ML082460771: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:September 17, 2008  
{{#Wiki_filter:September 17, 2008 Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
 
Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708  


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)  
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)


==Dear Mr. Bell:==
==Dear Mr. Bell:==


By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, "Quality Assurance Program Description," Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.  
By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, Quality Assurance Program Description, Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.
 
U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants. Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.
U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, "Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants.Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.
On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.
 
On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.  
 
If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.
If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.
Sincerely,    
Sincerely,
                                              /RA/
William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors


          /RA/
Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708  


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)  
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)


==Dear Mr. Bell:==
==Dear Mr. Bell:==


By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, "Quality Assurance Program Description," Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.  
By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, Quality Assurance Program Description, Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.
 
U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants. Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.
U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, "Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants.Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.
On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.
 
On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.  
 
If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.
If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.
Sincerely,    
Sincerely,
              /RA/             William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors Project No. 689  
                                                /RA/
William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors Project No. 689


==Enclosure:==
==Enclosure:==


As stated Distribution
As stated Distribution:
: (See on next page) ADAMS Accession Number: ML082470229 (package) OFFICE PM:DNRL/NRGA LA:DNRL/NRGA BC:DCIP/CQV B BC:DCIP/CQVP BC:DNRL/NRGA NAME SBurrows RRobinson JNakoski   JPeralta WReckley DATE 09/ 17 /2008 09/17/2008 09/9/2008 09/9/2008 09/17/2008                                                                               OFFICIAL RECORD COPY  
(See on next page)
ADAMS Accession Number: ML082470229 (package)
OFFICE       PM:DNRL/NRCA    LA:DNRL/NRCA    BC:DCIP/CQVB  BC:DCIP/CQVP BC:DNRL/NRCA NAME         SBurrows       RRobinson       JNakoski       JPeralta     WReckley DATE         09/ 17 /2008   09/17/2008       09/9/2008     09/9/2008     09/17/2008 OFFICIAL RECORD COPY


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)
REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)
 
Distribution:
Distribution
PUBIC NRCA R/F SBurrows, NRO RRobinson, NRO RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNroDnrl RidsNroDnrlNrga RidsNroDnrlNoep RidsNroDnrlNge1 RidsNroDnrlNge2 RidsNroDnrlNwe1 RidsNroDnrlNwe2 RidsNroDnrlNmip RidsNroDcip RidsNroDcipCqvb RidsNroDcipCqvp}}
: PUBIC NRGA R/F SBurrows, NRO RRobinson, NRO RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNroDnrl RidsNroDnrlNrga RidsNroDnrlNoep RidsNroDnrlNge1 RidsNroDnrlNge2 RidsNroDnrlNwe1 RidsNroDnrlNwe2 RidsNroDnrlNmip RidsNroDcip RidsNroDcipCqvb RidsNroDcipCqvp}}

Latest revision as of 14:27, 14 November 2019

Request for Additional Information Regarding Nuclear Energy Institute Technical Report 06-14A, Quality Assurance Program Description, Revision 5 (Project No. 689; TAC Q00014)
ML082460771
Person / Time
Site: Nuclear Energy Institute
Issue date: 09/17/2008
From: William Reckley
NRC/NRO/DNRL
To: Bell R
Nuclear Energy Institute
Burrows, S A, NRO/DNRL/NRGA, 415-6086
Shared Package
ML082470229 List:
References
NEI-06-14A, Rev 5, TAC Q00014
Download: ML082460771 (3)


Text

September 17, 2008 Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)

Dear Mr. Bell:

By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, Quality Assurance Program Description, Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.

U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants. Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.

On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.

If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.

Sincerely,

/RA/

William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors

Mr. Russell J. Bell, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)

Dear Mr. Bell:

By letter date May 7, 2008, the Nuclear Energy Institute (NEI) submitted changes to NEI Technical Report 06-14A, Quality Assurance Program Description, Revision 5. NEI 06-14A provides a template for a quality assurance program description (QAPD) to be applied to activities affecting the quality and performance of safety-related structures, systems, and components.

U.S. Nuclear Regulatory Commission staff has reviewed NEI 06-14A, Revision 5, in accordance with the provisions of Draft Standard Review Plan Section 17.5, Quality Assurance Program Description - Design Certification, Early Site Permit and New License Applicants. Based on our review of the NEI Technical Report, the staff has determined that additional information is required to complete our review. Our request for additional information (RAI) is attached.

On August 21, 2008, an electronic copy of the enclosed RAI was transmitted to NEI. Although this RAI has already been provided to you electronically, we will not expect a response until 30 days following the date of issuance of this letter; therefore, please let me know if you will not be able to provide your written reply within that time period.

If you have any questions or comments regarding this matter, please contact Ms. Sheryl A. Burrows by telephone at (301) 415-6086 or by e-mail at Sheryl.Burrows@nrc.gov.

Sincerely,

/RA/

William D. Reckley, Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors Project No. 689

Enclosure:

As stated Distribution:

(See on next page)

ADAMS Accession Number: ML082470229 (package)

OFFICE PM:DNRL/NRCA LA:DNRL/NRCA BC:DCIP/CQVB BC:DCIP/CQVP BC:DNRL/NRCA NAME SBurrows RRobinson JNakoski JPeralta WReckley DATE 09/ 17 /2008 09/17/2008 09/9/2008 09/9/2008 09/17/2008 OFFICIAL RECORD COPY

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING NUCLEAR ENERGY INSTITUTE TECHNICAL REPORT 06-14A, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 5 (PROJECT NO. 689; TAC Q00014)

Distribution:

PUBIC NRCA R/F SBurrows, NRO RRobinson, NRO RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNroDnrl RidsNroDnrlNrga RidsNroDnrlNoep RidsNroDnrlNge1 RidsNroDnrlNge2 RidsNroDnrlNwe1 RidsNroDnrlNwe2 RidsNroDnrlNmip RidsNroDcip RidsNroDcipCqvb RidsNroDcipCqvp