IR 05000182/2010201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 6, 2010  
{{#Wiki_filter:uly 6, 2010


Mr. Jere Jenkins, Director Purdue University Radiation Laboratory School of Nuclear Engineering 400 Central Drive West Lafayette, IN 47904-2017
==SUBJECT:==
PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO.


SUBJECT: PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO. 50-182/2010-201
50-182/2010-201


==Dear Mr. Jenkins:==
==Dear Mr. Jenkins:==
Line 29: Line 30:
Based on the results of this inspection, no safety concern or noncompliance of requirements was identified. No response to this letter is required.
Based on the results of this inspection, no safety concern or noncompliance of requirements was identified. No response to this letter is required.


In accordance with Title 10 of the Code of Federal Regulations Part 2.390 "Public inspections, exemptions, and requests for withholding" a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.
In accordance with Title 10 of the Code of Federal Regulations Part 2.390 Public inspections, exemptions, and requests for withholding a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.


Should you have any questions concerning this inspection, please contact Gary "Mike" Morlang at 301-415-4092 or by electronic mail at Gary.Morlang@nrc.gov.
Should you have any questions concerning this inspection, please contact Gary Mike Morlang at 301-415-4092 or by electronic mail at Gary.Morlang@nrc.gov.


Sincerely,
Sincerely,
/RA/ Johnny H. Eads, Jr., Chief Research and Test Reactor Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-182 License No. R-87 Enclosure: As stated cc w/ encl: See next page July 6, 2010 Mr. Jere Jenkins, Director Purdue University Radiation Laboratory School of Nuclear Engineering 400 Central Drive West Lafayette, IN 47904-2017
/RA/
Johnny H. Eads, Jr., Chief Research and Test Reactor Oversight Branch uly 6, 2010


SUBJECT: PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO. 50-182/2010-201 Dear M
==SUBJECT:==
PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO.
 
50-182/2010-201
 
Dear M
}}
}}

Latest revision as of 17:30, 13 November 2019

IR 05000182-10-201 on 06/07/10 - 06/10/10 for Purdue University, Routine Inspection Report
ML101870018
Person / Time
Site: Purdue University
Issue date: 07/06/2010
From: Johnny Eads
Research and Test Reactors Branch B
To: Joel Jenkins
Purdue University
Morlang, G M, NRR/DPR, 415-4092
References
IR-10-201
Download: ML101870018 (13)


Text

uly 6, 2010

SUBJECT:

PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO.

50-182/2010-201

Dear Mr. Jenkins:

The U.S. Nuclear Regulatory Commission (NRC) conducted an inspection on June 7-10, 2010, at your Purdue University Reactor (Inspection Report No. 50-182/2010-201). The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress.

Based on the results of this inspection, no safety concern or noncompliance of requirements was identified. No response to this letter is required.

In accordance with Title 10 of the Code of Federal Regulations Part 2.390 Public inspections, exemptions, and requests for withholding a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this inspection, please contact Gary Mike Morlang at 301-415-4092 or by electronic mail at Gary.Morlang@nrc.gov.

Sincerely,

/RA/

Johnny H. Eads, Jr., Chief Research and Test Reactor Oversight Branch uly 6, 2010

SUBJECT:

PURDUE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO.

50-182/2010-201

Dear M