|
|
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML092920121 | | | number = ML12338A648 |
| | issue date = 10/19/2009 | | | issue date = 10/19/2009 |
| | title = IR 05000003-09-008, 05000247-09-008 and 05000286-09-008 on 08/18/2009 - 09/04/2009 for Indian Point, Units 1, 2 & 3; | | | title = Official Exhibit - ENT000343-00-BD01 - Indian Point Nuclear Generating Units 1, 2 & 3 - NRC Inspection Reports Nos. 05000003/2009008; 05000247/2009008 and 05000286/2009008 |
| | author name = Roberts D | | | author name = Roberts D |
| | author affiliation = NRC/RGN-I/DRS | | | author affiliation = NRC/RGN-I/DRS |
| | addressee name = Pollock J | | | addressee name = Pollock J |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc, NRC/ASLBP |
| | docket = 05000003, 05000247, 05000286 | | | docket = 05000247, 05000286 |
| | license number = DPR-005, DPR-026, DPR-064 | | | license number = DPR-026, DPR-064 |
| | contact person = | | | contact person = SECY RAS |
| | case reference number = FOIA/PA-2010-0209, FOIA/PA-2016-0148 | | | case reference number = RAS 22132, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR |
| | document report number = IR-09-008 | | | document report number = IR-09-008 |
| | document type = Inspection Report, Letter | | | document type = Legal-Exhibit |
| | page count = 17 | | | page count = 17 |
| }} | | }} |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ber 19, 2009 | | {{#Wiki_filter:ENT000343 Submitted: March 29, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of |
| | : Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) |
| | ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #: |
| | Identified: |
| | Admitted: Withdrawn: |
| | ber 19, 2009 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| INDIAN POINT NUCLEAR GENERATING UNITS 1, 2 & 3 - NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008 | | INDIAN POINT NUCLEAR GENERATING UNITS 1,2 & 3 -NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008 |
|
| |
|
| ==Dear Mr. Pollock:== | | ==Dear Mr. Pollock:== |
| On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff. | | On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff. 'The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control. The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities. |
|
| |
|
| The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control.
| | Based on the results of this inspection, no findings of significance were identified. |
|
| |
|
| The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission
| | Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the .Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment. |
| =s rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities.
| |
|
| |
|
| Based on the results of this inspection, no findings of significance were identified. Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment.
| | Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements. |
|
| |
|
| Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements. Our inspectors confirmed that the objectives specified in our deviation
| | Our inspectors confirmed that the objectives specified in our deviation memorandum dated December 16,2008 (ML083590057) |
| | have been satisfied. |
|
| |
|
| memorandum dated December 16, 2008 (ML083590057) have been satisfied. However, we will continue to monitor your performance in this area, and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 performance.
| | However, we will continue to monitor your performance in this area , and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 perfonmance. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room). |
| =s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,
| | Darrell J. Roberts, Director Division of Reactor Safety Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 Enclosure: |
| /RA by Peter R. Wilson for/
| | Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment: |
| Darrell J. Roberts, Director Division of Reactor Safety | | Supplemental Information cc w/encj: Distribution via ListServ |
| | |
| Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 | |
| | |
| Enclosure: Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment: Supplemental Information | |
| | |
| cc w/encl: Distribution via ListServ | |
| }} | | }} |
|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
ENT000343 Submitted: March 29, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
- Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
Identified:
Admitted: Withdrawn:
ber 19, 2009
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNITS 1,2 & 3 -NRC INSPECTION REPORT NOS. 05000003/2009008; 05000247/2009008; AND 05000286/2009008
Dear Mr. Pollock:
On September 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Units 1, 2, & 3. The enclosed report documents the inspection results, which were discussed on August 19 and September 4, 2009, with Mr. Don Mayer and other members of your staff. 'The purpose of this inspection was to assess the establishment, implementation, and maintenance of your Long-Term Groundwater Monitoring Program; review the circumstances surrounding a previously identified occurrence involving the detection of tritated water in a Unit 3 storm drain system; review the performance of the site's Radiation Monitoring System; and inspect and assess your performance relative to radiological effluents monitoring and control. The inspection involved an examination of activities conducted under Entergy's license as related to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observations of activities, interviews with personnel, and independent assessment activities.
Based on the results of this inspection, no findings of significance were identified.
Further, the inspectors determined that Entergy's Long-Term Groundwater Monitoring Program for the .Indian Point Energy Center was effectively implemented and maintained in a manner that provided continued radiological monitoring of the groundwater conditions to confirm conformance with NRC regulatory requirements relative to the maintenance of public health and safety, and protection of the environment.
Since 2005, as approved by NRC's Executive Director of Operations, Region I conducted frequent and focused reviews of your groundwater investigation activities and long-term monitoring program that exceeded the scope of NRC's normal baseline inspection program. As a result, we have developed confidence in your commitment and ability to continue effective monitoring and assessment of the on-site conditions to assure the maintenance of public health and safety, protection of the environment, and conformance with NRC regulatory requirements.
Our inspectors confirmed that the objectives specified in our deviation memorandum dated December 16,2008 (ML083590057)
have been satisfied.
However, we will continue to monitor your performance in this area , and will re-assess the need for continued heightened inspection oversight during our end-of-cycle review of your CY 2009 perfonmance.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room).
Darrell J. Roberts, Director Division of Reactor Safety Docket Nos: 50-003, 50-247, 50-286 License Nos: DPR-5, DPR-26, DPR-64 Enclosure:
Inspection Report Nos. 05000003/2009008, 05000247/2009008, 05000286/2009008 w/Attachment:
Supplemental Information cc w/encj: Distribution via ListServ