=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
      -f' Cp&L                                               -
-f' Cp&L Carolina Power & Light ce.spany h
Carolina Power & Light ce .spany                   h         ,    .
P. O. Box 101, New Hill,-N. C.
P. O. Box 101, New Hill,-N. C.       27562               #
27562 9@k (d
March 29, 1983                                            9@k (d
March 29, 1983 1
1
9.
                                                                                                    $.      9. gv
gv
                                                                                                    .-        .e Mr. James P. O'Reilly                                               NRC-49               Pp       .
.e Mr. James P. O'Reilly NRC-49 Pp United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)
United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)
Atlanta, Georgia-30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63
Atlanta, Georgia- 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed.
Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed.
If you have any questions regarding this matter, please do not hesitate to contact me.
If you have any questions regarding this matter, please do not hesitate to contact me.
Yours very truly, g W : =&                                   ,,
Yours very truly, g W : =&
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:   Mr. G. Maxwell (NRC-SHNPP)
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:
                  .Mr. V. Stello (NRC)
Mr. G. Maxwell (NRC-SHNPP)
A i                                                -$N sho4osoa d 85o329 T
.Mr. V. Stello (NRC)
      $$                  $ku_         ^                                                           C
N A
 
sho4osoa d 85o329 T i
$ku_
^
C
:N a
:N a
i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f
i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f
i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s
i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s
THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES.
THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES.
.                                        Reportable Under 10CFR50.55(e) J 4
Reportable Under 10CFR50.55(e) J 4
2
2
                                                  'I s
'I s
                                                                                          + , ' '
+, ' '
p 4
p 4
g +. -       ,-.m-y +.a &                            e       g y   g     ye
g
+. -
,-.m-y
+.a e
g y
g ye


                    .~                               . .            .                          _ -.          .    . _                      .      _
.~
J           f;                                                                    ^-1-.
J f
^-1-.


==SUBJECT:==
==SUBJECT:==
Shearon Harris Nuclear Power Plant / Units No. l'                                                             ,
Shearon Harris Nuclear Power Plant / Units No. l' and 2 10CFR50.55(e),. reportable deficiency.''-
and 2 10CFR50.55(e),. reportable deficiency.''-                                                               l
l Thread, engagement of threaded studs into embedded strip. plates.
:              _                                                  Thread, engagement of threaded studs into embedded
ITEM:
                  .                                                strip. plates.
Improperly installdd threaded studs.on embedded i
ITEM:                                 Improperly installdd threaded studs.on embedded i                                                                 strip plates. These tapped strip plates and
strip plates. These tapped strip plates and
                                                                                                                                                                                -I threaded studs have been used'in many cases in.                   ,
- I threaded studs have been used'in many cases in.
lieu of strip plates with welded-on Nelson headed 4
lieu of strip plates with welded-on Nelson headed 4
studs.
studs.
                          " SUPPLIED BY:-                         Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field.
" SUPPLIED BY:-
                          -NATURE OF: DEFICIENCY:                 The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have.
Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field.
insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I                                                                 studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I-                                                               placements.
-NATURE OF: DEFICIENCY:
DATE PROBLEM WAS
The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have.
;-                        CONFIRMED TO EXIST:                   October 13, 1981.
insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I
I e
studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I-placements.
DATE PROBLEM-REPORTED:               . October.13, 1981, Mr. N. J. Chiangi. notified the
DATE PROBLEM WAS CONFIRMED TO EXIST:
                                                                                                ~
October 13, 1981.
.                                                                NRC, Region II (Mr. R.. Butcher),.that the item                                                               -
I DATE PROBLEM-REPORTED:
l                                                                was potentially reportable. -November 10, 1981,                                               ~
. October.13, 1981, Mr. N. J. Chiangi. notified the
I                                                                 Mr. N. J. Chiangi--. notifie'd the NRCi Region II .                                                           ,
~
}                                                                 (Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).-                                               ~
e NRC, Region II (Mr. R.. Butcher),.that the item l
SCOPE OF PROBLEM:~                     Approximately 1300 of the strip plates to be used r
was potentially reportable. -November 10, 1981,
with screwed-in studs have.been ordered.-zTo'date,                                                         '
~
;-                                                                all inspection has been completed in-the contain -
I Mr. N. J. Chiangi--. notifie'd the NRCi Region II.
                                                                                                        ~
}
(Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).-
~
SCOPE OF PROBLEM:~
Approximately 1300 of the strip plates to be used with screwed-in studs have.been ordered.-zTo'date, r
all inspection has been completed in-the contain -
~
ment, fuel handling, reactor auxiliarys reactor
ment, fuel handling, reactor auxiliarys reactor
                                                                . auxiliary-common,Mdiesel' generator, diesel fuel
. auxiliary-common,Mdiesel' generator, diesel fuel
                                                                                                                                  ^
^
[=
[
oil storage. tank, tank l'and-2l buildings,< intake' and screening ~ structures. .A-large' number.of1 plates that have threaded studs'with improper
oil storage. tank, tank l'and-2l buildings,< intake'
                                                                                              ~
=
                                                              ~
and screening ~ structures..A-large' number.of1 plates that have threaded studs'with improper
~
thread engagement;have.been found. :Also, hangers
thread engagement;have.been found. :Also, hangers
                                                                                      ~                                                   .
~
                                                    ~
~
[.
~
have been foundEwelded'to plates that hav.ejthreaded:
have been foundEwelded'to plates that hav.ejthreaded:
[. .
studsnwith imprope.r thre63: engagement.
studsnwith imprope.r thre63: engagement.                      .
j' SAFETY-IMPLICATION:.
j'                         SAFETY-IMPLICATION: .               -Pipei' cable tray, and HVAC. hangers,.as;well'asi
-Pipei' cable tray, and HVAC. hangers,.as;well'asi
?                                                               . other miscellaneous items, attach to these plates., .
?
it                                                           = Plates lwith studs not'having properf thread engage-
. other miscellaneous items, attach to these plates.,
+           -
it
: ment will possibly;beloverstressedtin normal
= Plates lwith studs not'having properf thread engage-
: i.                                                               operation or during afseismic: event.-                                                -
+
h                       ~ REASON DEFICIENCY v                        cIS REPORTABLE:                     EReportable-due to.the magnitudeLofLthe problemt                                                           ' *
: ment will possibly;beloverstressedtin normal i.
[-              -
operation or during afseismic: event.-
                                                              ,plus.the extensive' evaluation and/orirework required.1 J.                                                                                          .
h
                                                                                                                                                                  ^
~ REASON DEFICIENCY cIS REPORTABLE:
pt                                                                     >
EReportable-due to.the magnitudeLofLthe problemt v
                                                                            ^h
[-
                                                                            ,,                      'T                       #                L          y            6
,plus.the extensive' evaluation and/orirework required.1 J.
                      "                                                                                E p' xy ilb                     ,
^
        ..., ~            .      .    -        -    .      ._ E.       . ,.             ,,            .     -    t                          f);      ,        ,  ,
pt L
y 6
^h
'T E
p' xy ilb f);
. E.
t
..., ~


: .\ '
, :.\\ '
* CORRECTIVE ACTION: Appropriate site work procedures have been
* CORRECTIVE ACTION:
                              ' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs.
Appropriate site work procedures have been
' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs.
In addition, all plates having insufficient thread engagement have been marked with stickers
In addition, all plates having insufficient thread engagement have been marked with stickers
* identifying them. . Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW). ,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments.
* identifying them.. Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW).,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments.
* Note on sticker reads:
* Note on sticker reads:
CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments.
CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments.
n i
n i
b}}
b}}

Latest revision as of 04:33, 15 December 2024

Final Deficiency Rept Re Threaded Studs W/Insufficient Threaded Engagement Into Embedded Strip Plates.Initially Reported on 811013.All Deficient Plates Marked W/Stickers. Site Work Procedures Revised
ML20072Q775
Person / Time
Site: Harris  
Issue date: 03/29/1983
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CON-NRC-49 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304050317
Download: ML20072Q775 (4)


Text

.

-f' Cp&L Carolina Power & Light ce.spany h

P. O. Box 101, New Hill,-N. C.

27562 9@k (d

March 29, 1983 1

9.

gv

.e Mr. James P. O'Reilly NRC-49 Pp United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 3100)

Atlanta, Georgia-30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 THREADED STUDS WITH~ INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES, ITEM 63

Dear Mr. O'Reilly:

Attached is the final 10CFR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish resolu-tion. With this report, Carolina Power and Light Company considers this matter closed.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, g W : =&

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:

Mr. G. Maxwell (NRC-SHNPP)

.Mr. V. Stello (NRC)

N A

sho4osoa d 85o329 T i

$ku_

^

C

N a

i CAROLINA POWER & LIGHT COMPANY-SHEARON HARRIS NUCLEAR POWER PLANT f

i UNITS NO. 1 AND 2 FINAL REPORT March 29, 1983 ITEM 63' s

THREADED STUDS WITH INSUFFICIENT THREADED ENGAGEMENT INTO EMBEDDED STRIP PLATES.

Reportable Under 10CFR50.55(e) J 4

2

'I s

+, ' '

p 4

g

+. -

,-.m-y

+.a e

g y

g ye

.~

J f

^-1-.

SUBJECT:

Shearon Harris Nuclear Power Plant / Units No. l' and 2 10CFR50.55(e),. reportable deficiency.-

l Thread, engagement of threaded studs into embedded strip. plates.

ITEM:

Improperly installdd threaded studs.on embedded i

strip plates. These tapped strip plates and

- I threaded studs have been used'in many cases in.

lieu of strip plates with welded-on Nelson headed 4

studs.

" SUPPLIED BY:-

Not a supplier-related. deficiency. The studs and strip plates.were assembled'in the field.

-NATURE OF: DEFICIENCY:

The deficiency involves SeismicfCategory I embedded; strip plates with' screwed-in studs that have.

insufficient thread engagement.- - These screwed-in studs are used in' lieu of welded-on Nelson headed I

studs.-'The d.eficie'nt! plates / studs were found after concrete placements and acceptance of the I-placements.

DATE PROBLEM WAS CONFIRMED TO EXIST:

October 13, 1981.

I DATE PROBLEM-REPORTED:

. October.13, 1981, Mr. N. J. Chiangi. notified the

~

e NRC, Region II (Mr. R.. Butcher),.that the item l

was potentially reportable. -November 10, 1981,

~

I Mr. N. J. Chiangi--. notifie'd the NRCi Region II.

}

(Mr..-R. Butcher), that this item was' reportable per the provision of 10CFR50.55(e).-

~

SCOPE OF PROBLEM:~

Approximately 1300 of the strip plates to be used with screwed-in studs have.been ordered.-zTo'date, r

all inspection has been completed in-the contain -

~

ment, fuel handling, reactor auxiliarys reactor

. auxiliary-common,Mdiesel' generator, diesel fuel

^

[

oil storage. tank, tank l'and-2l buildings,< intake'

=

and screening ~ structures..A-large' number.of1 plates that have threaded studs'with improper

~

thread engagement;have.been found. :Also, hangers

~

~

[.

~

have been foundEwelded'to plates that hav.ejthreaded:

studsnwith imprope.r thre63: engagement.

j' SAFETY-IMPLICATION:.

-Pipei' cable tray, and HVAC. hangers,.as;well'asi

?

. other miscellaneous items, attach to these plates.,

it

= Plates lwith studs not'having properf thread engage-

+

ment will possibly;beloverstressedtin normal i.

operation or during afseismic: event.-

h

~ REASON DEFICIENCY cIS REPORTABLE:

EReportable-due to.the magnitudeLofLthe problemt v

[-

,plus.the extensive' evaluation and/orirework required.1 J.

^

pt L

y 6

^h

'T E

p' xy ilb f);

. E.

t

..., ~

, :.\\ '

  • CORRECTIVE ACTION:

Appropriate site work procedures have been

' revised requiring notification ~of-site engi-neering personnel prior to attaching any item to an embedded plate with screwed-in studs.

In addition, all plates having insufficient thread engagement have been marked with stickers

  • identifying them.. Plates having attachments have been identified and all have been evaluated by the' engineer using test data provided to them on shear resistance.- 'All eight plates previously identified as requiring corrective action have been reworked or accepted "as is".by a permanent waiver (PW).,To control attachments to these plates once-the plant becomes-operational, operations personnel have agreed to implement-inspection of the plates in their procedures prior to making any attachments.
  • Note on sticker reads:

CAUTION Anchor studs for this plate have reduced thread engagement. Evaluate plate load limits prior to making any attachments.

n i

b