{{#Wiki_filter:
{{#Wiki_filter:._ _    _
    '
      .
        ,
  ..
    .
                                                                                                                              h
                                                  JAN 0 01986
          Docket No. 50-293                                                                                                e
          Boston Edison Company M/C Nuclear
          ATTN: Mr. William D. Harrington
                    Senior Vice President, Nuclear
          800 Boylston Street
          Boston, Massachusetts 02199
          Gentlemen:
          Subject:    Inspection No. 50-293/85-31
          This refers to the routine safety inspection conducted by Dr. M. McBride of this
          office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,
          Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and
          to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and
          other members of your staff periodically during the inspection and at the conclu-
            sion of the inspection.
          Areas examined during this inspection are described in the NRC Region I Inspection
          Report which is enclosed with this letter. Within these areas, the inspection
          consisted of selective examinations of procedures and representative records, in-
            terviews with personnel, and observations by the inspector.
          Within the scope of this inspection, no violations were identified. However,
          numerous errors were found in the tagging and listing of the valves in the RHR
            system. While no valve position errors occurred and the tagging and listing errors
          were of minor significance in that it is unlikely to directly affect plant safety,
          the continued existence of incorrect operating procedure information, especially
            following completion of the Procedure Update Program, represents a problem. In
            light of the apparent tight staffing in the operations department, we question why
          other means have not been made available to correct such lingering problems. We
          urge you to take action to ensure that operating information is accurate, and we
          will continue to review its accuracy in future inspections.
          No r eply to this letter is required. Your cooperation with us in this matter
y          is appreciated.
                                                        Sincerely,
!                                                        Orit.iral31GL8d373
                                                        Edward C. Wenzinger, Chief
l
                                                        Projects Branch No. 3,
'
                                                        Division of Reactor Projects
            Enclosure: NRC Region I Inspection Report No. 50-293/85-31
          8601150169 860106
          PDR    ADOCK 05000293
,
          O                    PDR
                                        OFFICIAL RECORD COPY            IR PILGRIM 85-31 - 0001.0.0                                      '
l
.
                                                                        11/29/80                                                            ,
,
L                                                                _ . _ .      _ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _        __.
 
  **-
      ..
  .
            Boston Edison Company M/C Nuclear                    2                                          JAN 0 61986
            cc w/ enc 1:
          ~A.    V. Mori21, Manager, Nuclear Management Services Department
            C. J. Mathis, Station Manager
            Joanne Shotwell, Assistant Attorney General
          -Paul Levy, Chairman, Department of Public Utilities
            W. J. Nolan, Chairman, Plymouth Board of Selectmen
            Plymouth Civil Defense Director
            Senator Edward P. Kirby
            Public Document Room (PDR)
            Local Public Document Room (LPDR)
            Nuclear Safety Information Center (NSIC)
            NRC Resident Inspector
            Commonwealth of Massachuset.ts (2)
            bec w/ enc 1:
            Region I Docket Room (with concurrences)
            Management Assistant, DRMA (w/o encl)
            Section Chief, DRP
          -W. Raymond, SRI, Vermont Yankee
            T. Shedlosky, SRI, Millstone 1&2
            H. Eichenholz, SRI, Yankee
            P. Leech, LPM, NRR
            R  ):    P        RJ        P                P
                [ ride /meo  Mripp            werlzircqr
        f  I/3/8b            kgh                    h
                                          0FFICIAL RECORD COPY                                            IR PILGRIM 85-31 - 0002.0.0
                                                                                                          11/29/80
?                                                                                                                                                        :
,
                                - , - -      ,    ,e-..-  ,-.,e  , . , ~ , _ . - - . - - , - - - . - -          ,- -  -
                                                                                                                                  - - - - , - - - . . - -
}}
}}

Revision as of 01:50, 1 July 2020

Forwards Safety Insp Rept 50-293/85-31 on 851105-1206.No Violations Noted.Errors Found in Tagging & Listing of Valves in RHR Sys.Action to Ensure Operating Info Accurate Required
ML20137B211
Person / Time
Site: Pilgrim
Issue date: 01/06/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20137B216 List:
References
NUDOCS 8601150169
Download: ML20137B211 (2)


See also: IR 05000293/1985031

Text

._ _ _

'

.

,

..

.

h

JAN 0 01986

Docket No. 50-293 e

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/85-31

This refers to the routine safety inspection conducted by Dr. M. McBride of this

office on November 5, 1985 to December 6, 1985 at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Dr. M. McBride with Mr. C. Mathis and

other members of your staff periodically during the inspection and at the conclu-

sion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified. However,

numerous errors were found in the tagging and listing of the valves in the RHR

system. While no valve position errors occurred and the tagging and listing errors

were of minor significance in that it is unlikely to directly affect plant safety,

the continued existence of incorrect operating procedure information, especially

following completion of the Procedure Update Program, represents a problem. In

light of the apparent tight staffing in the operations department, we question why

other means have not been made available to correct such lingering problems. We

urge you to take action to ensure that operating information is accurate, and we

will continue to review its accuracy in future inspections.

No r eply to this letter is required. Your cooperation with us in this matter

y is appreciated.

Sincerely,

! Orit.iral31GL8d373

Edward C. Wenzinger, Chief

l

Projects Branch No. 3,

'

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-293/85-31

8601150169 860106

PDR ADOCK 05000293

,

O PDR

OFFICIAL RECORD COPY IR PILGRIM 85-31 - 0001.0.0 '

l

.

11/29/80 ,

,

L _ . _ . _ _ _ _ . _ _ _ . . _ _ _ _ _ . _ _ _ _ _ _ _ __.

    • -

..

.

Boston Edison Company M/C Nuclear 2 JAN 0 61986

cc w/ enc 1:

~A. V. Mori21, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

-Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachuset.ts (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

-W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

R ): P RJ P P

[ ride /meo Mripp werlzircqr

f I/3/8b kgh h

0FFICIAL RECORD COPY IR PILGRIM 85-31 - 0002.0.0

11/29/80

?  :

,