuracy in future inspections.
following completion of the Procedure Update Program, represents a problem.
          No r eply to this letter is required. Your cooperation with us in this matter
In
y          is appreciated.
light of the apparent tight staffing in the operations department, we question why
                                                        Sincerely,
other means have not been made available to correct such lingering problems. We
!                                                        Orit.iral31GL8d373
urge you to take action to ensure that operating information is accurate, and we
                                                        Edward C. Wenzinger, Chief
will continue to review its accuracy in future inspections.
No r eply to this letter is required. Your cooperation with us in this matter
is appreciated.
y
Sincerely,
Orit.iral31GL8d373
!
Edward C. Wenzinger, Chief
l
l
                                                        Projects Branch No. 3,
Projects Branch No. 3,
Division of Reactor Projects
'
'
                                                        Division of Reactor Projects
Enclosure: NRC Region I Inspection Report No. 50-293/85-31
            Enclosure: NRC Region I Inspection Report No. 50-293/85-31
8601150169 860106
          8601150169 860106
PDR
          PDR     ADOCK 05000293
ADOCK 05000293
,
,
          O                   PDR
O
                                        OFFICIAL RECORD COPY             IR PILGRIM 85-31 - 0001.0.0                                       '
PDR
OFFICIAL RECORD COPY
IR PILGRIM 85-31 - 0001.0.0
l
l
11/29/80
'
.
.
                                                                        11/29/80                                                            ,
,
,
L                                                               _ . _ .       _ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _         __.
,
L
_ . _ .
_ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _
__.


  **-
**
      ..
-
  .
..
            Boston Edison Company M/C Nuclear                     2                                         JAN 0 61986
.
            cc w/ enc 1:
Boston Edison Company M/C Nuclear
          ~A.   V. Mori21, Manager, Nuclear Management Services Department
2
            C. J. Mathis, Station Manager
JAN 0 61986
            Joanne Shotwell, Assistant Attorney General
cc w/ enc 1:
          -Paul Levy, Chairman, Department of Public Utilities
~A. V. Mori21, Manager, Nuclear Management Services Department
            W. J. Nolan, Chairman, Plymouth Board of Selectmen
C. J. Mathis, Station Manager
            Plymouth Civil Defense Director
Joanne Shotwell, Assistant Attorney General
            Senator Edward P. Kirby
-Paul Levy, Chairman, Department of Public Utilities
            Public Document Room (PDR)
W. J. Nolan, Chairman, Plymouth Board of Selectmen
            Local Public Document Room (LPDR)
Plymouth Civil Defense Director
            Nuclear Safety Information Center (NSIC)
Senator Edward P. Kirby
            NRC Resident Inspector
Public Document Room (PDR)
            Commonwealth of Massachuset.ts (2)
Local Public Document Room (LPDR)
            bec w/ enc 1:
Nuclear Safety Information Center (NSIC)
            Region I Docket Room (with concurrences)
NRC Resident Inspector
            Management Assistant, DRMA (w/o encl)
Commonwealth of Massachuset.ts (2)
            Section Chief, DRP
bec w/ enc 1:
          -W. Raymond, SRI, Vermont Yankee
Region I Docket Room (with concurrences)
            T. Shedlosky, SRI, Millstone 1&2
Management Assistant, DRMA (w/o encl)
            H. Eichenholz, SRI, Yankee
Section Chief, DRP
            P. Leech, LPM, NRR
-W. Raymond, SRI, Vermont Yankee
            R ):   P       RJ       P                 P
T. Shedlosky, SRI, Millstone 1&2
                [ ride /meo   Mripp             werlzircqr
H. Eichenholz, SRI, Yankee
        f  I/3/8b             kgh                   h
P. Leech, LPM, NRR
                                          0FFICIAL RECORD COPY                                           IR PILGRIM 85-31 - 0002.0.0
R ):
                                                                                                          11/29/80
P
?                                                                                                                                                         :
RJ
P
P
[ ride /meo
Mripp
werlzircqr
I/3/8b
kgh
h
f
0FFICIAL RECORD COPY
IR PILGRIM 85-31 - 0002.0.0
11/29/80
?
,
- , - -
,
,
                                - , - -      ,    ,e-..-   ,-.,e   , . , ~ , _ . - - . - - , - - - . - -         ,- - -
,e-..-
                                                                                                                                  - - - - , - - - . . - -
,-.,e
, . , ~ , _ . - - . - - , - - - . - -
,- -
-
- - - - , - -
- . . - -
}}
}}

Latest revision as of 01:20, 12 December 2024

Forwards Safety Insp Rept 50-293/85-31 on 851105-1206.No Violations Noted.Errors Found in Tagging & Listing of Valves in RHR Sys.Action to Ensure Operating Info Accurate Required
ML20137B211
Person / Time
Site: Pilgrim
Issue date: 01/06/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20137B216 List:
References
NUDOCS 8601150169
Download: ML20137B211 (2)


See also: IR 05000293/1985031

Text

._

_

_

'

.

,

..

.

h

JAN 0 01986

Docket No. 50-293

e

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection No. 50-293/85-31

This refers to the routine safety inspection conducted by Dr. M. McBride of this

office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and

other members of your staff periodically during the inspection and at the conclu-

sion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified. However,

numerous errors were found in the tagging and listing of the valves in the RHR

system. While no valve position errors occurred and the tagging and listing errors

were of minor significance in that it is unlikely to directly affect plant safety,

the continued existence of incorrect operating procedure information, especially

following completion of the Procedure Update Program, represents a problem.

In

light of the apparent tight staffing in the operations department, we question why

other means have not been made available to correct such lingering problems. We

urge you to take action to ensure that operating information is accurate, and we

will continue to review its accuracy in future inspections.

No r eply to this letter is required. Your cooperation with us in this matter

is appreciated.

y

Sincerely,

Orit.iral31GL8d373

!

Edward C. Wenzinger, Chief

l

Projects Branch No. 3,

Division of Reactor Projects

'

Enclosure: NRC Region I Inspection Report No. 50-293/85-31

8601150169 860106

PDR

ADOCK 05000293

,

O

PDR

OFFICIAL RECORD COPY

IR PILGRIM 85-31 - 0001.0.0

l

11/29/80

'

.

,

,

L

_ . _ .

_ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _

__.

-

..

.

Boston Edison Company M/C Nuclear

2

JAN 0 61986

cc w/ enc 1:

~A. V. Mori21, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

-Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachuset.ts (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

-W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

R ):

P

RJ

P

P

[ ride /meo

Mripp

werlzircqr

I/3/8b

kgh

h

f

0FFICIAL RECORD COPY

IR PILGRIM 85-31 - 0002.0.0

11/29/80

?

,

- , - -

,

,e-..-

,-.,e

, . , ~ , _ . - - . - - , - - - . - -

,- -

-

- - - - , - -

- . . - -