IR 05000259/2018410: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ary 1, 2018 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 1, 2018 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 28: | Line 28: | ||
The NRC inspectors did not identify any finding or violation of more than minor significance. | The NRC inspectors did not identify any finding or violation of more than minor significance. | ||
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, | This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response | However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
Sincerely, | Sincerely, | ||
/RA/ Binoy Desai, Chief Plant Support Branch | /RA/ | ||
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-259, 50-260 and 50-296 License Nos: DPR-33, DPR-52 and DPR-68 Enclosure: | |||
Division of Reactor Safety | NRC IR 05000259/2018410, 260/2018410 and 296/2018410 w/Attachment: Supplemental Information (OUO) | ||
cc: (See page 3) cc: | |||
Docket Nos: 50-259, 50-260 and 50-296 License Nos: DPR-33, DPR-52 and DPR-68 Enclosure: NRC IR 05000259/2018410, 260/2018410 and 296/2018410 | Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Mr. R. Dawson Acting Senior Manager, Site Security Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 PAB 2G-BFN Athens, AL 35609 Mr. D. Lang Hughes General Manager, Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Mr. Glen E. Pry Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 Mr. James A. Kent Director, Plant Support Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE RLP5 JCS3 JDG4 BBD ADM2 BBD NAME R. Patterson J. Shehee D. Golden B. Desai A. Masters B. Desai DATE 01/ 24 /2018 01/ 24 /2018 01/ 24 /2018 01/ 30 /2018 01/ 31 /2018 02/ 1 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO | ||
w/Attachment: Supplemental Information (OUO) | |||
cc: (See page 3) cc: Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A | |||
Chattanooga, TN 37402-2801 | |||
Mr. R. Dawson Acting Senior Manager, Site Security Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 PAB 2G-BFN | |||
Athens, AL 35609 Mr. D. Lang Hughes General Manager, Site Operations | |||
Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN | |||
Decatur, AL 35609 | |||
Mr. Glen E. Pry Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 | |||
Mr. James A. Kent | |||
Director, Plant Support | |||
Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN | |||
Decatur, AL 35609 | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE RLP5 JCS3 JDG4 BBD ADM2 BBD NAME R. Patterson J. Shehee D. Golden B. Desai A. Masters B. Desai DATE 01/ 24 /2018 01/ 24 /2018 01/ 24 /2018 01/ 30 /2018 01/ 31 /2018 02/ 1 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} |
Latest revision as of 00:03, 22 October 2019
ML18032A468 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 02/01/2018 |
From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
To: | James Shea Tennessee Valley Authority |
References | |
IR 2018410 | |
Download: ML18032A468 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ary 1, 2018
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000259/2018410, 05000260/2018410 AND 05000296/2018410
Dear Mr. Shea:
On January 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Browns Ferry Nuclear Plant, Units 1, 2, and 3, and discussed the results of this inspection with Mr. D. Hughes and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety Docket Nos: 50-259, 50-260 and 50-296 License Nos: DPR-33, DPR-52 and DPR-68 Enclosure:
NRC IR 05000259/2018410, 260/2018410 and 296/2018410 w/Attachment: Supplemental Information (OUO)
cc: (See page 3) cc:
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Mr. R. Dawson Acting Senior Manager, Site Security Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 PAB 2G-BFN Athens, AL 35609 Mr. D. Lang Hughes General Manager, Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Mr. Glen E. Pry Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 Mr. James A. Kent Director, Plant Support Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRS/PSB RII:DRP/BR6 RII:DRS/PSB SIGNATURE RLP5 JCS3 JDG4 BBD ADM2 BBD NAME R. Patterson J. Shehee D. Golden B. Desai A. Masters B. Desai DATE 01/ 24 /2018 01/ 24 /2018 01/ 24 /2018 01/ 30 /2018 01/ 31 /2018 02/ 1 /2018 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO