ML20137B211
| ML20137B211 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/06/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20137B216 | List: |
| References | |
| NUDOCS 8601150169 | |
| Download: ML20137B211 (2) | |
See also: IR 05000293/1985031
Text
._
_
_
'
.
,
..
.
h
JAN 0 01986
Docket No. 50-293
e
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/85-31
This refers to the routine safety inspection conducted by Dr. M. McBride of this
office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and
other members of your staff periodically during the inspection and at the conclu-
sion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were identified. However,
numerous errors were found in the tagging and listing of the valves in the RHR
system. While no valve position errors occurred and the tagging and listing errors
were of minor significance in that it is unlikely to directly affect plant safety,
the continued existence of incorrect operating procedure information, especially
following completion of the Procedure Update Program, represents a problem.
In
light of the apparent tight staffing in the operations department, we question why
other means have not been made available to correct such lingering problems. We
urge you to take action to ensure that operating information is accurate, and we
will continue to review its accuracy in future inspections.
No r eply to this letter is required. Your cooperation with us in this matter
is appreciated.
y
Sincerely,
Orit.iral31GL8d373
!
Edward C. Wenzinger, Chief
l
Projects Branch No. 3,
Division of Reactor Projects
'
Enclosure: NRC Region I Inspection Report No. 50-293/85-31
8601150169 860106
ADOCK 05000293
,
O
OFFICIAL RECORD COPY
IR PILGRIM 85-31 - 0001.0.0
l
11/29/80
'
.
,
,
L
_ . _ .
_ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _
__.
-
..
.
Boston Edison Company M/C Nuclear
2
JAN 0 61986
cc w/ enc 1:
~A. V. Mori21, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
-Paul Levy, Chairman, Department of Public Utilities
W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachuset.ts (2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
-W. Raymond, SRI, Vermont Yankee
T. Shedlosky, SRI, Millstone 1&2
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
R ):
P
RJ
P
P
[ ride /meo
Mripp
werlzircqr
I/3/8b
kgh
h
f
0FFICIAL RECORD COPY
IR PILGRIM 85-31 - 0002.0.0
11/29/80
?
,
- , - -
,
,e-..-
,-.,e
, . , ~ , _ . - - . - - , - - - . - -
,- -
-
- - - - , - -
- . . - -