ML20138M580: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:Jktla)
  .
.
                                    m mm                                 Jktla)
.
      Duke Power Company
m mm
    fTN: Mr.Nuclear
Duke Power Company
              H. B. Tucker,   Vice President
fTN: Mr. H. B. Tucker, Vice President
                      Production Department
Nuclear Production Department
      422 South Church Street
422 South Church Street
      Charlotte, NC 28242
Charlotte, NC 28242
      Gentlemen:
Gentlemen:
      SUBJECT: REPORT NOS. 50-269/85-31, 50-270/85-31, AND 50-287/85-31
SUBJECT: REPORT NOS. 50-269/85-31, 50-270/85-31, AND 50-287/85-31
      On September 23-27, 1985, NRC inspected activities authorized by NRC Operating
On September 23-27, 1985, NRC inspected activities authorized by NRC Operating
      License Nos. DPR-38, OPR-47, and DPR-55 for your Oconee facility. At the
License Nos. DPR-38, OPR-47, and DPR-55 for your Oconee facility.
      conclusion of the inspection, the findings were discussed with those members of
At the
      your staff identified in the enclosed inspection report.
conclusion of the inspection, the findings were discussed with those members of
      Areas examined during the inspection are identified in the report. Within these
your staff identified in the enclosed inspection report.
      areas, the inspection consisted of selective examinations of procedures and
Areas examined during the inspection are identified in the report. Within these
      representative records, interviews with personnel, and observation of activities
areas, the inspection consisted of selective examinations of procedures and
      in progress.
representative records, interviews with personnel, and observation of activities
      Within the scope of the inspection, no violations or deviations were identified.
in progress.
      Your attention is invited to unresolved items identified in the inspection
Within the scope of the inspection, no violations or deviations were identified.
      report. These matters will be pursued during future inspections.
Your attention is invited to unresolved items identified in the inspection
      Should you have any questions cuncerning this letter, please contact us.
report. These matters will be pursued during future inspections.
                                                Sincerely,
Should you have any questions cuncerning this letter, please contact us.
                                                Virgil L. Brownlee, Chief
Sincerely,
                                                Reactor Projects Branch 2
Virgil L. Brownlee, Chief
                                                Division of Reactor Projects
Reactor Projects Branch 2
      Enclosure:
Division of Reactor Projects
      Inspection Report Nos. 50-269/85-31,
Enclosure:
        50-270/85-31, and 50-287/85-31
Inspection Report Nos. 50-269/85-31,
      gc w/ enc 1:
50-270/85-31, and 50-287/85-31
    vH. S. Tuckman, Station Manager
gc w/ enc 1:
        c w/ encl:
vH. S. Tuckman, Station Manager
        C Resident Inspector           8511040127 851017
c w/ encl:
      . Nicolaras, NRR                   DR  ADOCK 05      29
C Resident Inspector
                                        O
8511040127 851017
      Document Control Desk
DR
,    State of South Carolina
ADOCK 05
      J. J. Blake, RII
29
      RII                 RII                               '
. Nicolaras, NRR
      JLe han:bhg                             rdt          o
O
                                                            N
Document Control Desk
      10/It/85            FJap[e10/[/85/ll/85
State of South Carolina
                                                                                      miV
,
J. J. Blake, RII
RII
RII
'
N
JLe han:bhg
FJap[e10/[/85/ll/85
rdt
o
10/It/85
miV
}}
}}

Latest revision as of 18:43, 11 December 2024

Forwards Insp Repts 50-269/85-31,50-270/85-31 & 50-287/85-31 on 850923-27.No Violation Noted
ML20138M580
Person / Time
Site: Oconee  
Issue date: 10/17/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20138M584 List:
References
NUDOCS 8511040127
Download: ML20138M580 (1)


See also: IR 05000269/1985031

Text

Jktla)

.

.

m mm

Duke Power Company

fTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-269/85-31, 50-270/85-31, AND 50-287/85-31

On September 23-27, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-38, OPR-47, and DPR-55 for your Oconee facility.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions cuncerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-269/85-31,

50-270/85-31, and 50-287/85-31

gc w/ enc 1:

vH. S. Tuckman, Station Manager

c w/ encl:

C Resident Inspector

8511040127 851017

DR

ADOCK 05

29

. Nicolaras, NRR

O

Document Control Desk

State of South Carolina

,

J. J. Blake, RII

RII

RII

'

N

JLe han:bhg

FJap[e10/[/85/ll/85

rdt

o

10/It/85

miV