A. OPERATING DATA REPORT s | |||
Docket No: 50 - 456 l Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 | |||
. OPERATING STATUS | |||
: 1) Reporting Period: December 1995 Gross Hours: 744 | |||
: 2) Currently Authorized Power Level (MWt): 3411 | |||
, Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Mr.x Dependable Capacity (MWe-net): 1120 | |||
: 3) Power level to which restricted (if Any): None | |||
: 4) Reasons for restrictions (If Any): None | |||
. This Mo. Yr to Date Cumulative i | |||
! 5) Report Period Hours: 744 8760 65073 l 6) Hours Reactor Critical: 547.6 6379.1 50977.9 | |||
: 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0 | |||
: 8) Hours Generator on Line: 427.1 6214.9 50180.7 | |||
: 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 1,004,550 20,040,969 158,484,816 11 Gross Elect. Energy (MWH): 328,304 6,886,498 53,390,320 12 Net Elect. Energy (MWH): 307,159 6,594,540 51,127,360 13 Reactor Service Factor: 73.6 72.8 78.3 14 Reactor Availability Factor: 73.6 72.8 78.3 15 Unit Service Factor: 57.4 70.9 77.1 16 Unit Availability Factor 57.4 70.9 77.1 17 Unit Capacity Factor (MDC NET): 36.9 67.2 70.2 18 Unit Capacity Factor (DER NET): 36.9 67.2 70.2 19 Unit Forced Outage Rate: 0.0 2.9 7.7 20 Unit Forcod Outage Hours: 0.0 184.0 4214.5 | |||
) | |||
21 Shutdown Schedule Over Next 6 Months: | |||
22 If Shutdown at End of Reporting Period, Estimated Date of Startup: | |||
C 9603120095 960306 > | |||
PDR ADDCK 05000456 R PDR}} | |||
Revision as of 02:44, 12 May 2020
| ML20100Q702 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/31/1995 |
| From: | Pershey C COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20100Q695 | List: |
| References | |
| NUDOCS 9603120095 | |
| Download: ML20100Q702 (1) | |
Text
.
A. OPERATING DATA REPORT s
Docket No: 50 - 456 l Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801
. OPERATING STATUS
- 1) Reporting Period: December 1995 Gross Hours: 744
- 2) Currently Authorized Power Level (MWt): 3411
, Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Mr.x Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (if Any): None
- 4) Reasons for restrictions (If Any): None
. This Mo. Yr to Date Cumulative i
! 5) Report Period Hours: 744 8760 65073 l 6) Hours Reactor Critical: 547.6 6379.1 50977.9
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 427.1 6214.9 50180.7
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 1,004,550 20,040,969 158,484,816 11 Gross Elect. Energy (MWH): 328,304 6,886,498 53,390,320 12 Net Elect. Energy (MWH): 307,159 6,594,540 51,127,360 13 Reactor Service Factor: 73.6 72.8 78.3 14 Reactor Availability Factor: 73.6 72.8 78.3 15 Unit Service Factor: 57.4 70.9 77.1 16 Unit Availability Factor 57.4 70.9 77.1 17 Unit Capacity Factor (MDC NET): 36.9 67.2 70.2 18 Unit Capacity Factor (DER NET): 36.9 67.2 70.2 19 Unit Forced Outage Rate: 0.0 2.9 7.7 20 Unit Forcod Outage Hours: 0.0 184.0 4214.5
)
21 Shutdown Schedule Over Next 6 Months:
22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
C 9603120095 960306 >