ML20078C788: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:' | ||
Fitnoss for Duty Progrcm Performance Data Personnel Subject to 10CFR26 (Revision 1) l1 Entercy Operations, Inc. | |||
2 June 30, 1994 I | |||
l l l Company 6 Months Ending l 1 I l3 l l River Bend Station /St. Francisville, LA l l Location l l l l4 5 l l William G. Durika (504) 381-4328 l l Contact Name Phone Number l I I l6 l l _ l l Cutoffs: Screen / Confirmation (ng/ml) l_l Appendix A to 10CFR26 l l l l Marijuana 100/15 Barbiturates 300/300 l l 1 l Cocaine 300/150 Methaqualone 300/100 l l l l Opiates 300/300 Methadone 300/300 l l l l Phencyclidine 25/25 Benzodiazepines 300/300 l l 1 l Amphetamines 1000/500 Alcohol 0.04%BAC/0.04%BAC l I I l l l Long-Term l Short-Term l l Testina Results I Licensee Employees l Contractor Personnel l Contractor Personnel l l Average Number with l lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l Unescorted' Access 7 l *2001 lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l l # I # I # I # I # I # I l Categories 8 l Tested i Positive l Tested l Positive l Tested l Positive l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Pre-Access l 96 1 0 l 1254 l 17 IXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l For l Post Accident l 0 l 0 l 4 l 0 lXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Cause lObnerved Behavior l 2 1 0 l 4 l 2 lXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl l Random I 344 1 0 l 317 1 0 lXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl j l Follow-up I 3 1 0 l 12 l O !XXXXXXXXXlXXXXXXXXXXl 4 l l l l l lXXXXXXXXXlXXXXXXXXXXl | |||
' Pre-employment l 0 l 0 l 3 ! O lXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Other i 4 1 0 l 0 l 0 IXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl l l Total l 449 l 0 l 1594 l 19 lXXXXXXXXXlXXXXXXXXXXl | |||
*Lonj & short term contract personnel included in this number 9411010~v0 PUR AngCK 941024 05000459 l | |||
R i PDR | |||
Breakdown of Confirmed Positive for. Specific Substances . | |||
(Revision 1) , | |||
l9 l l l l Ampheta-l Phency- l l Refusal l l l l l l lMariiuanal Cocaine ! Opiates I tamines I clidine ! Alcohol I to Test l 1 l 2 I3 l 4 l 1 I I i l l I I I I I I i l Licensee Employees l 0 1 0 1 0 1 0 l 0 1 0 1 0 l l l l l l l l l 1 1 I I I I I i 1 lLonc-term Cc-tractors 1 4 1 6 i 0 l 1 1 0 ! 5 1 2 11 I I l l l lXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXXl' lShort-term contractorsIXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXX1 A _ | |||
l l 1 1 I I I I I I I I I I l Total I 4 ! 6 1 0 l 1 1 O I 5 1 2 1 1 I I l 1 19l 1 = barbiturates 2- methaqualone 3 = nothadone 4 = benzadiazepines | |||
l 1 | |||
. \ | |||
~ | |||
\ | |||
Management Actions: l l | |||
. During this report period we had a total of nineteen (19) positive Fitness-for-Duty- ) | |||
(FFD) tests. Nineteen (19) of those were pre-access and part of the pre-screening l process during Refuel Outage 5 (RFO-5). ! | |||
Fitness-for-Duty Initiatives: | |||
. In our effort to support River Bend Station in a Customer Se'.vice environment, we elected to send all FFD specimens to our on-site laboratory at Grand Gr.lf Nuclear Station. This change allowed us to receive results from three (3) days down to less , | |||
than twenty-four (24) hours. : | |||
Effectiveness Evaluation: 7 | |||
. In an effort to streamline our process, we are currently working initiat ives to do i business the same way at each of our four sites. To make that task a reality, we are working to streamline our procedures and our process as a collective unit. | |||
. During the month of March we reduced our Random Testing from 100% to 50%. The big plus here is in monetary savings. | |||
I | |||
. Reference our 02/25/94 report, all items identified in the December FFD assessment ; | |||
have been corrected. | |||
Reportable incidents: | |||
- None this period. | |||
l 1 | |||
l l | |||
l | |||
!}} | |||
Revision as of 01:58, 20 May 2020
| ML20078C788 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/30/1994 |
| From: | Durika W ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20078C649 | List: |
| References | |
| NUDOCS 9411010330 | |
| Download: ML20078C788 (3) | |
Text
'
Fitnoss for Duty Progrcm Performance Data Personnel Subject to 10CFR26 (Revision 1) l1 Entercy Operations, Inc.
2 June 30, 1994 I
l l l Company 6 Months Ending l 1 I l3 l l River Bend Station /St. Francisville, LA l l Location l l l l4 5 l l William G. Durika (504) 381-4328 l l Contact Name Phone Number l I I l6 l l _ l l Cutoffs: Screen / Confirmation (ng/ml) l_l Appendix A to 10CFR26 l l l l Marijuana 100/15 Barbiturates 300/300 l l 1 l Cocaine 300/150 Methaqualone 300/100 l l l l Opiates 300/300 Methadone 300/300 l l l l Phencyclidine 25/25 Benzodiazepines 300/300 l l 1 l Amphetamines 1000/500 Alcohol 0.04%BAC/0.04%BAC l I I l l l Long-Term l Short-Term l l Testina Results I Licensee Employees l Contractor Personnel l Contractor Personnel l l Average Number with l lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l Unescorted' Access 7 l *2001 lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l l # I # I # I # I # I # I l Categories 8 l Tested i Positive l Tested l Positive l Tested l Positive l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Pre-Access l 96 1 0 l 1254 l 17 IXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l For l Post Accident l 0 l 0 l 4 l 0 lXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Cause lObnerved Behavior l 2 1 0 l 4 l 2 lXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl l Random I 344 1 0 l 317 1 0 lXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl j l Follow-up I 3 1 0 l 12 l O !XXXXXXXXXlXXXXXXXXXXl 4 l l l l l lXXXXXXXXXlXXXXXXXXXXl
' Pre-employment l 0 l 0 l 3 ! O lXXXXXXXXXlXXXXXXXXXXl l l l l l l lXXXXXXXXXlXXXXXXXXXXl l Other i 4 1 0 l 0 l 0 IXXXXXXXXXlXXXXXXXXXXl l l l l l lXXXXXXXXXlXXXXXXXXXXl l l Total l 449 l 0 l 1594 l 19 lXXXXXXXXXlXXXXXXXXXXl
- Lonj & short term contract personnel included in this number 9411010~v0 PUR AngCK 941024 05000459 l
R i PDR
Breakdown of Confirmed Positive for. Specific Substances .
(Revision 1) ,
l9 l l l l Ampheta-l Phency- l l Refusal l l l l l l lMariiuanal Cocaine ! Opiates I tamines I clidine ! Alcohol I to Test l 1 l 2 I3 l 4 l 1 I I i l l I I I I I I i l Licensee Employees l 0 1 0 1 0 1 0 l 0 1 0 1 0 l l l l l l l l l 1 1 I I I I I i 1 lLonc-term Cc-tractors 1 4 1 6 i 0 l 1 1 0 ! 5 1 2 11 I I l l l lXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXXl' lShort-term contractorsIXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXX1 A _
l l 1 1 I I I I I I I I I I l Total I 4 ! 6 1 0 l 1 1 O I 5 1 2 1 1 I I l 1 19l 1 = barbiturates 2- methaqualone 3 = nothadone 4 = benzadiazepines
l 1
. \
~
\
Management Actions: l l
. During this report period we had a total of nineteen (19) positive Fitness-for-Duty- )
(FFD) tests. Nineteen (19) of those were pre-access and part of the pre-screening l process during Refuel Outage 5 (RFO-5). !
Fitness-for-Duty Initiatives:
. In our effort to support River Bend Station in a Customer Se'.vice environment, we elected to send all FFD specimens to our on-site laboratory at Grand Gr.lf Nuclear Station. This change allowed us to receive results from three (3) days down to less ,
than twenty-four (24) hours. :
Effectiveness Evaluation: 7
. In an effort to streamline our process, we are currently working initiat ives to do i business the same way at each of our four sites. To make that task a reality, we are working to streamline our procedures and our process as a collective unit.
. During the month of March we reduced our Random Testing from 100% to 50%. The big plus here is in monetary savings.
I
. Reference our 02/25/94 report, all items identified in the December FFD assessment ;
have been corrected.
Reportable incidents:
- None this period.
l 1
l l
l
!