ML20140F616
| ML20140F616 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/13/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20140F622 | List: |
| References | |
| NUDOCS 8507120143 | |
| Download: ML20140F616 (1) | |
See also: IR 05000324/1985011
Text
r
.
.
'
JUN 131985
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
<.
Gentlemen:
SUBJECT:
REPORT NOS. 50/325/85-11 AND 50-324/85-11
On May 1-31, 1985, NRC inspected activities authorized by NRC Operating License
Nos. OPR-17 and CPR-62 for your Brunswick facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ll b h \\) W
David M. Vorrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50/325/85-11
and 50-324/85-11
.
cc w/ enc 1:
P. W. Howe, Vice President
Brunswick Nuclear Project
C. R. Dietz, Plant General Manager
bec w/ enc 1:
NRC Resident Inspector
Document Control Desk
State of North Carolina
RII
RI
.
Akabn:km
PFred ekson
06/p/85
06/(3/85
M
0507120143 850613
(
DR
ADOCK 050
34
-g