ML20148A900: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.-   --     -     . . - . . _ _ .     -   .- -               _- .. . -     .     --
{{#Wiki_filter:.-
                                                                                                          ,
--
  ->
-
    &                                                                MAR 111988
. . - . . _ _ .
            DOCKrjT/ LICENSE NOS.:   50-317/DPR-53-
-
                                      50- 318/0PR-69
.- -
            Baltimore Gas and Electric Company
_- .. .
            ATTN: Mr. J. A. Tiernan
-
                      Vice President, Nuclear Energy
.
            Pcot Office Box 1475
--
            Baltimore, Maryland 21203
,
            Gentlemen:
- >
            Subject: Combined Inspection Report Nos. 50-317/88-01 and 50-318/88-01
MAR 111988
            This. transmits the January 19-29, 1988 Integrated Performance Assessment (IPA)
&
            inspection findings at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland.'
DOCKrjT/ LICENSE NOS.:
            These findings are based on our observation of activities, interviews, and
50-317/DPR-53-
            document reviews, which were discussed with you on January 29, 1988, at the
50- 318/0PR-69
            conclusion of the inspection.
Baltimore Gas and Electric Company
            The IPA inspection findings indicate that your recent initiatives have been
ATTN: Mr. J. A. Tiernan
            responsive to those issues raised by NRC in the last Systematic Assessment of
Vice President, Nuclear Energy
            Licensee Performance (SALP) report.           In particular, the inspection team noted
Pcot Office Box 1475
            the positive actions in progress to improve interfaces and communications
Baltimore, Maryland 21203
            between departments.       However, the nature and complexity of the issues dis-
Gentlemen:
            cussed in the last SALP report, as further amplified by the . findings and obser-
Subject: Combined Inspection Report Nos. 50-317/88-01 and 50-318/88-01
            vations daring this inspection, indicate that continuing managet ent attention
This. transmits the January 19-29, 1988 Integrated Performance Assessment (IPA)
            at all levels will be required to achieve sustained overall improved perform-
inspection findings at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland.'
            ance levels.
These findings are based on our observation of activities, interviews, and
document reviews, which were discussed with you on January 29, 1988, at the
conclusion of the inspection.
The IPA inspection findings indicate that your recent initiatives have been
responsive to those issues raised by NRC in the last Systematic Assessment of
Licensee Performance (SALP) report.
In particular, the inspection team noted
the positive actions in progress to improve interfaces and communications
between departments.
However, the nature and complexity of the issues dis-
cussed in the last SALP report, as further amplified by the . findings and obser-
vations daring this inspection, indicate that continuing managet ent attention
at all levels will be required to achieve sustained overall improved perform-
ance levels.
This inspection reviewed a number of functional areas with primary emphasis on
2
2
            This inspection reviewed a number of functional areas with primary emphasis on                  !
the interfaces between departments.
            the interfaces between departments. The team found that. the interfaces were
The team found that. the interfaces were
            generally functioning well, communications on emerging problems and the
generally functioning well, communications on emerging problems and the
            coordination of daily activities were also generally good.               Plant operators
coordination of daily activities were also generally good.
            were found to be knowledgeable and professional. Several recent initiatives on
Plant operators
            your part appear promising including the. Safety System Functional Inspection
were found to be knowledgeable and professional. Several recent initiatives on
            and the follow-up activities associated with             it.   Plant safety overview
your part appear promising including the. Safety System Functional Inspection
            functions provided by the Onsite and Offsite Safety Review Committees were also
and the follow-up activities associated with
            found to be improving, as the result of recent initiatives. The team spent a
it.
            portion of its time looking at the management structure of your organization.
Plant safety overview
            While there were only limited findings in this area, the information did assist
functions provided by the Onsite and Offsite Safety Review Committees were also
            the   team   in understanding your organization and we have included our                       I
found to be improving, as the result of recent initiatives.
            observations as Attachment 2 to the Inspection Report.                                           j
The team spent a
                                            OFFICIAL RECORD COPY     CIR CC 88-01 - 0001.0.0
portion of its time looking at the management structure of your organization.
                                                                      03/12/88
While there were only limited findings in this area, the information did assist
                                                                                              / 84[
the
                                                                                              _
team
        880321092 880311
in understanding your organization and we have included our
        PDR   ADOCK0500g7          ,                                                             jf
observations as Attachment 2 to the Inspection Report.
        0
j
  ,   +
OFFICIAL RECORD COPY
CIR CC 88-01 - 0001.0.0
03/12/88
880321092 880311
/ 84[
_
ADOCK0500g7
jf
PDR
,
0
4
,
+


                                                                                        _ _.
_ _.
i   i
i
  "
i
      Baltimore Gas and Electric Company         2
"
  .
Baltimore Gas and Electric Company
      The team was concerned that the key role of the System Engineers was not yet
2
      fully developed. It appeared that some of the issues ;dentified in the
.
      Engineering area, such as, inaccuracies in Salt Water System surveillance
The team was concerned that the key role of the System Engineers was not yet
      testing, could have been identified by a strong System Engineer function.
fully developed.
      Routine maintenance activities appeared to be satisfactory but more ettention
It appeared that some of the issues ;dentified in the
      to detail was needed in the troubleshooting and post-maintenance testing areas.
Engineering area, such as, inaccuracies in Salt Water System surveillance
      One violation was identified in the surveillance area involving temporary
testing, could have been identified by a strong System Engineer function.
      changes to procedures and the lack of required reviews. Housekeeping including
Routine maintenance activities appeared to be satisfactory but more ettention
      cleanliness and plant material conditions was conddared to be poor in several
to detail was needed in the troubleshooting and post-maintenance testing areas.
      areas. The strengths and weaknesses observed during this inspection are listed
One violation was identified in the surveillance area involving temporary
      in Appendices B and C respectively.         As a part of your response to this
changes to procedures and the lack of required reviews. Housekeeping including
      inspection, we request that you reply in writing to the wea!.nesses identified
cleanliness and plant material conditions was conddared to be poor in several
      in Appendix C.
areas.
      The apparent violation of NRC requirements is cited in Appendix A and categor-
The strengths and weaknesses observed during this inspection are listed
      ized under the NRC Enforcement Policy, 10 CFR Part 2, Appendix C. A reply is
in Appendices B and C respectively.
      required in accordance with Appendix A. The requirement that you reply is
As a part of your response to this
      exempt from clearance by the Office of management and Budget under the
inspection, we request that you reply in writing to the wea!.nesses identified
      Paperwork Reduction Act of 1980, PL 96-511.
in Appendix C.
      Your cooperation with us is appreciated.
The apparent violation of NRC requirements is cited in Appendix A and categor-
                                                  Sincerely,
ized under the NRC Enforcement Policy, 10 CFR Part 2, Appendix C.
                                                ggiral st;n: d E72
A reply is
                                                  William F. Kane, Director
required in accordance with Appendix A.
                                                  Division of Reactor Projects
The requirement that you reply is
      Encl o<.u re s :
exempt from clearance by the Office of management and Budget under the
      1.     Appendix A, Notice of Violation
Paperwork Reduction Act of 1980, PL 96-511.
      2.     Appendix B, Licensee Strengths
Your cooperation with us is appreciated.
      3.     Appendix C, Licensee Weaknesses
Sincerely,
      4.     Combined NRC Region 1 Inspection Report Nos. 50-317/88-01 and 50-318/88-01
ggiral st;n: d E72
      cc w/encls:
William F. Kane, Director
      M. Bowman, General Supervisor, Technical Services Engineering
Division of Reactor Projects
      T. Magette, Administrator, Nuclear Evaluations                                         '
Encl o<.u re s :
      Public Document Room (LPOR)                                                           l
1.
      Local Public Document Room (LPDR)                                                     l'
Appendix A, Notice of Violation
      Nuclear Safety Information Center (NSIC)
2.
      NRC Resident Inspector
Appendix B, Licensee Strengths
      State of Maryland (2)
3.
                                                                                              l
Appendix C, Licensee Weaknesses
                                                                                              l
4.
                                  OFFICIAL RECORD COPY       CIR CC 88-01 - 0002.0.0
Combined NRC Region 1 Inspection Report Nos. 50-317/88-01 and 50-318/88-01
                                                              03/11/88
cc w/encls:
                                                                                              l
M. Bowman, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluations
'
Public Document Room (LPOR)
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
OFFICIAL RECORD COPY
CIR CC 88-01 - 0002.0.0
03/11/88


          .. _ _ . _ _._.                 ._.. _ __ . . _ . . . . -
.. _ _ . _ _._.
                                                                                              . _ . .                 . .     ... .... .                 _ . _             . . _ _ . . ._ __ ._
._.. _ __ . . _ . . . .
        .       i
. _ . .
          '
.
                          ' Baltimore Gas and Electric Company                                           3
.
                                                                                                                                      g y yg.
... .... .
          .
_ . _
                          bcc'w/encls:
. . _ _ . . ._ __ ._
                            Region I Docket Room (with concurrences)
-
                          M. Perkins, Management Assistant, ORMA (w/o encis)
.
                              .
i
                            L. Tripp, Section Chief, DRP
'
.                          D. Limroth, Project Engineer, DRP
' Baltimore Gas and Electric Company
i;                       . T. Kenny, SRI.- Salem
3
                            S. McNeil, LPM. NRR
g y yg.
                            R. Bores, Technical Assistant, DRSS
.
,
bcc'w/encls:
Region I Docket Room (with concurrences)
M. Perkins, Management Assistant, ORMA (w/o encis)
.
L. Tripp, Section Chief, DRP
D. Limroth, Project Engineer, DRP
.
i;
. T. Kenny, SRI.- Salem
S. McNeil, LPM. NRR
R. Bores, Technical Assistant, DRSS
,
9
9
                                                                                                                                                                                                                      !
!
't
't
                                                                                                                                                                                                                      l
I
                                                                                      '
'
                                        I
s
                                      s                                            )                                                     .
)
.
;
;
                                          P                                 R         P               df:DRP                                     31%/   $                                                          !
P
                            N         den /mjd                             L         p               t
R
                                                                                                          JWiggins
P
                            3/ll/88                                         3/l[/88                                                               3/II/88
df:DRP
                                                                                                          3/f/88
31 $
                                                                                      0FFICIAL RECORD COPY               CIR CC 88-01 - 0003.0.0
JWiggins
                                                                                                                          03/11/88
%/
N
den /mjd
L
p
t
3/ll/88
3/l[/88
3/f/88
3/II/88
0FFICIAL RECORD COPY
CIR CC 88-01 - 0003.0.0
03/11/88
,
,
s
s
!
!
  - - -           --         , - . .                               s . w~,   w,,-.     r,-, - - - . .     . - - - - .
- - -
                                                                                                                            # _._1         g m ,     y~.w       ,.,,,.y---e   y.y     -m-a   rw%,--, - , , y e, ,
--
, - . .
s
.
w~,
w,,-.
r,-,
- - - . .
. - - - - .
#
_._1
g m ,
y~.w
,.,,,.y---e
y.y
-m-a
rw%,--, - , , y e, ,
}}
}}

Latest revision as of 13:29, 11 December 2024

Forwards Integrated Performance Assessment Insp Repts 50-317/88-01 & 50-318/88-01 on 880119-29 & Notice of Violation.Expresses Concern That Key Role of Sys Engineers Not Yet Fully Developed
ML20148A900
Person / Time
Site: Calvert Cliffs  
Issue date: 03/11/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20148A904 List:
References
NUDOCS 8803210232
Download: ML20148A900 (3)


See also: IR 05000317/1988001

Text

.-

--

-

. . - . . _ _ .

-

.- -

_- .. .

-

.

--

,

- >

MAR 111988

&

DOCKrjT/ LICENSE NOS.:

50-317/DPR-53-

50- 318/0PR-69

Baltimore Gas and Electric Company

ATTN: Mr. J. A. Tiernan

Vice President, Nuclear Energy

Pcot Office Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject: Combined Inspection Report Nos. 50-317/88-01 and 50-318/88-01

This. transmits the January 19-29, 1988 Integrated Performance Assessment (IPA)

inspection findings at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland.'

These findings are based on our observation of activities, interviews, and

document reviews, which were discussed with you on January 29, 1988, at the

conclusion of the inspection.

The IPA inspection findings indicate that your recent initiatives have been

responsive to those issues raised by NRC in the last Systematic Assessment of

Licensee Performance (SALP) report.

In particular, the inspection team noted

the positive actions in progress to improve interfaces and communications

between departments.

However, the nature and complexity of the issues dis-

cussed in the last SALP report, as further amplified by the . findings and obser-

vations daring this inspection, indicate that continuing managet ent attention

at all levels will be required to achieve sustained overall improved perform-

ance levels.

This inspection reviewed a number of functional areas with primary emphasis on

2

the interfaces between departments.

The team found that. the interfaces were

generally functioning well, communications on emerging problems and the

coordination of daily activities were also generally good.

Plant operators

were found to be knowledgeable and professional. Several recent initiatives on

your part appear promising including the. Safety System Functional Inspection

and the follow-up activities associated with

it.

Plant safety overview

functions provided by the Onsite and Offsite Safety Review Committees were also

found to be improving, as the result of recent initiatives.

The team spent a

portion of its time looking at the management structure of your organization.

While there were only limited findings in this area, the information did assist

the

team

in understanding your organization and we have included our

observations as Attachment 2 to the Inspection Report.

j

OFFICIAL RECORD COPY

CIR CC 88-01 - 0001.0.0

03/12/88

880321092 880311

/ 84[

_

ADOCK0500g7

jf

PDR

,

0

4

,

+

_ _.

i

i

"

Baltimore Gas and Electric Company

2

.

The team was concerned that the key role of the System Engineers was not yet

fully developed.

It appeared that some of the issues ;dentified in the

Engineering area, such as, inaccuracies in Salt Water System surveillance

testing, could have been identified by a strong System Engineer function.

Routine maintenance activities appeared to be satisfactory but more ettention

to detail was needed in the troubleshooting and post-maintenance testing areas.

One violation was identified in the surveillance area involving temporary

changes to procedures and the lack of required reviews. Housekeeping including

cleanliness and plant material conditions was conddared to be poor in several

areas.

The strengths and weaknesses observed during this inspection are listed

in Appendices B and C respectively.

As a part of your response to this

inspection, we request that you reply in writing to the wea!.nesses identified

in Appendix C.

The apparent violation of NRC requirements is cited in Appendix A and categor-

ized under the NRC Enforcement Policy, 10 CFR Part 2, Appendix C.

A reply is

required in accordance with Appendix A.

The requirement that you reply is

exempt from clearance by the Office of management and Budget under the

Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us is appreciated.

Sincerely,

ggiral st;n: d E72

William F. Kane, Director

Division of Reactor Projects

Encl o<.u re s :

1.

Appendix A, Notice of Violation

2.

Appendix B, Licensee Strengths

3.

Appendix C, Licensee Weaknesses

4.

Combined NRC Region 1 Inspection Report Nos. 50-317/88-01 and 50-318/88-01

cc w/encls:

M. Bowman, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

'

Public Document Room (LPOR)

Local Public Document Room (LPDR)

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

OFFICIAL RECORD COPY

CIR CC 88-01 - 0002.0.0

03/11/88

.. _ _ . _ _._.

._.. _ __ . . _ . . . .

. _ . .

.

.

... .... .

_ . _

. . _ _ . . ._ __ ._

-

.

i

'

' Baltimore Gas and Electric Company

3

g y yg.

.

bcc'w/encls:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, ORMA (w/o encis)

.

L. Tripp, Section Chief, DRP

D. Limroth, Project Engineer, DRP

.

i;

. T. Kenny, SRI.- Salem

S. McNeil, LPM. NRR

R. Bores, Technical Assistant, DRSS

,

9

!

't

I

'

s

)

.

P

R

P

df:DRP

31 $

JWiggins

%/

N

den /mjd

L

p

t

3/ll/88

3/l[/88

3/f/88

3/II/88

0FFICIAL RECORD COPY

CIR CC 88-01 - 0003.0.0

03/11/88

,

s

!

- - -

--

, - . .

s

.

w~,

w,,-.

r,-,

- - - . .

. - - - - .

_._1

g m ,

y~.w

,.,,,.y---e

y.y

-m-a

rw%,--, - , , y e, ,