-f' Cp&L Carolina Power & Light ce.spany h | |||
Carolina Power & Light ce .spany | P. O. Box 101, New Hill,-N. C. | ||
P. O. Box 101, New Hill,-N. C. | 27562 9@k (d | ||
March 29, 1983 1 | |||
1 | 9. | ||
gv | |||
.e Mr. James P. O'Reilly NRC-49 Pp United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100) | |||
United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100) | Atlanta, Georgia-30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63 | ||
Atlanta, Georgia- 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed. | Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed. | ||
If you have any questions regarding this matter, please do not hesitate to contact me. | If you have any questions regarding this matter, please do not hesitate to contact me. | ||
Yours very truly, g W : =& | Yours very truly, g W : =& | ||
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc: | R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc: | ||
Mr. G. Maxwell (NRC-SHNPP) | |||
A | .Mr. V. Stello (NRC) | ||
N A | |||
sho4osoa d 85o329 T i | |||
$ku_ | |||
^ | |||
C | |||
:N a | :N a | ||
i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f | i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f | ||
i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s | i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s | ||
THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES. | THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES. | ||
Reportable Under 10CFR50.55(e) J 4 | |||
2 | 2 | ||
'I s | |||
+, ' ' | |||
p 4 | p 4 | ||
g +. - | g | ||
+. - | |||
,-.m-y | |||
+.a e | |||
g y | |||
g ye | |||
.~ | |||
J | J f | ||
^-1-. | |||
==SUBJECT:== | ==SUBJECT:== | ||
Shearon Harris Nuclear Power Plant / Units No. l' | Shearon Harris Nuclear Power Plant / Units No. l' and 2 10CFR50.55(e),. reportable deficiency.''- | ||
and 2 10CFR50.55(e),. reportable deficiency.''- | l Thread, engagement of threaded studs into embedded strip. plates. | ||
ITEM: | |||
Improperly installdd threaded studs.on embedded i | |||
ITEM: | strip plates. These tapped strip plates and | ||
- I threaded studs have been used'in many cases in. | |||
lieu of strip plates with welded-on Nelson headed 4 | lieu of strip plates with welded-on Nelson headed 4 | ||
studs. | studs. | ||
" SUPPLIED BY:- | |||
Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field. | |||
insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I | -NATURE OF: DEFICIENCY: | ||
DATE PROBLEM WAS | The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have. | ||
insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I | |||
I | studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I-placements. | ||
DATE PROBLEM-REPORTED: | DATE PROBLEM WAS CONFIRMED TO EXIST: | ||
October 13, 1981. | |||
I DATE PROBLEM-REPORTED: | |||
. October.13, 1981, Mr. N. J. Chiangi. notified the | |||
I | ~ | ||
} | e NRC, Region II (Mr. R.. Butcher),.that the item l | ||
SCOPE OF PROBLEM:~ | was potentially reportable. -November 10, 1981, | ||
with screwed-in studs have.been ordered.-zTo'date, | ~ | ||
I Mr. N. J. Chiangi--. notifie'd the NRCi Region II. | |||
} | |||
(Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).- | |||
~ | |||
SCOPE OF PROBLEM:~ | |||
Approximately 1300 of the strip plates to be used with screwed-in studs have.been ordered.-zTo'date, r | |||
all inspection has been completed in-the contain - | |||
~ | |||
ment, fuel handling, reactor auxiliarys reactor | ment, fuel handling, reactor auxiliarys reactor | ||
. auxiliary-common,Mdiesel' generator, diesel fuel | |||
^ | |||
[ | [ | ||
oil storage. tank, tank l'and-2l buildings,< intake' and screening ~ structures. .A-large' number.of1 plates that have threaded studs'with improper | oil storage. tank, tank l'and-2l buildings,< intake' | ||
= | |||
and screening ~ structures..A-large' number.of1 plates that have threaded studs'with improper | |||
~ | |||
thread engagement;have.been found. :Also, hangers | thread engagement;have.been found. :Also, hangers | ||
~ | |||
~ | |||
[. | |||
~ | |||
have been foundEwelded'to plates that hav.ejthreaded: | have been foundEwelded'to plates that hav.ejthreaded: | ||
studsnwith imprope.r thre63: engagement. | |||
studsnwith imprope.r thre63: engagement | j' SAFETY-IMPLICATION:. | ||
j' | -Pipei' cable tray, and HVAC. hangers,.as;well'asi | ||
? | ? | ||
it | . other miscellaneous items, attach to these plates., | ||
+ | it | ||
: ment will possibly;beloverstressedtin normal | = Plates lwith studs not'having properf thread engage- | ||
+ | |||
h | : ment will possibly;beloverstressedtin normal i. | ||
[ | operation or during afseismic: event.- | ||
h | |||
~ REASON DEFICIENCY cIS REPORTABLE: | |||
pt | EReportable-due to.the magnitudeLofLthe problemt v | ||
[- | |||
,plus.the extensive' evaluation and/orirework required.1 J. | |||
^ | |||
pt L | |||
y 6 | |||
^h | |||
'T E | |||
p' xy ilb f); | |||
. E. | |||
t | |||
..., ~ | |||
: .\ ' | , :.\\ ' | ||
* CORRECTIVE ACTION: | * CORRECTIVE ACTION: | ||
Appropriate site work procedures have been | |||
' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs. | |||
In addition, all plates having insufficient thread engagement have been marked with stickers | In addition, all plates having insufficient thread engagement have been marked with stickers | ||
* identifying them. . Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW). ,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments. | * identifying them.. Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW).,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments. | ||
* Note on sticker reads: | * Note on sticker reads: | ||
CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments. | CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments. | ||
n i | n i | ||
b}} | b}} | ||
Latest revision as of 04:33, 15 December 2024
| ML20072Q775 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/29/1983 |
| From: | Parsons R CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CON-NRC-49 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304050317 | |
| Download: ML20072Q775 (4) | |
Text
.
-f' Cp&L Carolina Power & Light ce.spany h
P. O. Box 101, New Hill,-N. C.
27562 9@k (d
March 29, 1983 1
9.
gv
.e Mr. James P. O'Reilly NRC-49 Pp United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)
Atlanta, Georgia-30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63
Dear Mr. O'Reilly:
Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed.
If you have any questions regarding this matter, please do not hesitate to contact me.
Yours very truly, g W : =&
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:
Mr. G. Maxwell (NRC-SHNPP)
.Mr. V. Stello (NRC)
N A
sho4osoa d 85o329 T i
$ku_
^
C
- N a
i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f
i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s
THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES.
Reportable Under 10CFR50.55(e) J 4
2
'I s
+, ' '
p 4
g
+. -
,-.m-y
+.a e
g y
g ye
.~
J f
^-1-.
SUBJECT:
Shearon Harris Nuclear Power Plant / Units No. l' and 2 10CFR50.55(e),. reportable deficiency.-
l Thread, engagement of threaded studs into embedded strip. plates.
ITEM:
Improperly installdd threaded studs.on embedded i
strip plates. These tapped strip plates and
- I threaded studs have been used'in many cases in.
lieu of strip plates with welded-on Nelson headed 4
studs.
" SUPPLIED BY:-
Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field.
-NATURE OF: DEFICIENCY:
The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have.
insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I
studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I-placements.
DATE PROBLEM WAS CONFIRMED TO EXIST:
October 13, 1981.
I DATE PROBLEM-REPORTED:
. October.13, 1981, Mr. N. J. Chiangi. notified the
~
e NRC, Region II (Mr. R.. Butcher),.that the item l
was potentially reportable. -November 10, 1981,
~
I Mr. N. J. Chiangi--. notifie'd the NRCi Region II.
}
(Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).-
~
SCOPE OF PROBLEM:~
Approximately 1300 of the strip plates to be used with screwed-in studs have.been ordered.-zTo'date, r
all inspection has been completed in-the contain -
~
ment, fuel handling, reactor auxiliarys reactor
. auxiliary-common,Mdiesel' generator, diesel fuel
^
[
oil storage. tank, tank l'and-2l buildings,< intake'
=
and screening ~ structures..A-large' number.of1 plates that have threaded studs'with improper
~
thread engagement;have.been found. :Also, hangers
~
~
[.
~
have been foundEwelded'to plates that hav.ejthreaded:
studsnwith imprope.r thre63: engagement.
j' SAFETY-IMPLICATION:.
-Pipei' cable tray, and HVAC. hangers,.as;well'asi
?
. other miscellaneous items, attach to these plates.,
it
= Plates lwith studs not'having properf thread engage-
+
- ment will possibly;beloverstressedtin normal i.
operation or during afseismic: event.-
h
~ REASON DEFICIENCY cIS REPORTABLE:
EReportable-due to.the magnitudeLofLthe problemt v
[-
,plus.the extensive' evaluation and/orirework required.1 J.
^
pt L
y 6
^h
'T E
p' xy ilb f);
. E.
t
..., ~
, :.\\ '
- CORRECTIVE ACTION:
Appropriate site work procedures have been
' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs.
In addition, all plates having insufficient thread engagement have been marked with stickers
- identifying them.. Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW).,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments.
- Note on sticker reads:
CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments.
n i