ML20083K929: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. . _                                                                       .
{{#Wiki_filter:.. _
NIAGARA N0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of March with a monthly unit availability factor of 51.8% and a net design electrical capacity factor of 41.3%.
NIAGARA N0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of March with a monthly unit availability factor of 51.8% and a net design electrical capacity factor of 41.3%.
The plant operated from March 1 to March 17 in a coastdown mode to 77.7% power. On March 17 the unit was removed from servic'e for a scheduled refueling and plant overhaul of approximately 8 weeks.
The plant operated from March 1 to March 17 in a coastdown mode to 77.7% power. On March 17 the unit was removed from servic'e for a scheduled refueling and plant overhaul of approximately 8 weeks.
CLASS I WORK - MAINTENANCE - MARCil 1984 WR# 21205         #12 RBCLC Installed new mech. seals, pump wear rings WR# 25138         #112 Containment Spray lleat Exchanger - inspection WR# 24524         Liquid Poison Valve #705 replaced stem WR# 25143         #121 Containment Spray lleat Exchanger - inspection l     WR# 24513         Cont. Spray R.W. Valve 93 took up on packing
CLASS I WORK - MAINTENANCE - MARCil 1984 WR# 21205
;    WR# 25137         #122 Containment Spray lleat Exchanger -inspection WR# 21479         #11 FWP seal waterline - replaced union l                       #12 FWP Warm up .line Valve (29-FW42) replaced valve l
#12 RBCLC Installed new mech. seals, pump wear rings WR# 25138
WR# 21207 WR# 25139         #112 Containment Spray lleat Exchanger - inspection, plugged tubes WR# 24434           FCV 50-20; inspect internals WR# 25104         FCV 50-20; Straighten stem WR#. 21208         #11 FWP Warm up line Valve (29-FW27) replaced valve WR# 23095         Removed Blank Flanges Liq. Poison 2 1/2" El. 298 Rx. Bldg.
#112 Containment Spray lleat Exchanger - inspection WR# 24524 Liquid Poison Valve #705 replaced stem WR# 25143
for ISI inspection WR# 23209         Component Support #33-1141 (misalignment)                                         .
#121 Containment Spray lleat Exchanger - inspection l
WR# 22381       ' Shutdown Cooling Pump #13 replaced shaft, impeller, wear rings WR# 25282         Penetration W-116 Added Knowool and Flamastic WR# 24567         Penetration RW-29 Added Knowool and Flamastic WR# 25281         Penetration W-19 Added Kaowool and Flamastic WR#. 25285       Penetration I-32 Added Knowool and Flamastic WR#- 25286       Penetration I-33 Added Kaowool and Flamastic CLASS I WORK - INSTRUMENTATION 6 CONTROL - MARCll 1984 WR# 23505         #12 Inst. Air Comp. loading ~ solenoids (rebuilt solenoid valves)
WR# 24513 Cont. Spray R.W. Valve 93 took up on packing WR# 25137
WR# 22127         Check operation of solenoid valves IA26 6 IA25, repair if necessary .(replaced coil on solenoids IA25 6.IA26) 8404170075 8400K32 PDR ADOCK 05000220
#122 Containment Spray lleat Exchanger -inspection WR# 21479
      . _R.                     PDR                                                     ,
#11 FWP seal waterline - replaced union l
l WR# 21207
#12 FWP Warm up.line Valve (29-FW42) replaced valve WR# 25139
#112 Containment Spray lleat Exchanger - inspection, plugged tubes WR# 24434 FCV 50-20; inspect internals WR# 25104 FCV 50-20; Straighten stem WR#. 21208
#11 FWP Warm up line Valve (29-FW27) replaced valve WR# 23095 Removed Blank Flanges Liq. Poison 2 1/2" El. 298 Rx. Bldg.
for ISI inspection WR# 23209 Component Support #33-1141 (misalignment)
WR# 22381
' Shutdown Cooling Pump #13 replaced shaft, impeller, wear rings WR# 25282 Penetration W-116 Added Knowool and Flamastic WR# 24567 Penetration RW-29 Added Knowool and Flamastic WR# 25281 Penetration W-19 Added Kaowool and Flamastic WR#. 25285 Penetration I-32 Added Knowool and Flamastic WR#- 25286 Penetration I-33 Added Kaowool and Flamastic CLASS I WORK - INSTRUMENTATION 6 CONTROL - MARCll 1984 WR# 23505
#12 Inst. Air Comp. loading ~ solenoids (rebuilt solenoid valves)
WR# 22127 Check operation of solenoid valves IA26 6 IA25, repair if necessary.(replaced coil on solenoids IA25 6.IA26) 8404170075 8400K32 PDR ADOCK 05000220
_R.
PDR


CLASS I - ELECTRICAL MAINTENANCE - MARCII 1984 WR# 21440     Containment Radiation Monitoring removed wires for App. J Mod WR# 23332     N2 Purge and Fill removed wires for App. J. Mod WR# 23333     Lontainment Radiation Monitoring removed wires for App. J. Mod WR# 24475     161 MG Set 600V Bkr. replaced overcurrent devices WR# 24489     13 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25084     11 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25097     CU System Return IV33-01 attached thermal heaters WR# 25173     Containment Radiation Monitoring replaced terminal block M0s 2131           Rx Protection System MG Set Alarms 3411           Core Spray /Rx Ilead Vent 3405           Remove Shutdown Panel Isol Mod.
CLASS I - ELECTRICAL MAINTENANCE - MARCII 1984 WR# 21440 Containment Radiation Monitoring removed wires for App. J Mod WR# 23332 N2 Purge and Fill removed wires for App. J. Mod WR# 23333 Lontainment Radiation Monitoring removed wires for App. J. Mod WR# 24475 161 MG Set 600V Bkr. replaced overcurrent devices WR# 24489 13 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25084 11 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25097 CU System Return IV33-01 attached thermal heaters WR# 25173 Containment Radiation Monitoring replaced terminal block M0s 2131 Rx Protection System MG Set Alarms 3411 Core Spray /Rx Ilead Vent 3405 Remove Shutdown Panel Isol Mod.
3384           ilPCI Low Flow Control System 2440           Primary Cont. Vent Post LOCA SURVEILLANCE TEST N1-MST-M1       125 VDC Battery Pilot Cell Voltage 6 Specific Gravity Test
3384 ilPCI Low Flow Control System 2440 Primary Cont. Vent Post LOCA SURVEILLANCE TEST N1-MST-M1 125 VDC Battery Pilot Cell Voltage 6 Specific Gravity Test


w       .
w 1
1         .
s
s       .s       .
.s OPERATING DATA REPORT 50-220 DOCKET NO.
OPERATING DATA REPORT DOCKET NO.
DATE 4/6/04 COMPLETED BY TW Roman TELEPHONE (315)349-2422 OPERATING STATUS Nine Mile Point Unit #1 Notes
50-220 DATE 4/6/04 COMPLETED BY TW Roman TELEPHONE (315)349-2422 OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:   Nine Mile Point Unit #1                                Notes
: 2. Reporting Period: 3/1/84 - 3/31/84
: 2. Reporting Period: 3/1/84 - 3/31/84
: 3. Licensed Thermal Power (MWt):         1850
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):           640                                         -
1850
: 5. Design Electrical Rating (Net MWe):     630
: 4. Nameplate Rating (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):         620
640 630
: 5. Design Electrical Rating (Net MWe):
620
: 6. Maximum Dependable Capacity (Gross MWe):
610
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
610
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To Which Restricted.If Any(Net MWe):
: 9. Power Level To Which Restricted.If Any(Net MWe):
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This Month             Yr..to-Date           Cumulative II. Hours in Reporting Period                             744.0                 1825.5           126.360.2
This Month Yr..to-Date Cumulative II. Hours in Reporting Period 744.0 1825.5 126.360.2
: 12. Number Of Hours Reactor Was Critical                   388.5                 1828.5             88.130.2
: 12. Number Of Hours Reactor Was Critical 388.5 1828.5 88.130.2
: 13. Reactor Reserve Shutdown Hours                           0                       0               1,204.2
: 13. Reactor Reserve Shutdown Hours 0
: 14. Hours Generator On Line                               385.5                 1825.5             85,313.8
0 1,204.2
: 15. Unit Reserve Shutdown Hours                               0                       0                   20.4
: 14. Hours Generator On Line 385.5 1825.5 85,313.8
: 16. Gross Thermal Energy Generated (MWH)             589,280.0             3,062,522.0         141,156,962.0
: 15. Unit Reserve Shutdown Hours 0
: 17. Gross Electrical Energy Generated (MWH)         196,936.0             1,034,284.0           46,666,065.0
0 20.4
: 18. Net Electrical Energy Generated (MWH).           190,366.0             1,001,923.0           45,196,682.0
: 16. Gross Thermal Energy Generated (MWH) 589,280.0 3,062,522.0 141,156,962.0
: 19. Unit Service Factor                                     51.8                         83.6             67.5
: 17. Gross Electrical Energy Generated (MWH) 196,936.0 1,034,284.0 46,666,065.0
: 20. Unit Availability Factor                                 51.8                         83.6             67.5
: 18. Net Electrical Energy Generated (MWH).
: 21. Unit Capacity Factor (Using MDC Net)                     41.9                        75.2              58.6
190,366.0 1,001,923.0 45,196,682.0
: 22. Unit Capacity Factor (Using DER Net)                     41.3                         74.0             57.7
: 19. Unit Service Factor 51.8 83.6 67.5
: 23. Unit Forced Outage Rate                                   0.0                           0.0             17.1 24, Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
: 20. Unit Availability Factor 51.8 83.6 67.5 41.9 75.2 58.6
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity Factor (Using DER Net) 41.3 74.0 57.7
: 23. Unit Forced Outage Rate 0.0 0.0 17.1 24, Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Biennial Refuel and Overhaul started 3/17/84
Biennial Refuel and Overhaul started 3/17/84
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/15/84
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/15/84
: 26. Units In Test Status (Prior to Commercial Operation):                       Foreca t             . Achieved l
: 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
Foreca t
                                                                                                                                '(4/77) t,_.--._-                                           --    ._ .                                                                    - - . . _ _ _
. Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
'(4/77) i t,_.--._-


AVER \GE D ALLY UNIT POh ER LEVEL DOCKET NO.             50-220 UNIT 9 blile Pt. #1 4/3/84 DATE CO\lPLETED BY TW Roman                           h, TELEPIIONE -(315)349-2422
AVER \\GE D ALLY UNIT POh ER LEVEL DOCKET NO.
                    . MONTH       Mnrr h 10Ra DAY     AVERACE DAILY POWER LEVEL                                                 DAY                             AVERAGE DAILY POWER LEVEL (MWe.NetI                                                                                                                       (ywe.x, 3 1                 509                                                               g7                                                                             13 2                 503 is                                                                                   0 3                 507 39                                                                                   0 4                 504                                                                                                                                                   0 20 5                 501 2g                                                                                   0       e 6                 501                                                              ,,
50-220 UNIT 9 blile Pt. #1 4/3/84 DATE CO\\lPLETED BY TW Roman h,
0 7                 500 33                     ,_                                                          0 8                 494 24                                                                                 -0 9                 491                                                                                                                                                  0                       -
TELEPIIONE -(315)349-2422
25 10                 494 26                                                                                   0 11                   492                                                                                                                                                   0 2-12                   49'1 33                                                                                   0 13                   487 29                                                                                   o 14                   486                                                                                                                                                   0 30 15 3g                                                                                    0' 16                   474 INSTRL*CTIONS On this format.hst the average daily unit power leselin MWe. Net for exh day in the repmemu in.inth.C.unpute o the nearest whole me;swort.                                                                                                                                                 '
. MONTH Mnrr h 10Ra DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe.NetI (ywe.x, 3 1
509 g7 13 2
503 is 0
3 507 39 0
4 504 20 0
5 501 2g 0
e 501 6
0 7
500 33 0
8 494 24
-0 491 9
0 25 10 494 26 0
11 492 2-0 12 49'1 33 0
13 487 29 o
14 486 30 0
15 0'
3g 16 474 INSTRL*CTIONS On this format.hst the average daily unit power leselin MWe. Net for exh day in the repmemu in.inth.C.unpute o the nearest whole me;swort.
d (917')
d (917')
i
i
                                                                                                      -___-------_----_.-___.__.------_-.---_----_-------.--_--_--.---------------------'--A
-___-------_----_.-___.__.------_-.---_----_-------.--_--_--.---------------------'--A


4 i
4 i
DOCKET NO.
50-220 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-220
UNIT NAME 9 Mile Pt. 1 DATE 4/0/64 m
* UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                       '
REPORT MONTH March 1984 COMPLETED BY TW Roman A g TELEPHONE (3151349-2412 w.
UNIT NAME 9 Mile Pt. 1                   .*    '
E E
DATE 4/0/64         m         .
.! ?
COMPLETED BY TW Roman A g REPORT MONTH March 1984                            TELEPHONE         (3151349-2412           .
3
w.
$YE Licensee
                                                                -      E                                 E Ibte
,E*
                                      ,      .! ?     3       $YE         Licensee           ,E*,      $*'.              Cause & Corrective No.                       i       EE       h     2 5 cE       Event             p         s8                     Action to H      g$ I. ci     j;gg       Report a           mO         j'                Prevent Recurrence d
Cause & Corrective No.
* 84-6     3/17/84         S                 C         1                                             Unit Shutdown for Biennial Refuel and Overhaul O
Ibte i
EE h
2 5 cE Event p
s8 Action to j'
Prevent Recurrence g$ I.
ci j;gg Report a mO H
d 84-6 3/17/84 S
C 1
Unit Shutdown for Biennial Refuel and Overhaul O
l c!
l c!
n, l
l n,
l                                                                                                                                                                             .
l
\
\\
l l         I                     2                                                           3                           4 l           F: Forced               Reason:                                                   Method:                       Exhibit G -Instructions
l l
* i            S: Scheduled           A-Equipment Failure (Explain)                             I Manual                     for Preparation of Data B Maintenance of Test                                     2 Manual Scram.               Entry Sheets for Licensee C Refueling                                               3 Automatic Scram.           Event Report (LER) File (NUREG-D Regulatory Restriction                                 4-Other (Explain)             0161)
I 2
E-Operator Training & License Examination F-Administrative                                     .                              5 G-Operational Errur (Explain)                                                           Exhibit I - Same Source 19/77)                     Il4)ther (Explain) amo .
3 4
l F: Forced Reason:
Method:
Exhibit G -Instructions i
S: Scheduled A-Equipment Failure (Explain)
I Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Errur (Explain)
Exhibit I - Same Source 19/77)
Il4)ther (Explain) amo.


NMP-8317 l
NMP-8317 l
l l
l l
NIAGARA MOHAWK POWER CORPORATION NIAGARA                         MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE.N Y.13202 AptLL 11, 1984 Qirector Office of Inspection and Enforcemen.t U.S. Nuetear Regulatory Commission it'asitington, DC   20555 ATTN:       Document and Control Desh Re: Docket No. 50-220 i                  DPR - 63
NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE.N Y.13202 AptLL 11, 1984 Qirector Office of Inspection and Enforcemen.t U.S. Nuetear Regulatory Commission it'asitington, DC 20555 ATTN:
Document and Control Desh Re:
Docket No. 50-220 DPR - 63 i


==Dear Sir,==
==Dear Sir,==
 
Subnitted Iterewitit is the Report of Operating Statistics and SItutdoten Experience for MarcIt 1984 for tite Nine I.llie Poiett Nuctcar Station Unit YI.
Subnitted Iterewitit is the Report of Operating Statistics and SItutdoten Experience for MarcIt 1984 for tite Nine I.llie Poiett Nuctcar Station Unit YI .
Also included is a narrative report of Operating Experience for Marcit 1984 Sincercly,
Also included is a narrative report of Operating Experience for Marcit 1984 Sincercly,
(         -
(
V' ' ! "&         91- 2       -
V' ' ! "&
Thomas E. Lempges Vice President Nueicar Generation TEL/Lo AttacItmenta cc: Director, Of fice of ISE (10 copies)
91-2 Thomas E. Lempges Vice President Nueicar Generation TEL/Lo AttacItmenta cc: Director, Of fice of ISE (10 copies)
                                                                                                      "A W}}
"A W}}

Latest revision as of 05:34, 14 December 2024

Monthly Operating Rept for Mar 1984
ML20083K929
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1984
From: Lempges T, Roman T
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NMP-8317, NUDOCS 8404170075
Download: ML20083K929 (6)


Text

.. _

NIAGARA N0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of March with a monthly unit availability factor of 51.8% and a net design electrical capacity factor of 41.3%.

The plant operated from March 1 to March 17 in a coastdown mode to 77.7% power. On March 17 the unit was removed from servic'e for a scheduled refueling and plant overhaul of approximately 8 weeks.

CLASS I WORK - MAINTENANCE - MARCil 1984 WR# 21205

  1. 12 RBCLC Installed new mech. seals, pump wear rings WR# 25138
  1. 112 Containment Spray lleat Exchanger - inspection WR# 24524 Liquid Poison Valve #705 replaced stem WR# 25143
  1. 121 Containment Spray lleat Exchanger - inspection l

WR# 24513 Cont. Spray R.W. Valve 93 took up on packing WR# 25137

  1. 122 Containment Spray lleat Exchanger -inspection WR# 21479
  1. 11 FWP seal waterline - replaced union l

l WR# 21207

  1. 12 FWP Warm up.line Valve (29-FW42) replaced valve WR# 25139
  1. 112 Containment Spray lleat Exchanger - inspection, plugged tubes WR# 24434 FCV 50-20; inspect internals WR# 25104 FCV 50-20; Straighten stem WR#. 21208
  1. 11 FWP Warm up line Valve (29-FW27) replaced valve WR# 23095 Removed Blank Flanges Liq. Poison 2 1/2" El. 298 Rx. Bldg.

for ISI inspection WR# 23209 Component Support #33-1141 (misalignment)

WR# 22381

' Shutdown Cooling Pump #13 replaced shaft, impeller, wear rings WR# 25282 Penetration W-116 Added Knowool and Flamastic WR# 24567 Penetration RW-29 Added Knowool and Flamastic WR# 25281 Penetration W-19 Added Kaowool and Flamastic WR#. 25285 Penetration I-32 Added Knowool and Flamastic WR#- 25286 Penetration I-33 Added Kaowool and Flamastic CLASS I WORK - INSTRUMENTATION 6 CONTROL - MARCll 1984 WR# 23505

  1. 12 Inst. Air Comp. loading ~ solenoids (rebuilt solenoid valves)

WR# 22127 Check operation of solenoid valves IA26 6 IA25, repair if necessary.(replaced coil on solenoids IA25 6.IA26) 8404170075 8400K32 PDR ADOCK 05000220

_R.

PDR

CLASS I - ELECTRICAL MAINTENANCE - MARCII 1984 WR# 21440 Containment Radiation Monitoring removed wires for App. J Mod WR# 23332 N2 Purge and Fill removed wires for App. J. Mod WR# 23333 Lontainment Radiation Monitoring removed wires for App. J. Mod WR# 24475 161 MG Set 600V Bkr. replaced overcurrent devices WR# 24489 13 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25084 11 Shutdown Cooling Pump Bkr. replaced overcurrent devices WR# 25097 CU System Return IV33-01 attached thermal heaters WR# 25173 Containment Radiation Monitoring replaced terminal block M0s 2131 Rx Protection System MG Set Alarms 3411 Core Spray /Rx Ilead Vent 3405 Remove Shutdown Panel Isol Mod.

3384 ilPCI Low Flow Control System 2440 Primary Cont. Vent Post LOCA SURVEILLANCE TEST N1-MST-M1 125 VDC Battery Pilot Cell Voltage 6 Specific Gravity Test

w 1

s

.s OPERATING DATA REPORT 50-220 DOCKET NO.

DATE 4/6/04 COMPLETED BY TW Roman TELEPHONE (315)349-2422 OPERATING STATUS Nine Mile Point Unit #1 Notes

1. Unit Name:
2. Reporting Period: 3/1/84 - 3/31/84
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

640 630

5. Design Electrical Rating (Net MWe):

620

6. Maximum Dependable Capacity (Gross MWe):

610

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted.If Any(Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to-Date Cumulative II. Hours in Reporting Period 744.0 1825.5 126.360.2

12. Number Of Hours Reactor Was Critical 388.5 1828.5 88.130.2
13. Reactor Reserve Shutdown Hours 0

0 1,204.2

14. Hours Generator On Line 385.5 1825.5 85,313.8
15. Unit Reserve Shutdown Hours 0

0 20.4

16. Gross Thermal Energy Generated (MWH) 589,280.0 3,062,522.0 141,156,962.0
17. Gross Electrical Energy Generated (MWH) 196,936.0 1,034,284.0 46,666,065.0
18. Net Electrical Energy Generated (MWH).

190,366.0 1,001,923.0 45,196,682.0

19. Unit Service Factor 51.8 83.6 67.5
20. Unit Availability Factor 51.8 83.6 67.5 41.9 75.2 58.6
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 41.3 74.0 57.7
23. Unit Forced Outage Rate 0.0 0.0 17.1 24, Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Biennial Refuel and Overhaul started 3/17/84

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/15/84
26. Units In Test Status (Prior to Commercial Operation):

Foreca t

. Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

'(4/77) i t,_.--._-

AVER \\GE D ALLY UNIT POh ER LEVEL DOCKET NO.

50-220 UNIT 9 blile Pt. #1 4/3/84 DATE CO\\lPLETED BY TW Roman h,

TELEPIIONE -(315)349-2422

. MONTH Mnrr h 10Ra DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe.NetI (ywe.x, 3 1

509 g7 13 2

503 is 0

3 507 39 0

4 504 20 0

5 501 2g 0

e 501 6

0 7

500 33 0

8 494 24

-0 491 9

0 25 10 494 26 0

11 492 2-0 12 49'1 33 0

13 487 29 o

14 486 30 0

15 0'

3g 16 474 INSTRL*CTIONS On this format.hst the average daily unit power leselin MWe. Net for exh day in the repmemu in.inth.C.unpute o the nearest whole me;swort.

d (917')

i

-___-------_----_.-___.__.------_-.---_----_-------.--_--_--.---------------------'--A

4 i

50-220 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME 9 Mile Pt. 1 DATE 4/0/64 m

REPORT MONTH March 1984 COMPLETED BY TW Roman A g TELEPHONE (3151349-2412 w.

E E

.! ?

3

$YE Licensee

,E*

Cause & Corrective No.

Ibte i

EE h

2 5 cE Event p

s8 Action to j'

Prevent Recurrence g$ I.

ci j;gg Report a mO H

d 84-6 3/17/84 S

C 1

Unit Shutdown for Biennial Refuel and Overhaul O

l c!

l n,

l

\\

l l

I 2

3 4

l F: Forced Reason:

Method:

Exhibit G -Instructions i

S: Scheduled A-Equipment Failure (Explain)

I Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Errur (Explain)

Exhibit I - Same Source 19/77)

Il4)ther (Explain) amo.

NMP-8317 l

l l

NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE.N Y.13202 AptLL 11, 1984 Qirector Office of Inspection and Enforcemen.t U.S. Nuetear Regulatory Commission it'asitington, DC 20555 ATTN:

Document and Control Desh Re:

Docket No. 50-220 DPR - 63 i

Dear Sir,

Subnitted Iterewitit is the Report of Operating Statistics and SItutdoten Experience for MarcIt 1984 for tite Nine I.llie Poiett Nuctcar Station Unit YI.

Also included is a narrative report of Operating Experience for Marcit 1984 Sincercly,

(

V' ' ! "&

91-2 Thomas E. Lempges Vice President Nueicar Generation TEL/Lo AttacItmenta cc: Director, Of fice of ISE (10 copies)

"A W