| number = ML092920121
| number = ML12338A648
| issue date = 10/19/2009
| issue date = 10/19/2009
| title = IR 05000003-09-008, 05000247-09-008 and 05000286-09-008 on 08/18/2009 - 09/04/2009 for Indian Point, Units 1, 2 & 3;
| title = Official Exhibit - ENT000343-00-BD01 - Indian Point Nuclear Generating Units 1, 2 & 3 - NRC Inspection Reports Nos. 05000003/2009008; 05000247/2009008 and 05000286/2009008
| author name = Roberts D
| author name = Roberts D
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Pollock J
| addressee name = Pollock J
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc, NRC/ASLBP
| docket = 05000003, 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-005, DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person =  
| contact person = SECY RAS
| case reference number = FOIA/PA-2010-0209, FOIA/PA-2016-0148
| case reference number = RAS 22132, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
| document report number = IR-09-008
| document report number = IR-09-008
| document type = Inspection Report, Letter
| document type = Legal-Exhibit
| page count = 17
| page count = 17
}}
}}
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ber 19, 2009
{{#Wiki_filter:ENT000343 Submitted: March 29, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
Identified:
Admitted: Withdrawn:
ber 19, 2009


==SUBJECT:==
==SUBJECT:==
INDIAN POINT NUCLEAR GENERATING UNITS 1, 2 & 3 - NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008
INDIAN POINT NUCLEAR GENERATING UNITS 1,2 & 3 -NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008


==Dear Mr. Pollock:==
==Dear Mr. Pollock:==
On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff.
On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff. 'The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control. The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities.


The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control.
Based on the results of this inspection, no findings of significance were identified.


The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission
Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the .Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment.
=s rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities.


Based on the results of this inspection, no findings of significance were identified. Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment.
Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements.


Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements. Our inspectors confirmed that the objectives specified in our deviation  
Our inspectors confirmed that the objectives specified in our deviation memorandum dated December 16,2008 (ML083590057)
have been satisfied.


memorandum dated December 16, 2008 (ML083590057) have been satisfied. However, we will continue to monitor your performance in this area, and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 performance.
However, we will continue to monitor your performance in this area , and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 perfonmance.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room).
=s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Darrell J. Roberts, Director Division of Reactor Safety Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 Enclosure:
/RA by Peter R. Wilson for/
Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment:
Darrell J. Roberts, Director Division of Reactor Safety  
Supplemental Information cc w/encj: Distribution via ListServ
 
Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64  
 
Enclosure: Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment: Supplemental Information  
 
cc w/encl: Distribution via ListServ
}}
}}

Revision as of 10:12, 15 July 2019

Official Exhibit - ENT000343-00-BD01 - Indian Point Nuclear Generating Units 1, 2 & 3 - NRC Inspection Reports Nos. 05000003/2009008; 05000247/2009008 and 05000286/2009008
ML12338A648
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/19/2009
From: Darrell Roberts
Division of Reactor Safety I
To: Joseph E Pollock
Entergy Nuclear Operations, Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22132, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR IR-09-008
Download: ML12338A648 (17)


Text

ENT000343 Submitted: March 29, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:

Identified:

Admitted: Withdrawn:

ber 19, 2009

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNITS 1,2 & 3 -NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008

Dear Mr. Pollock:

On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff. 'The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control. The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities.

Based on the results of this inspection, no findings of significance were identified.

Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the .Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment.

Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements.

Our inspectors confirmed that the objectives specified in our deviation memorandum dated December 16,2008 (ML083590057)

have been satisfied.

However, we will continue to monitor your performance in this area , and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 perfonmance.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room).

Darrell J. Roberts, Director Division of Reactor Safety Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 Enclosure:

Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment:

Supplemental Information cc w/encj: Distribution via ListServ