ML20138M580

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-269/85-31,50-270/85-31 & 50-287/85-31 on 850923-27.No Violation Noted
ML20138M580
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/17/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20138M584 List:
References
NUDOCS 8511040127
Download: ML20138M580 (1)


See also: IR 05000269/1985031

Text

.

.

m mm Jktla)

Duke Power Company

fTN: Mr.Nuclear

H. B. Tucker, Vice President

Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-269/85-31, 50-270/85-31, AND 50-287/85-31

On September 23-27, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-38, OPR-47, and DPR-55 for your Oconee facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions cuncerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-269/85-31,

50-270/85-31, and 50-287/85-31

gc w/ enc 1:

vH. S. Tuckman, Station Manager

c w/ encl:

C Resident Inspector 8511040127 851017

. Nicolaras, NRR DR ADOCK 05 29

O

Document Control Desk

, State of South Carolina

J. J. Blake, RII

RII RII '

JLe han:bhg rdt o

N

10/It/85 FJap[e10/[/85/ll/85

miV