ML20140F616: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:r
{{#Wiki_filter:r
    .                                                                                 .
.
  '
.
                                          JUN 131985
'
      Carolina Power and Light Company
JUN 131985
      ATTN: Mr. E. E. Utley
Carolina Power and Light Company
              Senior Executive Vice President
ATTN: Mr. E. E. Utley
              Power Supply and Engineering
Senior Executive Vice President
                and Construction
Power Supply and Engineering
      411 Fayetteville Street
and Construction
      Raleigh, NC 27602                                         <.
411 Fayetteville Street
      Gentlemen:
Raleigh, NC 27602
      SUBJECT:     REPORT NOS. 50/325/85-11 AND 50-324/85-11
<.
      On May 1-31, 1985, NRC inspected activities authorized by NRC Operating License
Gentlemen:
      Nos. OPR-17 and CPR-62 for your Brunswick facility. At the conclusion of the
SUBJECT:
      inspection, the findings were discussed with those members of your staff
REPORT NOS. 50/325/85-11 AND 50-324/85-11
      identified in the enclosed inspection report.
On May 1-31, 1985, NRC inspected activities authorized by NRC Operating License
      Areas examined during the inspection are identified in the report. Within these
Nos. OPR-17 and CPR-62 for your Brunswick facility. At the conclusion of the
      areas, the inspection consisted of selective examinations of procedures and
inspection, the findings were discussed with those members of your staff
      representative records, interviews with personnel, and observation of activities
identified in the enclosed inspection report.
      in progress.
Areas examined during the inspection are identified in the report. Within these
      Within the scope of the inspection, no violations or deviations were identified.
areas, the inspection consisted of selective examinations of procedures and
      Should you have any questions concerning this letter, please contact us.
representative records, interviews with personnel, and observation of activities
                                                Sincerely,
in progress.
                                                  ll b h \) W
Within the scope of the inspection, no violations or deviations were identified.
                                                David M. Vorrelli, Chief
Should you have any questions concerning this letter, please contact us.
                                                Reactor Projects Branch 1
Sincerely,
                                                Division of Reactor Projects
ll b h \\) W
      Enclosure:
David M. Vorrelli, Chief
      Inspection Report Nos. 50/325/85-11
Reactor Projects Branch 1
        and 50-324/85-11
Division of Reactor Projects
                                                                                        .
Enclosure:
      cc w/ enc 1:
Inspection Report Nos. 50/325/85-11
      P. W. Howe, Vice President
and 50-324/85-11
        Brunswick Nuclear Project
.
      C. R. Dietz, Plant General Manager
cc w/ enc 1:
      bec w/ enc 1:
P. W. Howe, Vice President
      NRC Resident Inspector
Brunswick Nuclear Project
      Document Control Desk
C. R. Dietz, Plant General Manager
      State of North Carolina
bec w/ enc 1:
      RII             RI   .
NRC Resident Inspector
      Akabn:km         PFred ekson
Document Control Desk
      06/p/85         06/(3/85
State of North Carolina
                                                                                M
RII
            0507120143 850613                                                     (
RI
              DR ADOCK 050 34                                                 -g
.
Akabn:km
PFred ekson
06/p/85
06/(3/85
M
0507120143 850613
(
DR
ADOCK 050
34
-g
}}
}}

Latest revision as of 16:31, 11 December 2024

Forwards Insp Repts 50-324/85-11 & 50-325/85-11 on 850501-31.No Violation or Deviation Noted
ML20140F616
Person / Time
Site: Brunswick  
Issue date: 06/13/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20140F622 List:
References
NUDOCS 8507120143
Download: ML20140F616 (1)


See also: IR 05000324/1985011

Text

r

.

.

'

JUN 131985

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

<.

Gentlemen:

SUBJECT:

REPORT NOS. 50/325/85-11 AND 50-324/85-11

On May 1-31, 1985, NRC inspected activities authorized by NRC Operating License

Nos. OPR-17 and CPR-62 for your Brunswick facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ll b h \\) W

David M. Vorrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50/325/85-11

and 50-324/85-11

.

cc w/ enc 1:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

State of North Carolina

RII

RI

.

Akabn:km

PFred ekson

06/p/85

06/(3/85

M

0507120143 850613

(

DR

ADOCK 050

34

-g